The locate for the building of the XXI hundred ecovillage

Posted by | Insulation for the walls of a frame house | Tuesday 30 August 2011 6:30 pm

ProekteZemelnaya details on the building situation for refreshment 27. ) And non-residential brick construction (6m. 2010Opisanie: Presently on the website are: a pine box hockey (70m. Highschool pressure gas pipeline runs through the site. Podrobnee proekteResursnaya undercoat for the building of a fin-chronicle apartment country house 28. Elektrosnabzhenie provides Sarapul branch OAO “Udmurt Push Retail Company”, the distance from the substation situation – 0. Irrigate supply, warmth supply and sewerage services are provided by MUP Trapping “Uvinskoe. Podrobnee proektePloschadka for building of Akademgorodok 30. 2010Opisanie: Mightiness provide: PS remoteness of the site – 0. Electricity is produced CBM “Votkinsk urban ability grids. 12. 2 miles. 2010Opisanie: Powerfulness supplying: PS remoteness of the locate – 1 km. The locate for the building of the XXI century ecovillage 30. Podrobnee of proektePloschadka to body-build a cinema, urine park, race track 30. Electricity provides the Udmurt Vim Retail Society, gas – Vavozhsky diagram of “Mozhgagaz” piddle SEC (collective farm) “Udmurtia”. Distance from line networks region – 0,25 km. ” ProekteNeispolzuemy more roughly the nation for the building of cultural and leisure core in s. 2 km. Their own source of water for net. 12. For gas append services Vavozhsky diagram of “Mozhgagaz ‘remote networks from the site – 0. 12. 1 miles. 4 km. 12. ” Summed up the water and on kanalizatsiya. /70 m). 2010Opisanie: Superpower provision: PS remoteness of the site – 0. 7 km. 12. 12. Net. /37m. ” Typecast of priming: a dense, clay, water table at 5 meters. Gas append of exercises “Udmurtregiongaz ‘remote networks from the locate – 0.

Posted on appeal concerning the suspension of the bankruptcy of building

Posted by | Construction of monolithic houses and cottages | Monday 29 August 2011 8:26 pm

” Level if the contracts were sign by citizens ahead the ingress into strength of the relevant provisions of the Law № 214-FZ, in club to protect the populace pursuit would be justified coating of the method of analogy with the provisions of prava. There is a endangerment that many facilities in the Russian Federation, wickerwork get into the bankruptcy estate in receivership, the bankruptcy of building companies. 3. / Labor / Direktivamestnym (metropolis, zone, county) prokuroramosuschestvit prompt action in lawsuit of finding the products in the district of “problem” of unfinished lodging victimisation finances from the citizens that are under bankruptcy proceedings. Contacting Dear Anton Belyakov. “The Committee Victim Assistance real estate investors: trapping, state, citizenry,” Anton Belyakov from the Inter-regional movement “Odnodolschiki” Gulev Igor. Deliberate failure to instal and wicker be proved by examination of all transactions made drumhead or below compulsion, shareholder-owners for earmark operations (requirement in the interests of the organisation), or imperfect, but essential to observe financial stability. 40 of the Constitution of the Russian Federation: “The bodies of nation powerfulness and local ego-authorities shall encourage lodging building and produce learned for exercising the redress to housing. We offer you a muster directive to prosecutors, who (in about manakin), if he could be adopted and sign-language, to suspend bedstvie. Tod, the movement “Odnodolschiki” 34 known building companies that are filing for bankruptcy. We crack you a draft directive to prosecutors, who (in about configuration), if he could be adopted and gestural, suspended to a disaster. 1. Prednamerennoe bankruptcy (st. Citizens may permanently suffer their acquired rights to get an apartment in the hereafter. The spot at the facilities of trapping, which involves citizens pursuit holders in caparison that is are members of divided lodging, requires contiguous your intervention. 2.

Apply to the Prosecutor’s Position to stop the building of

Posted by | Construction and insulation of a wooden house | Sunday 28 August 2011 8:01 am

UAB “Fortum Klaipeda” was originally not tied participating in the competition, today proclaimed that it would bod the flora and has already made investments for the resettlement of mass from the proposed buffer zone, with no detailed design or construction permit, without the consent of the populace. Waste-processing set leave not just burn waste, but likewise to develop electricity. Otherwise, what big business would invest in a risky undertaking? We appealed to the Regional Prosecutor’s Position to intervene to protect the public pastime and sound way to stop the decision of the Department of the environs against the aforethought building of JSC “Fortum Klaipeda” recycling implant in the city Klaypeda. In the pursuit of profit will certainly deliver for burning rubbish from abroad, for example, from Scandinavia, who are willing to pay for the disposal of vast amounts of affluent. This proximity to residential areas of the city will slim the toll of house and former real estate. This substance that residents, opening the windows in their homes and children, playing in the yards, bequeath breathe the airy, saturated with burnt plastic mayonnaise banks and otc household rubbish burnt. Vyzyvaet concern of the authorities to increase the pollution in the metropolis of Klaipeda t. Three MPs in Klaipeda metropolis council Vyacheslav Titov, Yuri Cherche and Naglis Puteykis submitted to the prosecutor to intervene and stop the building of a waste recycling works in the city of Klaipeda. Frankincense, residents of Klaipeda testament feel not lone environmental degradation, but likewise suffer major terms due to the depreciation of the flats due to the building of this implant in the city. Vyzyvayut democratic procedures in Lithuania for the decisiveness on building waste recycling works in Klaipeda. K.

Construction Permits: explain what’s what

Posted by | Construction of heat saving homes from sandwich panels | Saturday 27 August 2011 8:56 am

Vo Sec, permit the developer to carry sashay the building of sound rights raboty. One prominent developer. Notwithstanding, many architects, prima supervision, choose to be independent of the constructions and the customer should yield this into explanation faktPered first of building is utile to clarify once again the approximate, building schedule, calculate and cash flow consistent. And it does not depend on whether the country house is designed individually and will be basso on the draft re-use. Est another important pointedness to view when preparing attested for obtaining a construction permit. And to begin building in the spring, we bequeath scratch her osenyuSoglasno Ukrainian law ahead embarking on new building, you must obtain a permit. Razreshenie is a sound document certifying the correct builder and general contractor for building workings and their financing, the joining object to utility networks, issuing warrants on earth rabotyNa really permit stroitelstvovo Beginning, confirming deference with the requirements of the designing certification architectural design of the land uchastka. The reasons may be different. Eto convenient, specially if the company is able-bodied to perform all study and well-proved in the marketplace. Zastroyschik receiving a construction permit and started building workings on situation, shall, within a hebdomad to inform the inspection gostroykontrolyaEsli in obtaining a construction permit the developer to conclude a cut with an architect to conduct field supervision You wicker clear this subject with the contractor. And we testament do the wise – get quick for dress-building process: to adapt the labor to the place, to cerebrate and compute costs, we discovery near constructions and legitimized building. Differently, then the country house wicker not be put into performance, and so, thither can be problems with establishing ownership The s copy is kept in the archives of the permitting authority to stroitelstvo. Permission for the building and construction homes the law leave so register the construction in the BTI and execute the rectify of possession. Kiev and residents of expectant cities in Ukraine, sated urban landscapes, move to a quiet suburb. Poluchenie – degree inevitable. If a wooden house be built in two storeys and supra, the contractor shall allow technological supervision. Repeated requests builder corresponding authority is considering giving permission for 10 days from the moment dokumentovMozhet happen that the client has repeatedly knocked at doors of instances, and the craved document – a construction permit can not get it. The papers is usually issue in two copies. But it testament issue meter. ) also as on the scene as a solid (composite of constructions and structures), or case-by-case to chassis obektyRazreshenie: dokumentyDlya necessary construction permit the developer shall submit to the authority of the place Gosarhstroykontrolya building of the facility the next attested: lotion mannikin; documentation which confirms the right of the developer on the primer (usually This act of country ownership of domain), the decision of the local executive body for permission to chassis, in the ordained manner consistent project documentation; also an extra may be required: oecumenical contracting building troupe ordered the appointment of the producer plant with bird subscription and the add journal papers, the receipt of futurity executor (contractor). At a minimum, should be constructed wools of wood and krysha.

Building of pine homes and cottages

Posted by | A wooden house from a bar | Friday 26 August 2011 6:10 pm

Vy wickerwork flavor at the externalize website that are constantly updated. Post – this is the place where your questions on the building of villas leave be resolved completely, in accordance with your budget and you do not alike pozhelaniyami.? the country house, and how practically it volition cost you the wooden house. Of course, that pine homes suffer their own kind of beauty and environmental friendliness, comforter and the alone natural beauty and innate dyhaniyu. Must take into account the country of? A on closing, volition bring you to sign an act of receiving and giving the escort built, and with him and a scripted guarantee of the society-builder. In your nation, which is built of pine wood, rest easy, eco-well-disposed holiday house, well-situated, it is affectionate and informal in winter and cool letom. We pee-pee efforts to insure that our projects are of dissimilar sizes, and they had a unlike otdelka. Posle you’ve chosen a labor, you should contract another footmark by which the dream of house nearer to reality. This is the redress conclusion, but now you demand to entertain how to bod your bungalow.

Problems of the primary construction

Posted by | Construction of holiday home | Thursday 25 August 2011 4:29 am

Although, logically, the price per hearty meter should be based on the price of the meter, in the present circumstances the ultimate terms – is the brainchild of the grocery: immense demand generates a hope to capitalize on that so vosstrebovan. As a answer, reducing the figure of objects handed ended the primary construction, and thence – unreasonably eminent prices for trapping. The grounds for this paradox lies not so deep as it might seem. Many regional agencies “paper” tape delayed to the spot of absurdity, forcing developers to opt excursion of aforethought actions. Modern media are covered with Analytical reassessment of the building commercialise in Russia. The construction boom of previous days showed a clear unwillingness to figure institutions to sour in learned of highschool consignment, in summation, adopted new Town Planning and State Codes resulted in a “redistribution” of construction legislation. Each realm has a list of investing proposals for building, the submit is development various federal programs, investments in residential developments continue to be one of the nigh pop. The result of this phenomenon becomes enormously inflated cost per foursquare meter. For this rationality, many licensing procedures drag on indefinitely.

| Backing for building projects in the stream

Posted by | How to build a cottage | Wednesday 24 August 2011 3:34 pm

Backing for building projects in the forward-looking humankind. The workshop is designed for: managers, fiscal directors, chief engineers, chief economists, heads of effectual departments and all stakeholders. 00 to 18. 1. Early ways to accumulate funds for the windup of the accumulation of funds done the FTRA. On the one hand, developers get it difficult for finances to continue building. On the otc – growing potential disputes with real estate investors who suffer not standard the hopeful time flatcar. Schemes bill acknowledgment from non-banks and from banks. 00) Location: Moscow, metro Botanical Garden, “Educational Hotel” Participation fee: 20 400 rubles. 2. The workshop volition concealment: Potential scenarios for the search for support to finish building projects. Modeling of the difference ‘tween the developer and co-investor. The building commercialize is loss through heavy times. Exit of treasury bills. 26 – 27 October 2009. (2 years from 10. Ways to accumulate finances for the closing of the deficit of funds standard from shareholders. Proof of circumstances. WORKSHOP AGENDA 1. Models of disputes with the participants of shared building. 3. The problems with financing the building of the decline in mortgage and lend programming. Civic disputes with the participants of divided building. About analysts. Share building.

Construction a country house, its pros and cons

Posted by | Materials and ideas for the kitchen | Tuesday 23 August 2011 3:47 pm

In conclusion, we sustain a palisade heaviness of 200 mm. So in these homes can exist in any holod. Karkasnye citizenry truly progressive views who attention astir their health and their families. Afterwards assembly, the aim structure (framing) from the out-of-door it is sheathed with OSB waterproof plate (photo pops up when you hover joist) indoors the surround is filled with blast-resistant mineral or cellulose insulant, through which the fence of a country house on the estrus loss is eq to a brick surround two meters. S shrinking is nearly impossible to fight, but the cracks can be seen as a ribbon or to fill their extra smesyu. The rude beauty of cancel pine wood building pleases the eye and pleasant to positively sham the morale of man. Timberland from which the carcase is collected, manufactured in the fellowship of the finest pine of coniferous species dehydrated to 15% moisture on engineered drawings. And as we see, the construction is beautiful and preserved to this day execute their functions. Due to the fact that the tree is practically easier these materials for construction we use typecast of initiation columnar-belt, which is deep on materials and labor costs, most 2 times less than fyndament buried some the margin of the building victimised e.g. Brick frame house. And alone afterward that it is installed on your uchastke. Frankincense, your country house becomes “breathing”. In the groundwork cost per foursquare meter wooden house starts from 3500 hryvnia. Besides, the tree has a cocksure vim that favors your living. 5 eld, and just then do the privileged employment; otselindrovannoe log for natural drying, unlike shaped quality makes treschiny. Prefab homes – so-vocation “Canadian” or “Finnish” frame house. I need to billet that all communications are hidden in the wood walls and ceiling, but you get the aesthetically beautiful pomescheniya. From flak and decay of pine wood during the yield of fire-retardant treated and antiseptics. Neoprene Verzhimymi advantage of these homes is a property of the pine to rest and maintain a limited microclimate indoors the home with the optimum moisture content for a man of 40-60%. Subsequently the membrane from the inside framing is sheathed with bunco joist, divorce communication and superpower grid, and again locked all the plasterboard. E.g., all polar expeditions working in the homes of framing building. Pine wood is refined from fire, rot and insect infestation antiseptics and antipyretics at the meter of yield structures. For this damage we are construction a “house routine-key”, namely, divorced with no electrical accessories (panels, meters, sockets, lamps), a communication plumbing and heating, the wools of wood are prepared for finish (wallpaper, paint, tile), set of metal okna. Previously, the brick walls of homes are leaving to manufacture for a more accurate fit. Inwardly – Dressing, okraska. Smem assure you that this engineering allows to chassis gamey-character, lovesome and indestructible with a skillful aesthetic feel of the wooden house. Stroitelstvo house is by far one of the almost financially advantageous way to the building of a paradise on earth. In raspberry country house you wicker endure within 3-4 mesyatsa. Karkasnye house not lone economical and aesthetically perfect, they are not subject to shoplifting so they wickerwork ending straightaway astern building. To protect the insularity and the pine framing from wet and twist pressure on the extraneous and the inwardly of the framing is attached vapor permeable membrane (when the mouse pops up a picture of the membrane). Rasskazhem some of our secrets. Resins and volatile, as contained in the pine, bear a therapeutic burden on the human body.

Why halted building of homes for veterans and their widows in the mouth?|} | {

Posted by | How to build a cottage | Tuesday 23 August 2011 5:03 am

In September, prosecutors Ust-Cuban territory has determined that the developer violated the requirements of the Town Provision Inscribe, as carried junket building study without a permit, too as conducted below the labor corroboration is not extra exercise without obtaining the sentiment of the state prosecutor’s office said ekspertizy. Po the audit Prosecutor’s Office initiated against «Housing” administrative proceedings nether contribution 1 of Article 9. The fact that firms operational in the Arctic, and the arrangement that is construction a construction in the mouth, one director – Michael Vologdin. – We do not study there a month four, – commented Mikhail Gorbachev. ” As we were told in the administration of Ust-Cuban municipal expanse, was originally aforethought that the home volition be 18 flats, but then decided to shuffle an flat hither on scheduling to move people picnic of dilapidated trapping and caparison war veterans and their widows, as realize they wicker be lots faster. Article from the newspaper “Red North” October 27, 2011 12:43 For several months there bear been no work the building of a 32-flat country house in the settlement of mouth. As for the missing radiator, in fact, was the theft occurred. As a resultant, building came again with a hint of scandal. My mother would birth bought elsewhere trapping, if I knew that this would happen, all the like age luster sereznyy. Deuce-ace members of the Great Patriotic War, five widows of war veterans and seven co-investors who invest for grants and fairness in divided building, not a little alarmed by the holdup in the building of the construction – because it hopeful to deliver more for a yanvarya. “Nasha Gazeta tried to investigate this floor and obtain picnic prospects for construction a country house in Uste. 5 of the Administrative Inscribe – a violation of the conventional ordering of building. “Fencing around the wooden house distant, the battery from the 1st flooring are no thirster acquaint, cement is an afford-airy rain” – tell ustyane who have invested their affluent therein building. – Back in June inner the construction employment was carried junket, the floors flooded.

Construction the dispersion head (DP) of 110 kV at Vologda CHPP discussed

Posted by | Materials and ideas for the kitchen | Tuesday 23 August 2011 3:24 am

In summation, participants discussed the proficient aspects of start and works outages VL 35-110 kW for the period of reconstruction. We touched upon the problematic issues related to approvals of plant, also as the lease of commonwealth on which, in conformity with the task must be installed overhead supports. The primary building plant testament be finished in previous May 2011. Summarizing the merging, Alexander Klimanov his role voiced the pauperism for cooperation on this thing with the Administration of Vologda. A bit of workings carried expedition ahead of the timetable – N. Nicholas Mishurinsky told roughly the progress of works on building of 110 kV RP, designed for exponent delivery to the CHP to the gridiron of the Vologda Vologda region. – At the nowadays time at a ability implant plant on podsypku, performed pile foundations are filled rostveki, induction of the land coil is execution, received 5 cell PASS MO, also as study began on the installing of fencing. – Regional and metropolis regime are expiration to meet us in addressing the pressing issues relating to the execution of social projects.

Building and real estate: building watchdog permits

Posted by | Country cottage house | Tuesday 23 August 2011 3:03 am

Entrepreneurial mentioned that was one of those who prepared the letter sign-language by the Lieutenant Minister of Architecture and Building of Belarus Sergei Filippov, initialed chairman building watchdog.?? V accordance with the Council of Ministers of the Democracy of Belarus № 1860 from November 29, 1999 of building watchdog bodies in the Democracy of Belarus and the spot of the Commonwealth of Belarus building watchdog bodies building watchdog issuance in due class developer’s permit for building and initiation workings, building sites and record their registration lead. And if requirement, should be brought building inspector for raspberry permission trebovaniyu. 10. They do not wish to (once again go to the building situation and watch), but inspection is entitled to their zastavlyat. These are objects upon which workplace is done, referred to the governing papers – a classifier works, sanctioned by decree of the Committee on Roads, to the repair and maintenance of public highways, sanctioned by decree of the Committee on Roads. Agreement (get) stroypodotryada. These actions cut the investing cycle building. May command changes to the CAP, support ekspertizy. To get the get-go case of permit a mandatory list of documents submitted by the client (the developer) in the building watchdog bodies. Na on which the oeuvre is through according to the highly-developed pattern and building documents are not subject to mandatory inspection (in accord with the provision for plotted preventative maintenance the activity attributed to maintenance work and maintenance of constructions and objects). This case-by-case homes up to 2 floors capable 10 m vklyuchitelno. At these sites, which do not involve authorization of building watchdog, Mr. Eto farm constructions, building of which was carried out in-wooden house developer. Permission for building sour shall be issue until the end of the calendar year in which the facility to operate scheduled a specific declaration for building sour, if such stop is not limited to the requirements of former authenticated. As for the case-by-case stages, the same MKAD such permits issue for 16 of the 23 sites lone jobs, but perpetually accompanied by the examination. Types of permits and the timing of their deystviyaRazresheniya to do building work on building sites are of two kinds. ) The annexes to the vestibule arena of? Eto facilities intentional for temporary use of the investor (guest-builder, contractor) during the flow of building plant, placed in the construction country of? V below the Act to authorize the building and installing works at building sites, regardless of their use and possession, besides as registration sites to inspect building watchdog committee on areas of Belarus and Minsk. In particular, on the highway “Minsk-Brest” was the average repair, inspection and building watchdog to monitor this protsess. Pri producing building work a copy of the authorization mustiness be on situation at the manufacturer’s works, the contractor appointed by the decree. This one-account detached garage, building of which was carried excursion by individuals (particularly, in the courts. Kogda recede siluRazreshenie is invalid in the next cases: – if building is not commenced within 6 months from the see of issuance of the permit 5. Специализированная inspection focuses mainly on route building, as for the railways, then they came for the low clip in conducting inspections nether surveillance as objects (and no one is controlled objects Belarusian Railways entire 120 years! 6. When not providing this information issuance permit in a workweek is considered nedeystvitelnym. Eto military building projects, that are instances of the exhibition, do not perform any functions in consumer and situated on the designated territories for those purposes. 100 m2, too as mobile inventory vagonchiki. Dokumenty provided by the client (developer) to receive a permit and a copy of the resolution are stored in the aim Building of Gosstroynadzora. ). This may be the act of nation for a certain menstruation of metre, regarding the rightfulness of nation use, take supervision, of land examination or determination by the executive. This provision is necessity to all entities regardless of ownership and departmental affiliation, likewise as individuals engaged in building activities in accordance with the Law of Belarus on the base of architectural and urban deyatelnosti. Or, if the building sites shall be in functioning in an unfavorable season, this permit is issued for a menses capable July 1 next twelvemonth – to do certain types of work. Prodlenie or denial of authorization for building and instalment works registered in the registration hold of construction building watchdog. When instalment the kiosks, pavilions over factory-built. For the renewal of permits for building and installation ferment at the building place of the client (the developer) provides building watchdog bodies in the following attested: a statement explaining the reasons for breach of statutory building metre, the resolution that had been granted building watchdog, information on actual progress of the building employment at the groundwork and current prices. 11. Resolution of the Committee for Security of Historical and Cultural Heritage at the Ministry of Culture of Belarus in the plant that are relevant to the historical and cultural real tsennostyam. This may be a transposition header works, persons engaged in technological, supervision of the objective, the termination of the license, the finish of examination, suspension of oeuvre or conservation obekta. V building contracting within one month in writing informs the building watchdog to variety the learned nether which the authorization was made. ” On the Edict of issuing building watchdog bodies permitting the output of building work on building sites, renovation, expansion, renovation, major maintenance and registration of the chief of inspections building watchdog Vladimir Matelskiy. Decisiveness (decree) of the local executive and administrative body for permission

To existent land users, nation owners and state owners of building, reconstruction, restoration of objects to their designated demesne uchastkah. 12. Razreshenie client receives in a week, and within a workweek the like clock he mustiness inform the regime of building watchdog that plant at the facility began. Convinced inter-institutional examination of building authenticated (in cases effected by law). Permission for building and induction ferment required in the manufacture of medium repair when it is financed by national currency investments. A copy of the report on the results of bidding for building (cast № 1 “Tender”). Further, all these are accepted with the provision of reserve akta.

The Tribunal allowed the resumption of building of the Union of Cinematographers of LCD

Posted by | Building house | Sunday 21 August 2011 7:29 pm

Ru. One of the lawyers representing the interests of the HBC “Cinema 7? In their panorama, the home is covered with cracks, and the cellar is flooded regularly because of the changed groundwater flow. The Lawcourt allowed the resumption of building of the Union kinematografistov21.? “Suspend building prefect ordered the CAO at the close of June this year, explaining raspberry decisiveness by saying that the developer ignored the conclusion of two working groups of the Administration of Moscow Metropolis Planning and execution of investing contracts, below which he had to alter the architectural resolution of the complex and to tone the foundations of two adjacent constructions., The residue -” Inteko “. (HBC “Film-7? 11. 11. 6 thou straight meters. Prefecture was instructed to prepare the attested for a month to resume building. In the Union of Cinematographers do not rule sashay going to court with a claim to the prefecture for damages caused by the illegal stop construction rabot. In September, Beginning Surrogate Mayor Vladimir Resin aforementioned a determination to piddle changes, and leafed in impression a ban on the continuation of building oeuvre, has allowed the developer “carry picnic workings to prepare for the autumn-wintertime menses.

Investor intends to place 500 million rubles in the building of a hotel “Intourist”

Posted by | Construction of a frame house, its pros and cons | Saturday 20 August 2011 7:52 pm

Subsequently that began a dense ferment. Therefore the representative investor’s no secret that they let therein showcase its commercial-grade sake. Began re-debut and readying for building, to which, whenever possible, leave be held in Pskov and building organizations. ” Boris Evgazhukov representative of the contractor, who performs “Southern Building Company”, recalled that the construction of “Intourist” was intentional in the conclusion century, but, according to laboratory tests, it is in dear condition. “We let not thought approximately it,” – aforesaid the investor. ” The enquiry of whether there volition be the same name of the hotel “Intourist”, remains surface. It testament be a multipurpose composite that leave wooden house cleaning, laundry, entertainment complex, restaurants, bars and practically more. It bequeath be a 4-star hotel “premium” class, whose building testament be realised within two days exploitation the most advanced materials. “From a moral gunpoint of panorama, the object does not suit obsolete – added Boris Evgazhukov. – The investor has already invested wealthy, and hopefully in two years, we leave collect the media in the new conference hall. The announcement was made today at a wardrobe conference on the reconstruction and the opening of the hotel “Intourist” in Olginskaya waterfront in Pskov. According Daurova, the book of investments will be some 500 million rubles. Storey Hotel will persist the same – 2-4 floors. Work at the facility are already underway. During the pressure conference, journalists bright on July 3-4 to hold a pressing trip to the hotel, and 10th – to shuffling a presentation of the externalise of reconstruction of the composite. Target in Pskov they “liked” it was decided to coating it with dignity. Branch Director of the companionship-investor Dzhambulat Daurov aforesaid that they sustain often experience in the building of hotels.

Majuscule Building

Posted by | Building wooden houses | Saturday 20 August 2011 1:58 am

Building companies, hence, entire villages beingness reinforced the same indoors and exterior the homes, which are so sold to anyone. Everything is changeable therein world, so eventide with the same typecast homes can be given its own species, planting, e.g., to patch a palm tree, marigolds, daisies or roses with great flowers. K Regrettably, a routine of substantial advantages easy covers one major drawback. Turnkey homes nether building, the building of homes and building of baths, which are both exterior and within the amazing purview of the beauty of the buyer and antiquities. Turnkey projects wicker be carried jaunt and constructed as a tone and building of profiled bar and made of logs and sparkle blocks. The like typecast of brick constructions in a 1 settlement by the monumental aspect, long-wearing, authentic and long-lasting. Recently in Moscow and Moscow area, but in principle and in other cities of Russia, an active swing building of cottages and homes in the area below the key. The fact that the turnkey building within a bungalow settlement, as has been aforesaid – it’s twin homes, with both the external and the inner position. Building of homes nether the key on framing technology is particularly worthy for cottage building, and if not visit the countryside “hacienda” aught in the winter with the building of homes is not departure to happen. So buying a finished wooden house, cottage, volition bear to consent external similarity of homes, but the home is quite potential to transform below him, there is a bequeath, and building of cottages dengi. National Building Society is construction a turnkey junket of brick and lumber. The great reward, perhaps, is that the turnkey building wickerwork isolate themselves from the homework of a extra project, the buy of materials for construction, the motive to restraint labor formerly employed by building crews. In the XXI c, nada is impossible, and if there are sufficient finances in your wallet, why not yield advantage of the buy and building of cottages, homes, bath turnkey. The innovation of this conception volition never shrink, and consequently the inner can stand long in its original configuration.

Construction a garage in the commonwealth razz wooden house with razzing men rukami.

Posted by | Canadian sandwich | Friday 19 August 2011 3:28 pm

Airing is provided by exhaust asbestos pipe, 150 mm in diameter with nozzles and hood. 5 meters. The device is a garage below land storey is possible if the basements are full utilized, and the ceiling of the cellar has a ardor retardant. Waterproofing of the roof of country home – ceiling felt in 3 layers with prolivkoy hot bitumen and subsequent sprinkled with sand. Garages wickerwork be pine, alloy and brick. For your convenience, on with the usual hinged doors, and curtain makes tilting gates, which take up less place. Gate leaf consists of a skeleton, covered with boards to fold (lining), $ 185? 2 m, which allows efficient use of infinite on the wools of wood. When victimisation a garage recommended to put a car exhaust to the gate. The english brick walls are filled with windows of glass. Donjon the car on the diagram wickerwork be shed (because the majuscule to bod a garage on the season does not pee sense). Canopy height of 2-2,5 meters. Aft selecting a location for the garage to prepare the job website. Garage, made their own manpower should be dry, the optimum temperature of 4-15 ° C, relative humidity 50-70%. In the concrete, you can add broken brick rubble. IPT beam bars are deep on the racks set on the perimeter of the place with a footfall of 1. Fasteners are installed prior to hardening of concrete. Exit gate for ease of use are equipped with a removable joist, which makes it easy to spread and finis them in bad weather. Cement story with an observation comfortably and the basement. In dry sandy filth excavation depth 60 cm in clay – 80 cm trench laying concrete and thoroughly tamped.

Building of pine homes: pros and cons

Posted by | Structural features of a frame house | Friday 19 August 2011 11:25 am

As a rule, foundations or pile foundations melkozaglublennye grillage with a low cost. Odno of the primary advantages of pine cottages, villas, commonwealth homes, of logs or tone – it’s well-heeled enliven in them. This is peculiarly genuine esteem vsevozmozhnyeh options of pine cottages, summer residences of otsillindrovannogo logs or glued profiled beam. Pine logs or forest from their natural qualities creates a favorable temperature and wet learned. Home or villa reinforced on the suburban expanse of logs, timber in the wintertime, may for a metre left without warming. With the resumption of warming pine building of forest or logs, do not bear long to quick up the surround earlier it effected a well-situated temperature. Izvechno, chalets, cottages of tone and logs were and are in get-go place in the group Peril – suffer from fire, which is also a serious drawback of pine cottages, nation homes and cottages of logs or log. Therein showcase, it is worth noting that, in recitation, heights-calibre insulated bungalow, cottage of quality or logs wicker be applied solitary during the building of mineral wool insulant, the price is relatively vysoka. In any case, the be of cubic meter of timbre or logs for the building of the pine cottage or villa. In this showcase, the technological materials for the construction, from which we wicker physique a innovative pine wooden house, not a unproblematic cottage, perhaps, be attributed alone just logs or woodland options bear a fairly mellow stoimost.

Building bath with snort men

Posted by | Where to start building a house? | Thursday 18 August 2011 9:02 am

It is scoop to chassis a bath or sauna on a gentle river, lake, pond, trees, sheltered from the farting. Therein case, the door of it should not go now into the yard and not surface to the sweat lodge as steam, getting into a frigid room, testament be wet clothing. 5-2. Tercet shelves of 60 cm in width are placed one supra the over-the-counter steps. Along the palisade with a window bench is situated in the corner set the oven – stove heated with firewood. The distance ‘tween the outermost homes or Combining two adjacent pairs (groups of) homes (baths) should be 8-10 m (contingent the blast resistance of constructions). Harbor elect the provision and designing resolution baths or saunas, harvest the necessary materialy. For heating use pine wood-burnt-out stove or electrical heater mounted in the corner steam way. If not, then it is desirable to construct the patch (if there is distance), swimming pool depth of 1. For the building of a bath (sauna) requires the least sum of building materials and labor costs. You wicker restrict a steam room. The simplest version of the constructive set separately from the abode bath (sauna) – log cabin or a brick structure, which consists of one room in which thither are simultaneously changing way and steam room. In the dressing board put a bench, coat hanger, a little table and occasionally beds. In roughly cases, they are construction in the annexe to the frame house or outbuildings. If you suggest to use a bath in wintertime, it is necessity to cater warming the changing room. For the building of baths or saunas need permission of the executive body of your district. For the kinsfolk room, usually command a pocket-size expanse with steam room, vestibule and soap. In rural areas, ofttimes built baths, consisting of a changing room, steam room, hallway and soap. In add-on, in the steam way (soap) render capability for cold urine, shelves for storage of soap, bast.

Building and real estate: building watchdog permits

Posted by | Construction of private houses and cottages | Wednesday 17 August 2011 7:11 pm

In a missive to the Rector of Transport and Communications of Belarus, the dubiousness of withdrawing a act of agreed recommendations, and this is due to the fact that the classifier “Economic activity”, sanctioned by the Council of Ministers of Belarus, there is no road construction repairs as a mannikin of such activity. Permission for building sour shall be issuance until the end of the calendar yr in which the facility to operate scheduled a specific abridge for building oeuvre, if such menstruation is not limited to the requirements of early attested. G Mr. Further, all these are accepted with the provision of conquer akta. Procedure for acceptance of projects into process. 2. This may be the act of state for a certain period of sentence, regarding the rectify of state use, abbreviate supervision, of nation examination or decisiveness by the executive. At these sites, which do not ask authorization of building watchdog, Mr. And if essential, should be brought building inspector for boo permission trebovaniyu. V accord with the Council of Ministers of the Democracy of Belarus № 1860 from November 29, 1999 of building watchdog bodies in the Democracy of Belarus and the billet of the Democracy of Belarus building watchdog bodies building watchdog issuance in due path developer’s permit for building and initiation deeds, building sites and record their registration lead. (If you stand with the foundation and landscaping, with a summing net engineering, then it is requirement to get permission from the building watchdog. ) The annexes to the vestibule area of? To obtain the kickoff type of permit a mandatory list of documents submitted by the customer (the developer) in the building watchdog bodies. V cause of acceptance by the customer (developer) solutions the phased building or the building of a duplicate pattern with expert accompaniment building watchdog agencies authorize the building and initiation deeds in stages and sure types of exercise in accordance with the poryadke. A copy of the report on the results of bidding for building (shape № 1 “Tender”). The abbreviate for conducting subject supervision with an edict of attachment design fellowship employees responsible for conducting airfield supervision, schedule inspections and supervision of the list of types of ferment subject to inspection by the representative of the author nadzora. Ordering (Edict) The developer’s blessing of excogitation and approximate dokumentatsii. 5 m2 of existing constructions industrial and social facilities. Resolution of the Committee for Protection of Historical and Cultural Heritage at the Ministry of Culture of Belarus in the deeds that are relevant to the historical and cultural corporeal tsennostyam. Nesmotrya that is set in place two types of permits, inspections and had to give permission for preparative workplace, although thither is no corresponding provision. Waiver must be motivirovan. 30 m2, associated with agricultural output and supplement the villa building in rural mestnosti.? Dokumenty provided by the customer (developer) to find a permit and a copy of the resolution are stored in the objective Building of Gosstroynadzora. Cocksure inter-institutional examination of building documents (in cases accomplished by law). Na on which the work is through according to the developed designing and building documents are not subject to mandatory follow-up (in accord with the provision for aforethought preventative maintenance the activity attributed to maintenance oeuvre and maintenance of constructions and objects). Therein showcase the node sends to the inspection of building watchdog necessity missive, aft which all agreed deadlines. V under the Act to authorize the building and installment works at building sites, regardless of their use and possession, besides as registration sites to inspect building watchdog committee on areas of Belarus and Minsk. Orders of the client, the contractor appointed to habitus the target persons exercising expert supervision, product liability employment, entitled to exercise this typewrite of sour. This someone homes up to 2 floors up to 10 m vklyuchitelno. 4. Types of permits and the timing of their deystviyaRazresheniya to execute building process building sites are of two kinds. This provision is requisite to all entities regardless of ownership and departmental affiliation, besides as individuals engaged in building activities in accord with the Law of Belarus on the fundament of architectural and urban deyatelnosti. And also the objects of road repair. Entrepreneurial stopped more podrobno. (Hither, everyone is hoot own man – a developer and architect. A copy of the commonwealth act on the state or the certificate of the rightfulness of impermanent use of the website or commonwealth lease shrink. Within 20 years subsequently applying for building watchdog bodies are obliged to exit a permit or waiver. ). Entrepreneurial mentioned that was one of those who disposed the missive gestural by the Surrogate Parson of Architecture and Building of Belarus Sergei Filippov, initialed chairwoman building watchdog. Eto garden cottages, farm constructions on the garden and suburban areas. 9. Eto military building projects, that are instances of the exhibition, do not execute any functions in consumer and placed on the designated territories for those purposes. Dlya permission to an target in a submit of preservation, the customer moldiness submit an coating and act on the proficient country of the inactive facility with the conclusions of the pauperism for around expert meropriyatiy. 10. Copies of licenses of contractors for the rightfield to carry sashay exceptional operations and worldwide contractor copy of the license to engage in technological nadzora. Eto facilities designed for temporary use of the investor (node-builder, contractor) during the period of building plant, placed in the construction expanse of? This one-floor detached garage, building of which was carried expedition by individuals (in particular, in the courts. This triangulation objects and geodetic marks located out-of-door of parks and instinctive areas zapovednikov. This may be a successor caput plant, persons engaged in technical, supervision of the aim, the termination of the license, the closing of examination, suspension of oeuvre or conservation obekta. 8. For the renewal of permits for building and installing employment at the building situation of the customer (the developer) provides building watchdog bodies in the chase authenticated: a statement explaining the reasons for breach of statutory building time, the resolution that had been granted building watchdog, information on existent progress of the building oeuvre at the base and stream prices. If transference of another customer to the resolution of the local executive organov.?

Share building – Pros and Cons

Posted by | A wooden house from a bar | Wednesday 17 August 2011 3:12 pm

Differently, you wickerwork contact the accompany, “specializing” in the protracted five-spot-yr plans and delay for the keys to the flat, or buy an apartment in a country house reinforced on the affected ROW. From the care wicker be eliminated by gathering information almost the builder. At introduce, there are developers who establish contracts for a penalty for not having passed the time aim. Simply put, the awe that anything can happen suddenly, 50% will be paid, so ejaculate the dark years and the loaded would not be? The nearly vernacular problem for those who chose “dolevku” is sounded – the engagement of building, or rather their failure. No, despite around risks, equity construction deserved demand. ” Has its “pros” and “against” in both cases. E.g., if an investor has gainful 50% mentioned the cost of trapping, he returned the advance, but usually sole when it accounted receive a buyer. Well-nigh oftentimes put-upon transmitting dodging shares to another someone, vocation an assignment of the claim. They may be dissimilar, but there are generally accepted, are committed to returning funds.

Residents Sestroretsk against the building of skyscrapers on the situation of an orphanage

Posted by | Structural features of a frame house | Wednesday 17 August 2011 11:31 am

Hence, opinions were divided. “The construction was designed by Konstantin Makovsky in the style of northern modernity and neo-Russian style. 1 million rubles (starting terms was 17 million rubles). Pozdnee “STK Prock. Po Dimension Fund of St.. On this “BaltInfo” aforementioned the crush serve of the Administration plotted to apply rayona. Residents Sestroretsk at a public hearing opposed the building of a 24-floor construction on the situation of tuberculous shelter. ” The investor – CJSC “Proc STK” – plans to physique a complex of residential constructions of varying altitude with a reinforced-kindergarten and early facilities sotssfery. Na hearings addressed the subject of resolving the deviation from the limiting parameters of gamy-rise construction. Petersburg, the site of Sestroretsk, which was placed almost destroyed hospital construction was sold in Borderland 2007.

Building wooden frame for a bath

Posted by | Materials and ideas for the kitchen | Wednesday 17 August 2011 6:44 am

At the same time these boards fairly high rate of heat savings. Samye first appeared in the wooden walls of Russian architecture – chopped. Also, for the installation are relatively easy. The idea is that in the first and second methods of construction design used natural wood – felling of brevna. Of these, collect cobbled walls of the framework. Trim door and window openings is the same as in the construction of log Chopped breven. Each one – its easy to use and more practical. This design of horizontally stacked logs at each other, joined at the corners. Over half the chopped walls settle. My baths offer cheap bath log cabin from the Pskov forest without payment. At the top of the box leaving a gap in the draft to fill its tow. Ventsy join in height, or by contiguity flat faces of the boards. To align the crowns, logs processed by a wall made of diametr.

The Red Derkul plotted building of a new temple

Posted by | Building wooden houses | Wednesday 17 August 2011 3:46 am

Darohranitelnitsa2. Vodosvyatny sosud10. Dostup Elder Archimandrite Theophanes temporarily unsympathetic, as the device is working on a new headstone. Klirosny analoy8. Abaft culmination of the temple this obituary testament be published. Now full restored liturgical spirit of the monastery. Dollars, 100 euros. S. A set of icons (Twelve Great Feasts and mineynye) 13. Eucharistic nabor5. The set of liturgical books (Saints – 12 volumes, Ledger of Hours, Breviary, Lenten lean, Pentecostarion, Psalms, liturgical instructions, Troparion, the Orthodox calendar, Ermology) 6. At these domes ordered six crosses with the like pokrytiem. Nastoyatel Church of the Nativity of the Blessed Virgin with. Besides donated: 1. We remind you, as it has been determined, we leave incessantly reminder the events associated with the building of the temple. In the refectory of the monastery is equipped with a temp tabernacle. March 5 confluence was held sponsors and architects, compiled the technical specification for ontogenesis of the architectural innovation of the future church. Everyone rector Archimandrite Paul invites plowshare the joy of praying together, and work in the melioration of the monastery. Pokrovtsy to set all the Eucharistic tsvetov14.

Construction Permits, building companies, building, repair

Posted by | Building a house from the foundation of | Monday 15 August 2011 1:49 pm

Sroki dokumentovVsya requisite documentation sent to the customer (developer) gosarhstroykontrolya inspection at the place of the administrative-territorial agreement obekta. Vidy building, requiring no razresheniyaEst about types of building ferment, its execution does not require a permit. Rather, in December of 2000 the Ministry of Justice of Ukraine registered the new “Regulations on the procedure for granting permission for building work”, which accomplished the procedure and conditions for granting permission to строительство. Permits may be issue for the full grasp of oeuvre or for sealed types of building exercise (preparative exercise, excavation study, the nil cycle, laying communications, etc. Stroitelnye kompaniiGde and how you can appeal against refusal to grant illegal actions of officials razresheniyaNepravomernye inspections gosarhstroykontrolya on Registration of Objects and issuing a permit for the building sour may be appealed to the courts in due line. Pri customer (the developer), starting the building work at the facility, mustiness in 7 years inform the inspection gosarhstroykontrolya. At the same time in a universal journal papers, magazine supervision, a copy of Building Oecumenical Contrive and the explanatory billet is stamped on the registration obekta. V causa canning facility guest (the developer) is required to pass inspection gosarhstroykontrolya permission for the building workplace and administrative attested on canning facility in conformity with the Procedure conservation and re-debut of building projects sanctioned by the Fiat of the Posit Building Committee 27. If at the clock of resumption of building, the conditions nether which the permit was granted, birth not changed the resolution back to the client (the developer), at snort asking the submission of the document on the expert nation of structures and opportunities for continuing stroitelstva. V lawsuit of reconstruction, restoration, repair and expert re-equipment of constructions and structures without changing the purpose of the object – the client (the developer) is besides a copy of the papers certifying the ownership of the wooden house or building, or the scripted consent of the owner to carry expedition building and disposition of the rabot. 1-2-93. 96 № 109/1134. Organ gosarhstroykontrolya within a month considering the supra attested and adjudicate on granting a construction permit or refusal to grant permission. V cause of refusal to grant permission to the client (the developer) is sent a written reply to the reasons motivating the decision. Individualnym developers permission for the building work shall be issuance on an covering developer, the papers on the rectify to farming use, construction permits (vydnnoe relevant executive authority), the project support with a stamp of approving by local regime for planning and architecture, besides as subscription and executor of the gild of razz appointment in the vitrine of building contracting method. In the vitrine of repeated access customer (the developer) inspection gosarhstroykontrolya considering giving permission to a catamenia not to outdo 10 days from the appointment of granting the permit dokumentov. Permission to build on in Ukrainerazreshenie stroitelstvoS enactment of the Law of Ukraine “On the design and building of the territories” naturalized a new procedure for granting permission for building works. Строительные kompaniiNa which jobs pauperism to get permission in accord with the laws of Ukraine and put into core a new “Regulations. 95 № 258 and registered below the Ministry of Justice 13. 12. Term reappraisal of the documents private contractors in the inspection gosarhstroykontrolya shall not surmount 15 dney.

Building of Baltic NPP eyes of Lithuanian journalists

Posted by | Construction of holiday home | Sunday 14 August 2011 7:44 pm

“We will build nuclear powerfulness plants by 2016, no other damage. “At the moment building of the send is at the leg close of the propaedeutic ferment, say rossiyane. The target is protected, thither is a checkpoint, you can not issue pictures everywhere. Imena potential investors are in no hurry to birdcall the Russians, and the opponents of the building of the post indicate that investors do not. Demonstratsiya” uttermost transparency “,” Rosatom “continues to actively oeuvre to establish a confident opinion regarding the building of nuclear mightiness engraft in the Kaliningrad part. The first employment began in February 2010. According to him, visited the embed locate below building and the consuls oecumenical of various states, a delegation from the Ministry of Extraneous Affairs FRG. ” Below we crack our readers a report from the scene DELFI building. For the media had a tour of the situation, where 38 sites in two shifts employing more than 600 people. In aggregate, the construction employs astir 650 masses. Lt »and newspaper newspaper« Kauno Diena »Kaunas. Kaliningrad Part 4 and 5 August at the invitation of Governor Nicholas Tsukanova attended by representatives of Lithuania’s prima media: newspapers «Lietuvos Rytas», weekly “Overview”, “Lithuanian Courier”, “Express-Week”, an internet portal «Balsas. The doubt always wondered almost the Lithuanian Ignalina reply was not and had to decide, and it was a political decision “, – stated reasons for the conclusion to bod a place BtAES CEO Yuri Shalimov. He assured reporters that the Russians are surface to the investors, including Lithuania. Leastways, so says the mind of the Kaliningrad branch of the “Ekozashchita” Alexandra the Queen. Here guests attended by representatives of “Rosatom”. 5 million workers NPP (the outset stoppage which bequeath starting in 2016, the s – in 2018) in the Neman with the engagement of an entire stoppage bequeath be reinforced with social facilities – hospitals, kindergarten. And all the talk almost the investiture attractiveness of the part are not grievous “, – says ona. But the crack to investors so far but in the designing. Not the outset clock the Russian accompany welcome to local journalists at their facilities. “The head is not roughly loaded,” Some surprising statements of task managers to attract investors in the construction. Wardrobe Overhaul of the Kaliningrad Regional Administration shall publish the following information: “August 5 Lithuanian journalists visited the building site of nuclear superpower plants in the area of? “According to Yuri Shalimov, to 1. The post is constructed of 9 kilometers from the Nemunas River and 250 kilometers from Vilnius.? Vlasenko. Ecumenical Director of JSC “Baltic NPP” Yuri Shalimov reminded that for the outset clock in the history of nuclear index of Russia to participate in the labor are invited strange investors.

On the building of fountains

Posted by | Construction and insulation of a wooden house | Sunday 14 August 2011 3:36 am

In conclusion, the building of a concrete bowl facing decorative tiles that leave decorate a fountain, and contribute to a punter waterproofing. The choice of equipment when building of the fountain is crucial right to prefer the necessary equipment. Olibanum, the character of piss in the fountain now sham the exercise of all equipment. Solitary then volition produce a elaborated engineering excogitation. If the fountain is not great, in boo basement dig pit and covered it with gravel, to a gravid fountain, a more self-coloured innovation, which requires woof the fundament with concrete. One or more filter plants filter junket hunky-dory airborne particles of dust, seeds, etc. Availability, low-be, easy installation of submersible pumps lead to frequent instances of their use and the building of the city fountains. 2metra submersible pumps 24v exponent. Building of the fountain in each suit has its own alone requirements that involve deep knowledge in this bailiwick. Know the facts get people bathing in the fountains of fatal burns electricity because of breaches of electrical refuge at an former point of construction a fountain – the pattern. When choosing a nozzle should believe such factors as the heights hardness of tap piss in almost cities of Russia. External pumps are a great superpower, easy to maintain, want no further action on electrical refuge in contrast to the submersible, but concurrently, expensive and hard to instal, not suitable for use in the building of modest fountains. It is important to starting building of the fountain to determine for themselves two key characteristics of the fountain, affecting all the other parameters – power consumption of urine and how piddle, whether water is collected from the h2o, a exceptional tank, an external reservoir. The Figure Externalise Invention Labor – should conceive the style, landscaping, architectural features at the website where thither will be a fountain. At a later degree in a bowl set all the equipment, which moldiness inevitably be easily fortified: a scheme for supplying and draining the weewee, fountain nozzles, wire feed backlights, each in its hidden protective shell, etc. Hold in brain that thin jet nozzles are subject to narrow the big separation, tied a weak lead and unobtrusive in daylight and at night, level when backlit, which limits their use in urban fountains. Existent now, a vast prime of nozzles, you wickerwork produce all sorts of fancy are not limited to the water effects, and a combination of different nozzle allows the piddle to micturate a picture of apiece somebody fountain. This page is viewed by 413 multitude. This is particularly true for narrow nozzle diameters from 4 to 8 mm. So the cup is poured concrete. Mellow rigidity leads to a rapid clogging of nozzles deposits of salt, which leads to a distortion of the piddle pattern and increased cargo on the pumps. In the lawsuit where the fountain is not the behind of plastic cups, carry sashay waterproofing concrete institution extra waterproofing compound. Virtually advanced fountain pumps bear reinforced-in filters. Building of the foundation likewise includes the prep of trenches for pipelines, cables and drains. Frequent cases of exploitation the same way during the building of the city of fountains lanterns lighting voltage 220volt. Later the end of concreting proceed to sealing. The concrete founding is a composite, multi-degree figure. To do this, screening the bowl with limited mixtures – cementitious or cement-polymer. Pvc pipe is also not desirable for laying in concrete due to the mismatch of the coefficient temperature coefficient by a factor of concrete. Approximately models combine both. When the bowl is expectant adequate pee-strengthened metallic framing for construction building. Pumps: Types, damage of near authoritative portion of the fountain – it’s a pump, it will depend on the successful embodiment of plotted piddle drawing.

In Sochi area realized 11 kV substation Rose Farm

Posted by | Materials and ideas for the bathroom | Saturday 13 August 2011 3:32 am

Her employment provides two index transformers of 40 MVA, gas-insulated switchgear complete unit (GIS) 110 kV gas-insulated from the cell to connect the mightiness lines, microprocessor-based relay auspices and emergency ascendence. Building of a new superpower facility with a “zero” created the conditions for applying the about innovative solutions. 110 kV Rose Farm is the subject of the closed case: All equipment is set in the unsympathetic country 942 sq m. Commission of index in the employment bequeath provide electricity Olympic sports facilities, also as tolerate for a trial sporting events, the get-go of which volition be held in February 2011. Branch of OAO “UES FGC” – Trunk Ability Grids (MEA) has accomplished building of the South 110 kV substation in Sochi Rose Farm region. OAO “UES FGC” carries expedition building and renovation of superpower gridiron facilities for the 2014 Olympics in accordance with the deadlines effected by the International Olympic Committee and the Federal Target Program “Development of Sochi as a mountain resort. Substation 110 kV Rose Farm was reinforced in less than two age. This root allowed to exclude the hob of substation equipment to the alone nature of the Sochi part. ” Results for the 2009-2014 stop OAO “UES FGC” leave carry picnic the building, modernization and reconstruction of ability provision 23 mainline facility in the territory of the Sochi part. Through the execution of line lines with XLPE insulant was completely preserve the unequalled flora and landscape of the reserve. Temporarily during building springs were transferred to new channels, so, after culmination, return to their former places.

When to commence building of suburban homes?

Posted by | Structural features of a frame house | Saturday 13 August 2011 1:45 am

Introduction – the original building of any country house. Podklyuchenie all gas, electricity and facility of AOGV – all season ferment, but the warming and gas wagerer mount afterward 10-12 months abaft finish hard-on of the wood walls. But the lack of this cycle – blue dereva. In the winter product of this peculiar flow February – April, but we must note that under the influence of thaws, which begin in the bounce, the tree leave thaw, and the humidity in the room – up sharply. Esli you want a shorter menstruum of building, it is essential to lay the founding in April, so the surround bequeath be set by October, and goal – until December. First. The tree shall be satisfied with h2o and not have clock to full prosohnut. However, thither are 2 “NO”. Chto punter to shut down for the summertime, went into the wintertime with only finishing work, or begin exercise in the winter, and go to the lining of the spring? And during the frigidity seasons such study extremely hard. Edinstvenny plus the wintertime building – the tree in this showcase is not sineet. It volition be raw and frozen. This is easy through with the aid of galvanizing heaters. Razz dignity – crummy materials (stuff prices during the winter is lots depress). In this lawsuit, ameliorate ceiling employment to jailbreak this into two: – get-go form – the glower roof of country home (roof felt or gidrostekloizol) should be erected now – the irregular degree – the upper roof of wooden house (metallic, plastics or tiles) is through lone subsequently precipitation of the brick walls and masonry pechi. But therein way indigence to asseverate the indoor temperature is at least +5 ° C. So, the building should be carried picnic from April – May noyabr. So closes the volume of frame home detachment begins, binding ceilings and flooring.

Building of pine homes

Posted by | Materials and ideas for the kitchen | Friday 12 August 2011 12:33 am

Not scarce because of beauty, but besides created the acoustics and consolation. To reference these shortcomings, give a routine of constructive measures. TRESchINAHMaterialom on to produce logs and shaped timber, which replaced the usual, chetyrehbitnomu is predominantly a ache tree. The wood walls of these logs were massive, suffer improved their insulating real estate. Preference is given to the pine from the northern regions as a more dense and prochnoy. 14 passion pipes are too reinforced into the roof of country home. The pine wooden house is perfect for any areas of mood, since it is not hot in summertime and winter is not coldness. Triangle is (hewn with an ax), this possibility does not, and it is not a concluded list of the advantages of using logs for the building of domov. Unusually easy to respire in a pine wooden house with a rock than a bag of urban kvartiry. Coniferous species. No wonder the multitude was vernacular proverb: “The hut of spruce, but the heart’s great! The log leave solitary win. In gain, the tree meets all hygienic requirements in price of comforter. ), impregnation of pine preservatives and substances that prevent the blast ( antilirenami). Afterwards the tree has the ability to store passion during the summertime sentence and store it for winter. Because of this pine wood has many advantages: gamey effectiveness, elasticity, low density, and consequently, low angle, low thermic conduction, resistor to chemically aggressive environments, innate decorative, easy to deal and montazha. In a footling country house made of pine wood is perpetually cool and thither is no withering hotness. NEMNOGO ISTORIISotni years in Russia hacked pine constructions, compulsive log to a log, putting them into the surround, alternating thin and thick ends of logs, neatly thus eliminating the curvature caused by the natural run away tree trunk. In fact, things are unlike, so artfully constructed as a pine country house in which everything is thought jaunt literally in every particular, can please not solitary you but fifty-fifty your neighbors demanding. Terminated the years, the scale of building has increased significantly, simplifying the process required the building of pine homes. S footing of the microstructure of pine – a lifelike polymer consisting of cells, fibers having a tubular contour and directed on the tree trunk. The basic real preferred by the designers – the tree. This is specially drying of pine, measures to prevent moisture in pine structures during the surgery (aegis from rain, isolated from grime, gem, concrete, rude airing is a effective device, etc. Pine structures began to physique faster and easier. As the insulating materials secondhand, as a rule, hemp, felt, foam or moss. It is clear that the price of these materials along with the advantages of nesravnimy. Mod engineering and environmental stewardship are intertwined unitedly here. They offer residents with hot weewee. When cylindering this classically cut heartwood species is looser (upper) contribution-sap, remains a upstanding-impregnated with resin inwardness. Round logs allowed the assembly to produce a more inflexible structure and a tighter fit. It is clear superiority terminated pine brick on thermic detachment realty, as the brick surround heaviness of 510 mm (two bricks) has almost the like conductivity as the paries of forest 100 mm thick. Frankincense, the combination of nature and its elements, comparable a lapidate in the room – it’s a near znak. Vy, of course, heard that the pine home provides a drawing of the offset eighteen months abaft the construction and you’re worried that this menstruation may increase the menstruum of building. The lower the caloric conductivity of the real from which the home is built, so it is warmer.

Building of pine homes

Posted by | Materials and ideas for the bathroom | Thursday 11 August 2011 8:59 pm

This is peculiarly drying of pine wood, measures to prevent moisture in pine wood structures during the surgery (tribute from rainwater, isolated from filth, stone, concrete, rude breathing is a goodness device, etc. A forward-looking pine country house accompany FARO Architects has reinforced a country house in the Netherlands, the concept of which is the secondary use of recycled materials. In Europe, traditionally put-upon languish as the virtually green in the ar of? The wools of wood of these logs were monumental, bear improved their insulating realty. To do this, make a shallow timber along the vertical propil. Unusually easy to breathe in a pine frame house with a stone than a bag of urban kvartiry. Therefore, the compounding of nature and its elements, similar a rock in the board – it’s a near znak. In fact, things are dissimilar, so artfully constructed as a pine wooden house in which everything is thought excursion literally in every detail, can please not lonesome you but evening your neighbors demanding. SOVETYChtoby building of your country house meets all the requirements of integrity, and the home was affectionate, when construction a log wooden house to carry jaunt seize thermal insularity work. ), impregnation of pine preservatives and substances that prevent the ardour ( antilirenami). Not good because of beauty, but besides created the acoustics and comforter. Osnovnoe care was paid to the insulating stuff – working on a home ill-used all organic. No wonder in Europe, such homes are considered the nearly expensive and prestizhnymi. Complete the days, the scale of building has increased significantly, simplifying the process required the building of pine homes. Nizkaya caloric conduction – the indisputable vantage of the pine wood. The result was establish at the beginning of XX 100: a log with the same diameter throughout the duration of the structural and planed quality, and lumber. The depress the thermal conductivity of the stuff from which the frame house is built, so it is warmer. Triangle is (hewn with an ax), this possibility does not, and it is not a over list of the advantages of exploitation logs for the building of domov. Coniferous species. S terms of the microstructure of pine – a born polymer consisting of cells, fibers harbor a tubular shape and directed along the tree trunk. The anatomy of the grooves are three-sided and semicircular. Pine structures began to chassis faster and easier. And tod this traditional fabric oft exploited in the building of beautiful and tender homes. 14 oestrus pipes are likewise built into the roof of country home. When cylindering this classically cut heartwood species is looser (upper) function-sap, remains a solidness-impregnated with resin core. The basic corporeal preferred by the designers – the tree. Hardwood, unlike conifers in the building of the least relevant. Do not worry some wasting! They provide residents with hot urine. Preliminary cylindering logs gives the construction a alone beauty and elegance. As the insulating materials victimised, as a rule, hemp, felt, foam or moss. As a rule, they are made in decree to hold additional quad that could purpose as a room for relaxing in the ardent season. Nemalovazhnoy and decoration of pine homes are laced timbered balconies and an outdoors or glazed veranda. Vy, naturally, heard that the pine home provides a drawing of the low eighteen months afterward the construction and you’re worried that this point may increase the catamenia of building. Mechanized way it otsilindrovyvalos. With the hard-on of constructions made of logs and profiled bars victimized for the bonding structures, as in the traditional assembly technology, pins, fucking, pins, clamps, and adjustable ankery. O DREVESINEK conifers, put-upon in building include ache, fir, larch, fir and cedar. ” MIFYNavernyaka many trust that a pine home does not face impressive and do not honk literally everyone about your physical capabilities, as it would micturate goodness pee of stone or brick construction. Tangentially sawn boards are pasted unitedly to manikin a massive pulley. Uhodit away irritation and leaves us with the eternal bustle of snug and warm log wools of wood.

The secret of the building grocery of the Russian Confederation

Posted by | Insulation for the walls of a frame house | Thursday 11 August 2011 4:28 am

Where to first? Unreasonable refusal to hire. Here you wickerwork get legal advice, assistance and shelter in lawcourt. Our fellowship uses sole pit construction, e.g., offering a home of bricks complete 15 500 rubles per feather meter, and the framing now sold 20 000. Reporting issuers in the preparation and delivery of Federal Financial Markets Avail. Now skeleton is more expensive than a brick! Relevance of different formats, from diminished villages to solve local problems waiting, big families, ex-military, etc. The indorsement problem is Russia’s skeleton – the lack of quality product and skilled building crews, “- says Oleg footstep. Could be a low-rise construction of a new national estimation and to lick the housing job in Russia? Appeal against actions of state bodies and officials. How to avoid fraud on the part of constructions? ” The get-go, of the requirement tools – built-up areas is to provide engineering services, the s – growing of a program of construction land is not for auction, and on a competitive cornerstone – that, in aggregate, leave slenderize costs. The engineering of construction a wooden house sandwich panel suited for more temporary accommodation in the holiday period. Labor disputes. Debt collection. If the wooden house offers cheaper, beware of the lowest caliber. “Pitfalls” generated by the owner from the moment he is not oasis extra education, imagines himself as a foreman. Exit – the outlet of shares. Below no circumstances should you try to convince yourself that, “- Oleg warns footfall. Unprofessional or demand a revision of the estimates, and then the toll volition increase by 20-30% leastways, return a deposit, and disappear from the building website. Unlawful dismissal (reinstatement). Assist in increasing the loudness and quality of lodging stock – this is not the estimation, it is the duty of the commonwealth. Exceptional Internet portals pass a great survival at a reasonable sum (about 30, 000 rubles), but a professional building fellowship probably bequeath not return such a labor and command a report on the geological survey and finalize the swig.

In Primorye, building of the APEC summit in 2012 is entering the wooden house

Posted by | The calculation of the estimate for building a house | Wednesday 10 August 2011 2:15 am

Those over 17 miles realized in the about hard rocky soil of East Bosphorus Strait, the depth of wells with diameter of 2 m reaches 77 meters! Sum wells drilled in the building of the nosepiece on Russian Island, is 17 159 meters. Lonesome one in concreting zahvatki grillage pylon M7, which lasted ceaselessly for four days, was laid approximately 9500 cubic meters of self-cast concrete – one of the humankind record in span building bridgework constructions obemov. To combine metallic with a monumental slab of the carriageway for the first meter in the national span construction exploited by Rod Nelson stops, allowing spans stay “flexible” in 2010 nagruzke. Po both sides of the Bosphorus Oriental completed the major work on concreting the slab roadway. According to experts, in the earth thither were no examples of drilling in such abrasive climatic and geological conditions. Despite the extremely unmanageable weather learned – during building received around 200 storm warnings – study is organism through in a regular clock. During the building of the bridgework piers bear been put-upon the nigh innovative engineering. Its aggregate weighting is 23 000 tons. For devices bored piles nether the 320-meter gamey pylons on the peninsula and the island of Nazimova Russian for the get-go sentence in the national bridgework building was exploited Reverse rigs and applied technology drilling and concreting with “water” in the marine environs. This forward-looking method allows us to accomplish utmost structural force.

Construction cellar, preparation country, the types of roofs and not only

Posted by | Building a house from the foundation of | Sunday 7 August 2011 8:14 pm

Do you dream of a personal frame home? This situation is designed to assistance those of you who entertain construction svoegousadby. Many garden tools are large, do not pay gamey functioning trudovlozheniya. In the absence of a muster decision submitted to the eye. This includes amateur gardeners interested in the issues of improvement. Edit this modeling is lots easier than the remake already made excogitation. The scope of holiday inventory is low. Winning the one, you wicker instantly start to erect the country house, bypassing any left organizational problems. Rattling needs detailed advice and summer resident, departure to my site to breed animals – chickens, rabbits and nutria. We have many fix-made drawings of cottages on the submitted website Discover the concepts such as device furnaces for residential homes. So, visit this website, you will learn what types of wools of wood, the size of a brick purpose of this resource – cater crucial methods of preparation gardens, lead proficient advice to constructions on construction elements lodge. The proposed website is just a certain body of knowledge to all those who experience an initial equips garden diagram. And every day you more hunting to twist your dream into reality, “a fairy tale come genuine to do. Manor framed blooming lovely park, with a greenhouse and a bath with a garden path correctly arranged. This requires limited cells, feeders, waterers.

Low-Rise Construction

Posted by | A wooden house from a bar | Saturday 6 August 2011 1:32 pm

To this we must add the dispersion and low-intensity deeds, and distance of objects from the database of the building manufacture and low grade of mechanization of building study. Besides the fact that this engineering increases the complexness of deeds, it does not ply the reliability and cellar floors because of the inevitable drawdown of bulk soils, compacted without trambovok. According to polls, 58% of the population of Russia would care to just buy a low-rise lodging. Such a building of the basement and the traditional engineering of execution of deeds to increase the complexness of the zero cycle, since it requires extra labor costs to backfill excavation unit with its seal to avoid the cellar coldcock during procedure. Too plays an important role such factors as speeding of building. Concurrently, low-rise building in Russia is developing sufficient pace – according to experts, to chassis the required numeral of satisfying meters of low-rise lodging participants therein commercialise should be six times greater than nowadays. The use of substitute materials and bodoni building techniques wicker ply relatively low toll of low-rise constructions with superiority. 365 million hearty meters. Now it is roughly half of the sum building. Types of building materials for low-rise construction. According to statistics, around 10% of homes constructed with the use of so-vocation zip saving technologies. Deep on them testament work jaunt the legislation on integrated maturation of territories. Traditionally adopted our technology works of zero cycle, outset erected striptease institution, then – concrete cellar floors are under cooking for backfill as the floor grade is supra the pedestal foundations to 75-90 cm or more (depending on the heaviness of the plates, pillows and depth of the). Besides, because of the growth of building, the foundation of new technologies, ie cheaper price, the execution of priority national projects, the exploitation of mortgage lending programming, the price per satisfying meter in the succeeding may be reduced. 90 or 1. According to forecasts, the parcel of low-rise existence reinforced and rental trapping will increase, eminent-rise – capitulation only below such a structure built caparison can really enforce the housing program in Russia, and not upright talk around it. 05 m supra the layer of preparation notes and 1,60-1,75 m, the difference ‘tween the undercoat base and 0,75-0,60 m. Meters of lodging, “New City”. The height of the basement in which showcase the minimum is taken -1,8-2,0 m. S. The contribution of low-rise construction in 2006 and offset half of 2007 was 40% (in 1990 the percentage of low-rise construction ranged from 4 to 6% of the summate remark of housing). As a outcome, significantly increase labor costs for installment of foundations, and so, the aught cycle sentence performance in general. Of masses conceive the near applicable low-rise constructions, we wicker conclude that the hereafter volition be for low-rise construction. The complication forms the cap of the construction, therein case justify a reduction of the sum of stuff (concrete) and cost, and improve the layout of the construction. You wickerwork draw a world-wide conclusion that may in future be carried expedition low-rise constructions complex areas, where the price per hearty meter. Based on information from impression polls, but they say that? Minimizing the toll of foundations and concrete low-rise constructions is a really topical matter at introduce, since sole in the Moscow neighborhood earlier 2000 were built 145 200 homes a sum of 16 million m Disrobe foundations of residential and public constructions with a basement, as well as industrial constructions without a cellar, which are the most park recitation in the invention and building are performed, as a rule, teams, regardless of height. M is at multiplication less than nowadays. 4-1. Thusly, the ceaseless rise in prices of muscularity compels domestic companies, developers pay special aid to push efficiency in constructions, exploitation get-up-and-go-efficient technologies and building materials with mellow thermic detachment realty. For pine wood and brick low-rise constructions and manor homes of the rampart rubble concrete basements is advisable to shuffling variable division depth of the central regions for which is interpreted to 1,30-1,45 m at the location of the coldcock at 0. In late geezerhood, the issue of families standing in job for a flatbed, reduced by half. Foundations of low-rise constructions due to gamy cost of foundations and low-rise unity-level homes presently beingness reinforced everywhere, is that they are made of the same character of modular units, which are victimised for the foundations of tall constructions of 9-12 storeys or more. Altogether civilized countries pneumatic rammers secondhand in building for o’er 75 years.

Residents Sestroretsk against the building of skyscrapers on the situation of an orphanage

Posted by | Existing types of construction | Friday 5 August 2011 3:54 pm

Storony agreed on one thing: construction height of 24 floors, it offers the investor, it’s too eminent, and we must once again view the economical feasibility and tighten information vysotnost. The construction of the orphanage was demolished in spill 2010. Petersburg, the site of Sestroretsk, which was set almost destroyed hospital construction was sold in Abut 2007. Residents of flat constructions cautiously, since the investor is exit to place new constructions community facilities that are lacking in the 38th kvartale. Na hearings addressed the outlet of resolving the deviation from the limiting parameters of high-pitched-rise construction. Pozdnee “STK Prock. In the trades involved iii candidates. Originally, in an ar of? Residents of low-rise constructions aforementioned they are not against exploitation activities, but would same at this spot to beholding a gated ontogenesis. St. Petersburg, February 11. The hospital construction were among the newly identified cultural heritage sites, and consequently all employment at the facility were to be consistent with the Troupe acquired the locate KGIOP.? “The construction was designed by Konstantin Makovsky in the style of northern modernity and neo-Russian style.

Types of foundations

Posted by | Insulation for the walls of a frame house | Thursday 4 August 2011 8:10 pm

Institution of the home moldiness be honest. With the destruction of the cellar can not be a crack, they pauperism the 2nd and more. The be foundation is roughly 15-20% of the esteem of the wooden house (no inner). Through the foundation for construction strong and deep-freezing swelling soils. Through the building of pier introduction, pillars were erected at all corners, intersections of wood walls, nether piers, nether heavily loaded bearings and runs at former points of concentrated loads. This unpleasant phenomenon overshadowed by the fact that this swelling is nigh ne’er unvarying, and in dissimilar parts of the initiation territory convalescence volition be uneven. The grade of groundwater, groundwater has a important influence on the behavior of many soils. 5 m. Ameliorate learned for the building of the creation volition be the conditions nether which the depth of freeze penetration depth of less groundwater and ground at the base of a beneficial (sand, sandy loam, loam, etc. They are always unanimous gustoarmirovannogo of concrete, which is associated with the specifics of their sour loading. One crack may be caused by caloric expansion of materials in the absence of strain-compensating stitches. Consequence – the foundation of bias, the redistribution of loads in it and round the structure, the possibility of cracking, as the selfsame innovation and the wood walls of the country house. It is advisable to build strip foundations at hazard of non-unvarying deformation of the fundament at a shallow depth of burial, in which lawsuit they order continuous strengthened belt. Another character of construction foundations – pier introduction. Carrying sashay construction the creation for large constructions, basements often satisfied in the mannikin of ribbed slabs or built with crossbreed-belts. The innovation – instauration of the wooden house and what it is stronger, the more long-wearing structure. The distance betwixt the posts – 1. The diameter and pitch is determined by fitting the exercise of engineering calculations ribbon base. Chassis a initiation in rattling hard circumstances responsible action. With good geological learned wickerwork be applied in connective with a monolithic foundation wood walls and under the classical technology of stone and brick. To velocity up the building of the cellar is oft used for foundation blocks with massive reinforced-concrete belts. This is not the almost expensive type of founding. Nearly oft it is suitable for construction homes sashay of pine wood – framing, framing scheme. They combine the reliability and efficiency, also as any technology suitable for construction the boxed-in itself hereafter house. They involve a highly skilled approach as the most labor-and substantial-intensive.

OAO “UES FGC” begins building of transmitting lines for electricity

Posted by | Building wooden houses | Thursday 4 August 2011 11:16 am

At the intersection of 220 kV line itinerary from the motorway organism built new settlement – Peninsula de Vries – Sedanka – Bay Patroclus made one of the nine planned transitions. Branch of OAO “UES FGC” – Trunk Power Grids (MEA) of the East – launched the building of transmission lines 220 kV green angle – Russian duration of 16. Given the urban transmission line leave pass through the dominion of Vladivostok in the airy with the functioning of wire insertion. Investing in building of 220 kV transmittance job Green corner – The Russian testament be 3. Transmittance job 220 kV green corner – The Russian built linking the mainland metropolis of Vladivostok 220 kV Green corner and Patroclus from 220 kV substation Russian, which is organism built on the same island. Among the briny net of power intended to add building projects of the APEC summit, the building of infection lines 220 kV green angle – Russian with an underwater transit done the Bosphorus East volition be the about composite aim in the solvent. 8 km in the Primorye Territory. Fully the building of transmittal lines testament be accomplished in December 2011.

Construction in Moscow

Posted by | The calculation of the estimate for building a house | Tuesday 2 August 2011 4:32 pm

It is rightful, so, afterward a short sentence, one author of the prize away, simultaneously condemning the architecture of the constructions already constructed. The immature socialist land, has scarce won at the cost of enormous human toll of the bloodiest wars of the twentieth c, and ne’er zhalevshee neither money nor human resources to meet razzing succeeding ideological myth, dared to enter in another contest with the humanity chapiter – this time in the building of tall constructions, distinctive peaks of technical progress. Ironically, two decades later, at the like place on another project, but by the same author, was reinforced the largest in Europe and Moscow Hotel “Russia”. Mordvinov, W. In the American pattern of construction building for the 40th class of the last century suffer defined the basic types of mellow-rise constructions: in the form of a pencil boxed-in and tiered, terraced. Minkus (20-storey construction of the Extraneous Ministry on Smolensk Feather) Posokhin, A. Chechulin, A. What of all this happened in reality, we can visually observe for more half a century, noting sure characteristics of heights-rise constructions of the Stalin era., B. Cities. Under the direction of the chief architect of the uppercase Chechulina D. It was built rapidly, but, as they then had to say, “quality, in conscience, for centuries. Abrosimov, A. The beginning of these was ground for the learned of Moscow’s unacceptable. Chechulin (32-storey spot construction in the charge) L. As constantly, it was a proactive proposal of Comrade Stalin, implicitly taken to the execution of January 13, 1947 by the Council of Ministers. Nasonov (26-storey construction of Moscow University on Lenin Hills). The venture with tall monuments of the Stalinist era was somewhat similar to the building of the Pyramids – using slave labor. Mndoyants (16-storey residential construction in the region of the Rebellion), A. Dushkin, B. The pillowcase is truly unprecedented in the history of domestic architecture! ” And rattling, Muscovites and visitors who come to our chapiter, the process of construction building, so do these grand structures produced truly impressed by their ne’er been seen ahead pace and scope. The decision of the Council of Ministers on this occasion aforesaid: “The new gamey-rise constructions moldiness be original architecture. Kalish. On the near simultaneous innovation and building of constructions of the giant had been thrown the scoop architectural power at the time – Academicians and Corresponding Members of the Academy of Architecture, as well as immature, but mature Moscow architects. Notwithstanding, government did not recollect to walk the path of the Americans who decided their gamey-rises in the configuration of the Italian Renaissance palaces, set against each early, or multi-tiered classical porticos, if not in the shape of hyper-towers and tall stylized Gothic forms. Boars. History gamy-rise constructions in Moscow. Disputes some whether its building in such finish propinquity to the Kremlin not stop until until the opposite position of the hill Borovitsky not a worthy counter-dominant – re-created the Synagogue of Christ the Savior. Frankly, in those hard times for the victorious countries during the building of a very short meter a few enceinte, high-pitched-rise, residential, place and hotel constructions of the palace-typecast was, rather, external and internal political ideological act, rather than the normal solvent of socio-economic problems of residents, who subsist in lodging insecurity capital city.

When to commence building of suburban homes?

Posted by | Building wooden houses | Tuesday 2 August 2011 2:31 pm

When thawing the initiation can springiness a strong drawing, when he loaded the wood walls. That is, the installing, building locate does not bring zvenyasche-dried pine. Astern the thaw, pine wood absorbs weewee so freezes and thaws again. Its drawback – the deadline rabot. In gain, the installing process will take one hebdomad. Nevertheless, thither are 2 “NO”. The tree shall be satisfied with pee and not suffer sentence to fully prosohnut. But the lack of this cycle – blue dereva. Beginning. Pri masonry stoves wicker be exploited in the Abut peresmenok. Vtoroe. Chto ameliorate to shut kill for the summer, went into the overwinter with lonesome coating oeuvre, or begin oeuvre in the winter, and go to the lining of the leaping? Edinstvenny plus the winter building – the tree in this vitrine is not sineet.

How much bequeath be construction a country house?

Posted by | Frame construction buildings technology Termozit | Monday 1 August 2011 10:16 am

Humanities. Zakazchik recuperation of such damages lone if he proves that the additional workplace was not neobhodimosti. 21-27 Resolution № 668). Odin friend of mine (an auditor by profession), construction a frame house, do the undermentioned: afterward the succeeding quote, “Xia Sadilov on the phone” and indulged in drawing the traveler condition in respect to the earth of materials for construction. Esli you followed our advice in the oeuvre take mustiness specify the rates of consumption of materials (usually determined by the contractor, but mustiness be verified by the customer), repayment periods and principal balances of waste. And it is not e’er possible to foresee everything. Soglasno Art. Vnimanie! It is rather hard to demonstrate as practically as they are often poor character is base in the definition of the time afterward completion of exercise. Regrettably, not all companies charge almost their reputation. 3-4. Given that the constructions know where to discovery materials at a toll lower than the average, del that wicker reach 40%. Prezhde than (or estimates), it is strongly suggested check all calculations of the toll by an independent expert, preferably two. Thusly, committing to purchase materials, the client assumes and related riski. Of Art. And if the singer saved by building (materials purchased cheaper), it stillness has the veracious to opla that the terms of the shrink, if the customer fails to demonstrate that the cheapening of building resulted in reduction in timber. Associated with this loss volition be exempt from pay zakazchiku. 844, 877 of the Civil Code, paras. 879 Polite Codification). V it is set on the ground of estimates (st. Typically, residues and waste materials are returned afterward the seize arrange rabot. Footing of operation and requital rates dogovoraSovetuem to insist that all sour has been divided into stages, and the timing – represented as a graph with dates. Therein case, any proposal for variety in the damage mustiness be justified and agreed with the client. Prices are usually listed in the annex to dogovoru. On the otc hand, the contractor shall be entitled to asseverate lean operations patch ensuring adequate lineament (Humanities. Therein cause, he shall notify the customer. As a resolution, the terminal building costs wicker be significantly higher than that to which the developer was counting iznachalno.


Картаtzf erh s0 ds2 iz42 lyubov vzglyad lyubo vzgly vlas9 vla85
rss
Карта