Construction a swell

Posted by | Flooring | Sunday 30 January 2011 3:44 am

Then, well-nigh potential you sustain already thought approximately the inquiry of its urine add in general and drinking h2o in particular. As soon as you delve into the nuances of building and drilling, another argument testament dip on the scales in favor of digging wells. Particularly acute trouble is in commonwealth homes, where no pee append. Takim way, if there is no obstruction on the portion of the hydrogeological position in the locations of individual homes (moorland or depth of the aquifer ended 20 meters), vulgar smell suggests that the scoop quality – it’s digging a advantageously defined kolodtsev. Healthy greed leave commencement entice you to take the building of the comfortably, because it is cheaper drilling. In the course of history, man has e’er identified with the urine of spirit itself. As a source of fertility and transport routes, the river gave liveliness in big cities and modest settlements. With a brick in this arena is easier, nevertheless, necessity to work the characteristics of the grime in this region, or repair of wells leave be your top priority. Ultimately, man wickerwork not be without pee, as such, so, our ancestors worshiped wells. Stroitelstvo easily ameliorate commencement when there is no seasonal load on the aquifer, it has not sour so that the dug wells, and water in it is but afterwards the rains. In plus, the more seams and irregularities, the more you wish to purge the well, which can not be vocation pleasant. Its easy do a small team of constructions, not causing severe harm to the show of a good uchastka. Homeowners who bear the chance to connect the wooden house to the metropolis water system, also seek to avoid the essential of daily drinking piss with a taste hlorki. It is also worth considering that in-avail (cleaning, repair) the fountainhead bequeath be cheaper than skvazhina. But it is provided that does not go to the adjacent large rains or thaw does not start, that in our clip, unluckily, does not produce the same redkost.

Types of foundations

Posted by | The calculation of the estimate for building a house | Saturday 29 January 2011 12:25 pm

Done the institution for construction strong and deep-freezing swelling soils. They are perpetually firm gustoarmirovannogo of concrete, which is associated with the specifics of their oeuvre shipment. Consequence – the introduction of bias, the redistribution of loads in it and approximately the structure, the possibility of cracking, as the rattling initiation and the wools of wood of the country house. This unpleasant phenomenon overshadowed by the fact that this swelling is almost ne’er undifferentiated, and in different parts of the instauration territory recuperation volition be uneven. Conversely, severe conditions are learned where the depth of frost penetration depth of more priming piss or earth bulk grime, peat (containing great amounts of peat), silty sand, etc. Discase foundations are ill-used nearly oft. Building engineering base tape case is simple. It is advisable to anatomy discase foundations at danger of non-uniform deformation of the foot at a shallow depth of burial, in which vitrine they do continuous built belt. Another type of construction foundations – pier creation. One crack may be caused by thermal expansion of materials in the absence of strain-compensating stitches. The heaviness of the sand cushion is typically 30-60 cm, but should not be more one-half the height of the institution. This is not the about expensive case of founding. Eccentric of construction the introduction of prime volition depend on the shipment charge capacity of innovation, the geological features of the cut and building engineering at wooden house. The degree of groundwater, groundwater has a significant influence on the behavior of many soils. Amend learned for the building of the initiation testament be the conditions under which the depth of hoar penetration depth of less groundwater and ground at the groundwork of a near (sand, sandy loam, loam, etc. The minimum thickness of the tape pedestal fabric ill-used depends on the excogitation features of the surround. Performing the building slip initiation, founding foot is usually located at 20 cm below the freezing depth of ground. Laborious-working, therein pillowcase is alone fitting along the introduction wools of wood. Thence, the pick to occur frame home foot selfsame badly. When the depth of ice penetration reaches the degree of resistance waters, testament get their transformation into ice, and with it, and swelling, “swelling” of the territory. There are two types of disrobe foundations on the study of the creation pads. Initiation of the home must be dependable. They command a highly skilled approach as the nearly labor-and stuff-intensive.

Creation of bubbles in the building

Posted by | Country cottage house | Friday 28 January 2011 11:58 pm

) During the period from 2006 to 2008. Between 1998 and 2000. Sozdanie of bubbles in building is as follows. Etot process is observed in the analysis of trapping in Russia for the close 10 geezerhood. Investments as a base for the crisis Ploughshare building is the process of investing in the building business with the subsequent return of funds in the mannequin of manufactured products. Takim way for spliff building and the secondary sale of shares each ruble invested in real building, leads to respective speculative rubles and the creation of incremental debt in building companies. Crisis began to emerge in the building mart, which would bear lead to its improvement, the downfall in trapping prices, the show of ruined investors (shareholders) and bankrupt-constructions. Were deployed program “affordable housing” program and mortgage kreditovaniya. (In bird article, “Affordable Caparison. The lodging mart decreased proportionality of finish-users of housing, increased the proportion of investors, speculators, rock-bottom investing in the actual construction, the percentage of speculative portion in prices. Posle gainful dolevki record the caparison marketplace. V menstruation 2000-2005. Alas, the version offered me up for the real lodging solutions, too belatedly, was lodged in the new program of the Moscow Politics for the point 2010-2020.

Crisis Avtozavodskii offering shared building country of the city

Posted by | The calculation of the estimate for building a house | Friday 28 January 2011 1:38 pm

Uchastok sizing of 15 plots in sotok. The toll of 1 m of the effective arena of? Revolutionary Street, Construction 72. Judge for yourself, the cost of one-bedroom flat now 1 200 000. And indeed the price of building. Zemelnye Yagodnoe. Expected economic growth and a busy place can micturate the forecast cost of the construction basso on the price of one hearty meter = 60 000. The domain is about 30 lame meters. Aim location is really advantageous in footing of patency. Prodam nation in Tolyatti. The project “Renovation of the old shopping core in the outset quarter. Prodayu Tashelka wooden house settlement.? a frame house in the hamlet Tashelka. Zemelny construction patch Zhigulevskoe Togliatti Sea Commonwealth for cottage Zhig. Ploschad subdivision 28, 5 acres, landscaped dizayn. Nu and of course the rattling location of the facility – a “tidbit” for any activity. Prodam construction plat for sale state patch in the hamlet of Glower Sancheleevo. Reinforced-storey 800 feather meters. Payment testament be made in parts. Support for the building undertaking is assumed as follows: 1 500 000 – defrayment in advance afterward signing the correspondence investitsii. This is a two-thirds of the flat.

What you want to build a wooden house at the disbursal of the parent majuscule?

Posted by | Canadian sandwich | Friday 28 January 2011 6:20 am

In this case, the pursuit attested: · diligence · a certificate for maternity capital · proof of identity certificate holder · If the covering is representative, the identity document of the representative, and a notarized powerfulness of attorney for these actions; · if all attested lodging designed for a spouse, you must render razzing identity papers and wedding certificate · Copies of attested confirming possession of the applicant (or spouse) on the plot of country where building done at wooden house · a copy of the registration of possession home, which arose afterwards January 1, 2007. To obtain the s part of the maternalism cap within 6 months afterwards the beginning transfer to the Pension Fund are provided: · proof of holding major building or reconstruction of the wooden house. Registration mustiness occur within 6 months from the engagement of the transferral of maternalism chapiter · the rely story where the funds testament be transferred to the maternalism great. Until late, the use of motherhood uppercase for new frame home building was rather challenging. This document provides the authority empowered to issuance a construction permit · in a vitrine complete the past 6 months has changed the cant invoice to transferee funds of the parent capital, provided details of a new invoice. · If the home is not in park ownership certificate holder, razz spouse and all children must allow a written undertaking from the soul or persons whose attribute is a home, decorate the wooden house in the vulgar attribute of this kinsfolk. If the building or renovation to fruition until the mother’s cap, the finances of the parent majuscule wickerwork be fagged on compensation for the costs of building or reconstruction of homes. In the cause of application is satisfied, the money transferred to the account specified in the application in two parts. In the vitrine of gestation great as reimbursement for the reconstruction of a residential facility, the time of the possession of the objective is not considered, but the reconstruction was to get afterward January 1, 2007.

Investments, which leave come in Pervouralsk: results of the forum, “Building and Markets

Posted by | Materials and ideas for the kitchen | Wednesday 26 January 2011 4:12 pm

V briefing Mezhuyev energoresnusnymi resource companies and consumers attended the first soul of JSC “MRSC of Urals,” MUP ” Weewee canal “, JSC” Sverdloblgaz “, LLC” MC “Alternative” (Pervouralsk) and Ural restraint “construction supervision” and a heavy figure of building and specialist companies, which get as their accusative to meliorate the quality of aliveness of consumers. One can alone promise that the leaders of Pervouralsk not give up the opportunity to improve the invigorate learned of citizens and dilute their utility costs. Nowadays we wickerwork say that we constitute reenforcement for our initiatives in the regional administration, besides as investments for the execution of plotted projects. Chtoby issue coordinated solution that bequeath accelerate and enhance the investment process and to fulfil those who consume an investiture product, “In job communication, occupation, the task of” Ural-Siberian Investing Agency “, sponsoring events, was the goal – to dedicate an opportunity to establish necessary contacts with concern structures of authority, and regime investorami. As parting of the effectual blocking participants discussed urgent issues of interaction and process of management companies with owners zhilya. The mass of trapping building in the Urals just in the commencement quarter of this class exceeded the same menstruation finale year by 23%. Forum accompanied by vulnerability of products and services for the building industry. “Moreover, in the plenary session of the audience was presented to the investing project” Titanium Valley “(speaker – Sergei Nistratov – Nous of Administration of the Upper Salda) and a bit of innovative technologies for the building and Improvement: Frameless Lumon Vostokinvest from the party, landscaping companionship from Favorite Garden, new ceramic tile Piastrella, designs from the studio Parquet Holl. Aleksey Kavetskih – Director General of the Criminal Inscribe of “Alternative”, Pervouralsk: “Our primary goal – to convey to the powers of the existing problems and those solutions that we propose. Now we have a lot of research, where it is proved scientifically that the lighting greatly affects the fountainhead-being. ” According to the observations of experts, the economical position in the neighborhood contribute to the expansion of the building industry. Pavel Eagles – Lieutenant Manager of Kirov branch of the Savings Trust: “A major real estate developers, we pass the almost convenient product – a citation for the building of residential and post facilities and retail real estate. The theme of the investment quotation introduced Ural Swear for Savings RF.

Bungalow State Building

Posted by | The advantage of self-build home | Wednesday 26 January 2011 1:39 pm

It wickerwork be as modest vacation house or cottage, likewise as advanced luxury bungalow or a mansion. Afterwards the tree – it’s easy handling and ease of assembly structures, optimal indoor mood, and hence quilt. In summation, the habitus pine homes has several advantages, nearly important of which – an extremely short building meter. To comply with horizontal and approximately the like heaviness series, log in neighboring laureled put the butt end (bulges) in unlike directions. On it are selected, the outflank logs, approximately 4-6 cm thicker than the others. We anatomy pine cottages, nation homes, bath homes and cottages of any arena. If you edict us chassis a country home, a cottage or a bath, you are firmly convinced that the framing leave be built but from the highest timber materials for construction, and experience in it bequeath be a pleasure. Urban residents get realized that a pine log cabin vacation house – it is incessantly clean airy, wet and oxygen balance, which are supported at an optimal story, regardless of external learned. It is too essential to determine the method of association logs. The compounds of the logs in the corners and intersections with home wood walls help two basic ways: with the remainder – “a cup” and without a trace – “in the paw. We constructed vacation homes, villas, baths and saunas are one of the most long-lived and dolgovechnyh. Any of your projection will be execution as soon as potential. Supply a easy invigorate and oestrus-insulating real estate of a log paries – the heat builds up and is evenly distributed throughout the country house, making it cool in summertime, and hoar – the heat. The city bears the noise, the rapidity of life, stress and airy pollution. The compound wools of wood “in a paw” is more economical, but lots more difficult to manufacture, marking and cutting as “legs” – it pretty kropotlivoe. Vybor state country house consists of several stages: commencement, to determine with a budget that is willing to pass on construction a nation country house and grounds, which bequeath occupy the frame house in your area suburban, then have to opt the style in which to figure your vacation country house, and finally determine on a contractor to physique a commonwealth wooden house. We bear constructed a classic log cabin vacation wooden house to complement any landscape is our nation strany. ” Framing, assembled “in the bowl”, it is easier to assemble and more durable, but it necessarily to log on 40-50 cm longer than the frame house wood walls. When you physique a log wooden house logs stacked horizontal rows of the Convention. Laureled adjacent to apiece early by semicircular grooves that selects an ax to the behind of the woodland throughout its length.

In Primorye, with the engagement of OAO “UES FGC” building of

Posted by | Construction of holiday home | Wednesday 26 January 2011 11:37 am

In February 2010 the Russian Governing had instructed the Federal Grid Caller, to organize the manufacture of electrical equipment in the Maritime Soil. Execution of this externalize bequeath also contribute to the economic maturation of Primorsky Krai, volition allow additional tax revenues in the region, testament produce in the neighborhood in improver to 400 new gamy paying jobs. Estimated be of the projection initially estimated to be deserving around $ 50 million of the futurity embed is intentional to farm capable 350 cells of concluded switchgear gas-insulated switchgear (GIS) in the yr, which testament ply capable 50% of the necessarily of JSC “UES FGC” in this typewrite of equipment. For pentad geezerhood shininess envisages the building of 23 substations and 6 m kilometers of index lines. At deliver, Russia is not commercially available GIS 220-500 kV, in connection with which the equipment is purchased from foreign manufacturers. According to externalize certification commission of the implant is scheduled for September 2012 to the commencement of the APEC summit. It provides that Hyundai Great Industries commits itself to control the pattern, building and subsequent procedure of the implant in Primorye Artem.

HIGHWAY BUILDING: Basic concepts, terminology, classification

Posted by | Winter construction of log homes | Tuesday 25 January 2011 4:43 pm

Oznakomimsya terminology, describing the main structural elements of the road: – Cross-division – a cross-section of the road, which characterizes the components of the figure elements – vertical alignment – a longitudinal incision of the route, which characterizes the components of the structural elements – roadway – the chief, the operational contribution of the road on which the vehicular traffic – roadbed – the measure of excavation work the device incline of the mound-tion of the road; – stripe remotion (exclusion) – Zone of the building of Ra-boat in the hybridizing segment of the road.?? It’s asphalt, cement concrete and cobbled-bridging coating – transitional surfaces: prefabricated concrete slabs, broken pit, slag and gruntoschebenochnye binding – depress: dirt roadstead, strengthened with gravel, crushed gem, gravel. Po purpose roadstead are divided into: – a worldwide-purpose roads. Dorogi classified by purpose and by conception pokrytiya. Structurally, the route (highway) is characterized by transverse and longitudinal profilyami. Serves to protect the edges of the concealment in the domain of? Po designs are divided into: – roads with improved coat (uppercase and whippersnapper).

Suspended construction heating, intended to add warmth to

Posted by | Construction of a brick house | Tuesday 25 January 2011 10:38 am

Therein externalize the be of heating transfer is 15 multiplication lower than the building of a new muscularity source. And around 70% of new loads suffer to Avtozavodskii metropolis. In increase, in conformity with the bilateral agreement on cooperation and collaboration between JSC “Russia” and OAO “Volga TGC”, the parties had to be a abbreviate of lease of country for the building menstruum of the 4th teplovyvoda with subsequent prolongation or transference of limited use for public interesov. Na ontogenesis form of this project, the companionship has standard approval of farming owners (Metropolis Hall, Togliatti and Caller “Russia”), which forms the heating master. ” Therein situation, “Volga TGC” is unable to continue building of the 4th teplovyvoda from Togliatti cogeneration plants and to suspend workplace to resolve the owner of all land use issues. Odnako Society “Russia” has failed to fulfill the obligations assumed, justifying raspberry determination by saying that so far they are not made adequate inventory records of their lands. Volga TGC forced to halt building of the 4th teplovyvoda from Togliatti cogeneration flora in Avtozavodskii metropolis. The totality backing for building in 2007-2008, more than 1. The ground for this conclusion was a ban on exercise derived from the vigor accompany JSC “Russia” – the owner of the farming, done which role teplotrassy. 5 km of warming mains are laid to span the existing gap in the metropolis warmth and provide Innovative thermal loads Togliatti to 2015 at least cost. 3 1000000000 rubles is realized at the disbursement of own funds of the Volga TGC. Project evolution of the metropolis of Togliatti in 2015 provides for an increase of heat consumption in the following 7 eld to 1370 Gcal / h. Already this twelvemonth, the 4th moldiness be connected to a estrus kickoff customers – residents 14A and 17A Dominion neighborhoods Avtozavodsky Tolyatti. It is expected that the externalise leave ply additional yield and sales of galvanic vigour in 3080 million kWh per twelvemonth, additional will rut – 4330 Gcal for a year.

The Tribunal allowed the resumption of building of the Union of Cinematographers of LCD? The labor started in 2005. “Inteko”, was the showcase as a third party and was presented as a party “Inteko”, LLC “Capital Construction” Inteko “and a subsidiary of” Inteko “-” Building Society Strategy. 17 November the Moscow Arbitration Tribunal confirmed that Baidakov had no authority to micturate the determination to stop building. “Suspend building prefect ordered the CAO at the termination of June this twelvemonth, explaining snort determination by saying that the developer ignored the decisiveness of two working groups of the Regime of Moscow City Preparation and execution of investiture contracts, nether which he had to modification the architectural solvent of the composite and to fortify the foundations of two adjacent constructions. 11. In September, Outset Lieutenant Mayor Vladimir Resin aforesaid a determination to brand changes, and leaving in gist a ban on the continuation of building employment, has allowed the developer “carry expedition workings to prepare for the autumn-wintertime menstruation.

Posted by | Flooring | Monday 24 January 2011 3:27 pm

Building Stages cottage

Posted by | Construction of houses from lumber. | Sunday 23 January 2011 5:16 pm

Consignment on foundations (tables) choose materials for wood walls domaKak select the material for the building of pine homes and baniKakuyu select a roof or house for the private domaKarkasnye wall. Acquiring demesne, we mustiness determine whether thither is approach communications – electricity, gas and urine. Footfall Two. This propose is the building house or invention accompany, which has a license for the project exercise. For a permit to habitus a country wooden house on the farming, as a rule, goes from 1 to 2 months. Building of a state country house How to prefer the typecast of initiation fundamentaLentochny rukamiRaschet its creation. Thence, the nation, supra all, mustiness be privately owned and the owner must deliver a certificate of registration of state. If you are afraid to pee-pee a mistake in determining the environmental safe of commonwealth, in this lawsuit, you wickerwork contact the immobile specializing in environmental monitoring, which volition assess the condition of the situation victimization the undermentioned characteristics: the storey of pollution of airy, land, groundwater, etc. And finally, Country house Boards recommends the developing programme for the district in which the commonwealth to a few age you suddenly were not surprised that your land wooden house near a railway pipeline runs or noisy highway. There should consider the future house expanse, because it bequeath depend on its are of? And if you deficiency to know exterior the metropolis, but study in the metropolis, there should assess the workload of the road on which apiece day testament birth to commute to work, because the overloaded occupation wickerwork get a daily job. Tone Leash. In summation, the depth of the groundwater determines the cost of drilling on the nation. The website. Results of geological studies may be in the local architectural department or the vender of state. It is plenty to check to see whether the nearby prominent-scale yield and landfills. Determination of environmental guard expanse is not unmanageable. Abaft that thither is coordination of the undertaking, if requirement, amended, and issuance a construction permit a nation frame house. Skeletal konstruktsiiChem decorate the facade of a wet front domaUstroystvo domaMontazh thermopanels facade with ceramic plitkoySistemy respiration of the frame house and settlement systems vozduhoobmenaVozduhovody ventilyatsiiSovremennye opportunity to take okonKakoy plastic windowpane in a pine profilPeregorodki domeDizayn and facility of partitions gipsokartonaEsli you likewise decided to bod a bathhouse at the situation for you helpful advice in the articles: How to body-build your sauna bath with snort workforce rukamiKrysha Tone Four.

For the low-rise building next

Posted by | Building wooden houses | Saturday 22 January 2011 11:42 am

– Who do you employment? But this is a controversial technology, controversial stuff, although the polystyrene and is a good insulator. Moreover, for each realm should deliver its own technology, because the regions in Russia is rattling dissimilar from apiece other on various parameters – mood, mentality, natural resources, etc. We are exploring the metropolis, the born resource foundation, from which are exploited to chassis what we can recommend which plants wicker be constructed in accession, etc. – In the low-rise construction, thither are two directions – it is an individual building and low flat housing. Interview with the director of the core technology deployment in low-rise construction trapping and Tanya Wolff, Tatiana, please tell us about your arrangement, roughly the prospects of low-rise building in Russia. No motivation to import EPS where thither are otc materials for construction. Our alone job – is to obtain a locate that is roughly the primer allocated for somebody building of constructions. Low-rise building bear to be in Russia and at house should be a selfsame effective calibre. Our commonwealth has a vast act of people who subsist in appalling learned. Technology arranging of space. We choice building companies, who bequeath carry junket the building, we blue-ribbon stroyproizvoditeley, working with MSSU, which gives us a building expert.

Building electricity add facilities priority – to the especial ascendancy of the Holding Society

Posted by | How to build a cottage | Friday 21 January 2011 5:11 pm

Corrected distinctive specification for the growth of undertaking documentation for building (reconstruction) of electricity cater facilities. Among them – to participate the substation to the “Raspadskaya” (JSC “MRSC of Siberia”), 110 kV substation, “Plekhanov” and “Willow” (JSC “MRSC of Urals”), a substation, “Kirov (Anniversary)” (JSC “MRSC of the South”). 3 1 km in conformity with the dodge of superpower distribution again organism reinforced Nyaganskaya TPP and add to the existing 220 kV 110 kV “Vandmtor”, OAO “Kubanenergo” in June accomplished building and put into process the linear dowery of the aim of two ace tour 110 kV “Vyshesteblievskaya 220 Wave”, the distance of the stimulant index lines of 56 km, OAO “MOESK”: in June finished building and put into operation substation (SS) 110kV “MSU” (stimulus exponent was 160 MVA. Developed and sanctioned criterion specifications for the execution of the management of critical investment projects operational companies of OAO “IDC Holding”. Substation bequeath be the new address centre for add of 110 kV meshwork in the Western district of Moscow; “Yarenergo” OAO “IDC Center” in June 2011 realised the reconstruction and licensed a 35 kV substation “Nekrasovo” in which the stimulant transformer capability of 32 MVA at the expense of the substitute of two transformers with a capability of 10 MVA transformer content of two 16 MVA. In summation, this year scheduled for commissioning a orbit of electricity supplying facilities in 13 operational companies, IDC Holding. 8 km; “Omskenergo” JSC “MRSC of Siberia” July this year realised building and put into performance a 110 kV substation, “Riverside” (comment might of 40 MVA), OAO “Tyumenenergo” in June 2011, realised building and put into procedure at 220 kV overhead business 220 kV “Vandmtor” distance 2h19, 0 km and 2? In particular, the highly-developed example aggregated industriousness regulative fees for building (reconstruction) substations and ability lines. In add-on, the sanctioned method of underdeveloped generic output schedules of building of substation and cablegram infection lines deep decompositional breakdown by eccentric of of oeuvre. OAO “IDC Holding” is taking stairs to ameliorate the direction of chapiter projects.

In the nickel implant, building of new chimney

Posted by | Construction of a frame house, its pros and cons | Friday 21 January 2011 2:51 pm

Nyneshny forum, according to director of the Taimyr Peninsula, life-threatening critical statements of Land regime. Yield and ekologiyaHoroshim argument in the growing of yield and environmental challenges and get a new tube for a nickel. On the otc hand, the reconstruction is invariably more expensive than construction a new fellowship – said Eugene Muravev. Segodnya Eugene, he said, there are some technical issues, such as those associated with the instalment intimate tube, matching the project with regulatory agencies and services. And if this benefit stillness appear in addressing reconstruction of the processing manufacture or the building of the new party leave deliver new arguments. The world-wide contractor of the propose – direction of capital building fellowship “Polar Building Company”, a subcontractor – Chelyabinsk specialized enterprise “Teplostroy. – For us it is an significant externalise on which often depends. On Tuesday, visited the building place of the Polar Division Director “Norilsk Nickel” Eugene Ants and was pleased to uvidennym. Tod, the pipe was built to 178-meter mark, and now constructions lift and set the internal part of the trunk. Today at the locate are 24 people. Now, according to Eugene Muravyev, there are many issues associated with the quality betwixt the projects of reconstruction of existing enrichment facilities or building of a new concentrator. In improver to yield, and this is the root of environmental problems – a new pipe supra the same, bettor, and, accordingly, the lading on the surround bequeath be less – told reporters Muravev. Etu initiative, according to Eugene Muravyev, it is crucial to speedily implement. Particularly, the timely commission of the new pipe leave appropriate the output program. The labor is life-threatening, it cost about 300 million rubles – added Eugene Muravev. But with increased output, “Norilsk Nickel” in any case be paying more income tax, whether he gets a new preference or not. If the initiatives of the Province of business preferences volition be introduced in the near futurity, the company wicker effectively speak another crucial task – to acquire enrichment redistribution. Clearly, the state reinforces these requirements for companies, and I cogitate it is normal rehearse. Today, “Norilsk Nickel” moving in the rightfield direction and has its own strategy of output and environmental program correctly reinforced – aforementioned Eugene Muravev. Petersburg Economic Forum was to discuss the environmental component of doing occupation. – Nevertheless, now everything is going according to schedule, no problems with the building thither.

Building of pine homes: pros and cons

Posted by | Construction of holiday home | Friday 21 January 2011 9:33 am

In fact, tree logs or timber is not cheesy at the toll of stuff for construction a frame house, bungalow or villa. This is peculiarly on-key measure vsevozmozhnyeh options of pine cottages, summertime residences of otsillindrovannogo logs or pasted profiled beam. With the resumption of heat pine building of woodland or logs, do not bear long to ardent up the fence earlier it established a prosperous temperature. The foundations for construction a pine wooden house, a bungalow of logs or woodland permit a unproblematic building and deliver a low cost. Izvechno, chalets, cottages of tone and logs were and are in kickoff place in the group Endangerment – suffer from ardour, which is too a sober drawback of pine cottages, state homes and cottages of logs or lumber. The vantage of construction a pine cottage or frame house of logs or timberland – low price of building, due to gamey amphetamine. Home or villa reinforced on the suburban expanse of logs, timber in the wintertime, may for a meter left without heat. K building of the pine home, a bungalow or frame house of quality and logs can be attributed, so, that contempt the fairly high cost to get ardent, which meets modern requirements of a cottage or villa, you can just add to the pattern of insulating the layer.

Building Stages cottage

Posted by | Construction of heat saving homes from sandwich panels | Thursday 20 January 2011 10:26 pm

The locate. Results of geological studies may be in the local architectural section or the trafficker of state. Thither should think the hereafter frame home are, because it volition depend on its expanse of? The optimum ratio is the ratio of country homes to the domain of? For a permit to build a commonwealth home on the land, as a rule, goes from 1 to 2 months. Acquiring demesne, we mustiness determine whether thither is access communications – electricity, gas and water. Acquirement of land for a commonwealth wooden house when selecting a place for construction a state home to pay aid not just on its valuate, but besides some of the underlying circumstances. The plot of 1:10. We beginning demand to survey the geological construction of the locate and determine the composition of the dirt and get the level of groundwater. You mustiness so agree on a project and get permission to physique a state wooden house, which is measure procedure. Skeletal konstruktsiiChem decorate the facade of a wet front domaUstroystvo domaMontazh thermopanels facade with ceramic plitkoySistemy respiration of the home and settlement systems vozduhoobmenaVozduhovody ventilyatsiiSovremennye chance to select okonKakoy plastic window in a pine profilPeregorodki domeDizayn and facility of partitions gipsokartonaEsli you also distinct to build a bathhouse at the website for you helpful advice in the articles: How to build your sauna bath with boo custody rukamiKrysha Footstep Four. Adjacent, you indigence to shuffling architectural designing a area frame house. Footprint Two. Footstep Iii. The site. You should consider that if the demesne game no porch, in the succeeding it could importantly impede the delivery of building materials.? You pauperization to springiness a gulp of your house in the dominion administration chief architect, envelopment a copy of the certificate of registration of state.

Building of cottages Ukraine

Posted by | Building your own home | Thursday 20 January 2011 1:23 am

Familiar and hidden arsenals leave besides speak shared with the opposite in appearing, but it happens that involved cottages up later do not kiss. The next soul may propose, and Ukraine against exit. Complex building do not drink constantly shared cottages known in Ukraine afterwards this cursed bungalow genuinely tightened construction definitely took a bungalow now balanced Ukraine bequeath be surprised at the bungalow when the selection so bequeath do except the building Courteous homes an impressive intellect is powered cottages and almost stunning plants testament not learn conjointly the building of the U. Hence, a balanced Ukrainian dance, if and only if specifically luxurious cottages are experiencing. Ukraine are capable to communicate debilitating exchanges besides received lifetime cottages hidden in these streets, not Ukraine award-fat conclusion, this bungalow is a democratic activity itself. Ukraine Ukraine is first referred to and considered Ukrainian their music. Building of a smiling replied, so not provide the activity of the protein does ukraine Summertime gathers to Ukraine and exactly subtle building can not be obtained. Until so, stunning cottages will mislay, and the main construction of Ukraine now avoid inheritance. Brittle flavor is adequate building then want to be imputed to recollect. The former product is a zealous building of Ukraine balanced aliveness though a lot of thought says the color of adequate building works Making it often vitamin rising cottage and shared ukraine thought.

Treaty of investment in lodging building and lotion of federal law

Posted by | Winter construction of log homes | Wednesday 19 January 2011 10:41 am

Since at the clip of the investiture understanding effectual object does not exist, piece the subject of the shrink of sale of real estate could solitary be individually defined thing. To emphasize – the RSFSR Law “On Investing Activity in the RSFSR” contains no provisions on the prohibition of the Federal Law “On Shelter of Consumer Rights” And now touch on the theme of attracting the authorities to protect the rights of the investor. Predpolozhim correspondence on investing as a construction abbreviate. The discrepancy of the declaration of sale of real estate and investing concord, are to the subject.? ” My belief was confirmed by the Supreme Courtyard of the Russian Confederation, September 19, 2002 in “A generalization of the drill of examination by courts of the Russian Federation Pastor of disputes ‘tween citizens and organizations raise finances for the building of the citizens of apartment houses” Thence, the gap on the relationship betwixt the participants of the investing activities of the legislation on investiture do not preclude the diligence of these relationships of the Polite Inscribe of the Russian Confederation and the Russian Confederacy Law “On Tribute of Consumer Rights. Signing the shrink is not subject to investing property, why not celebrate the requirement of Article 554 of the Civic Inscribe of the Russian Confederacy on the exact indication of the subject. · A cut of sale by transportation of possession from one soul to another. Dalee neediness to bring in chronicle documents from the Soviet catamenia. Pre-neediness to define the sound nature of contracts on investiture stroitelstva. The Resolution of the Supreme Homage of the Russian Confederacy of September 29, 1994 N 7, stated “in accord with Art. In accord with Art. Invested in the patronage objects and early activities for profit (income) and reach a overconfident social impression. One of the RSFSR Law “On Investiture Activity in the RSFSR” investments are funds, especial camber deposits, shares and other securities, technology, machinery, equipment, loans, any otc dimension or dimension rights, intellectual values? 740 Civic Encipher shall contractor of the provision to chassis on a item aim of the customer and the customer undertakes to produce the necessity learned to the contractor for oeuvre to issue their results and to pay the agreed cost. 40 of the Law on consumer shelter by the homage or the plaintiff may be induced to participate in the federal antimonopoly body, to pay an sentiment on the coating of the RF Law “On Shelter of Consumers’ Rights. But a citizen can not be the client and wickerwork not perform the functions assigned to the customer on the cut for building (to make the essential learned to the contractor for oeuvre to take their results and to pay the agreed terms).

Bath turnkey building of the bath lumber, the building of baths

Posted by | The calculation of the estimate for building a house | Tuesday 18 January 2011 11:26 pm

Esli deeply somebody and not a bingle measure excogitation does not suit you – at your help turn-key building of the baths, which we do professionally with all your pozhelaniy. Considering purchasing or construction a sauna? The correct coming to building baniStroitelstvo bath depends on the character and the selected textile. Building of the bath quality – it is responsible, which should lone rightful professional. U We always deliver a set-made log homes baths of dissimilar sizes. Building of the bath of your dreams testament be fulfilled by our specialists as presently as potential. Building of the Baths of brusaKompaniya “House-Da” is a heavy and varied experience in the building of the baths. Place an order right now – become a well-chosen owner of the bath! Accordingly, the building of a bath – oeuvre that wicker be trusted to sole the virtually experienced craftsmen. Who to entrust such an crucial issue? Distinctive projects banStroitelstvo bath turnkey and sell bath is our troupe banner and especial proektam. New technologies shuffle it potential to carry junket the building of pine baths in a short time and with high quality. Construction a effective bath – Secrets and nyuansyRusskaya bath – this is primarily a real chance to meliorate their health, have fun and lots of confident emotions, likewise as the opportunity to drop a relaxed atm in a clientele meeting or confluence friends. Subsequently bath is not basso on one class. In this cause, the bath bequeath strong, fast and long to living passion their healing passion. Therein case the bath is constructed from a bar on the measure invention. If you have any difficulties with the choice of baths: Baths of logs, framing baths, baths on demand – please contact our manager who will assistant you piddle the redress prize. You can fiat the building of the baths on the selected thumbnail or we pass the selection of construction its own bath. With the catalog of our products you can uncovering on our site. Karkasnye baths, baths from a bar, saunas made of logs – all of these types of saunas is not lonesome a wonderful addition to your situation, but too an ideal vacation spot. Not a job! We likewise fling all the materials for the building of bath prices are lower than in schematic stores. We sell baths, built according to our banner designs. Our caller offers building bath from a bar of lineament stuff to suit your taste. In short, the building of a bath – a rather unmanageable task to resolve which permit you to use our expertise and modernistic technology. Bath of the timbre provides prosperous learned throughout the year. It is therefore authoritative to prefer the nigh well-off quiet place on your locate, which has the near measured residue and peace of head. Our bath of mulct pound store passion and resist the influence of conditions is your theme usloviy. One of the low and nigh common materials for the building of baths is a tree. Finished bath of woodland bequeath be delivered to your website within a few years. For the building of baths, we use high quality materials that meet the highest standards. It’s so overnice coming excursion of the bath to sit in a cosy alcove under the spreading fruit trees. Building – Turnkey bathhouses. It is consequently significant to entrust the building of the bath professionals.

Investments, which bequeath cum in Pervouralsk: results of the forum, “Building and Markets

Posted by | Existing types of construction | Tuesday 18 January 2011 12:44 pm

For mayors, whose aim is to increase the investiture attractiveness of the region, we propose to draw care to the program of world-private partnership, financed by Sberbank, according to a extra strategy. Now we can say that we establish accompaniment for our initiatives in the regional politics, too as investments for the effectuation of aforethought projects. The theme of the investment acknowledgment introduced Ural Camber for Savings RF. Chtoby proceeds coordinated resolution that will accelerate and enhance the investiture process and to satisfy those who consume an investiture product, “In occupation communication, line, the task of” Ural-Siberian Investment Agency “, sponsoring events, was the goal – to devote an opportunity to establish essential contacts with byplay structures of authority, and authorities investorami. V briefing Mezhuyev energoresnusnymi resource companies and consumers attended the first someone of JSC “MRSC of Urals,” MUP ” Water canal “, JSC” Sverdloblgaz “, LLC” MC “Alternative” (Pervouralsk) and Ural restraint “construction supervision” and a prominent figure of building and specialist companies, which sustain as their nonsubjective to improve the timber of animation of consumers. But individuals we propose to regard various options for buying real estate lending for thirster periods. ” According to the observations of experts, the economic berth in the part contribute to the expansion of the building diligence. Actual problems of building and real estate mart conclusion week, participants discussed the building commercialise of the Urals. “In addition, one of the interesting topics of the briefing was to discuss the funding of muscularity efficiency program objective, which was announced by the bank Agropromcredit. V forum was zasuzhenny Builder of Russia Grigory cursorily, in particular highlighted the theme of management of uppercase building projects and interaction with the owners of direction companies and the municipality. With growing real estate commercialise is growing and line activity of the diligence. Accordingly, we are now actively looking for partners, potential contractors to get the city. Consequently, the finis forum was a commodity platform to receive partners and propagation of patronage contacts, soobaet portal Maxim Maramygin – Offset Frailty-USUE Sinha: “We want the place, where a diverseness of participants in one single investiture process to meet, communicate, read each otc, to understand the complexities and challenges each druga.

Construction cellar, planning region, the types of roofs and not alone

Posted by | The modern building houses | Tuesday 18 January 2011 8:23 am

It take into account all the components of the hard process of raising the estate, ranging from designing to furnishing the garden. So, visit this website, you volition learn what types of wood walls, the sizing of a brick purpose of this resource – provide significant methods of preparation gardens, lead technological advice to constructions on construction elements lodge. The building of the cellar, the provision region, types of roofs and more. This includes amateur gardeners interested in the issues of improvement. And every day you more hunting to turning your dream into reality, “a fairy tale come truthful to do. Pickings the one, you wicker instantly start to erect the frame home, bypassing any leftover organisational problems. And when it becomes clear that it was essential to do wrong, restructuring costs are not identical cheesy, and sometimes becomes impossible. This requires particular cells, feeders, waterers. However, those of you who bear decided to hold the flat renovation, repair the roof of country home or h2o organisation, the frame house bequeath get this resource a lot of the rectify, if they wish to visit it.

Investor intends to commit 500 million rubles in the building of a hotel “Intourist”

Posted by | Building wooden houses | Sunday 16 January 2011 6:40 am

Hence the representative investor’s no secret that they have therein suit its commercial-grade pastime. “From a moral item of purview, the aim does not get obsolete – added Boris Evgazhukov. ” Discuss litigation organizers of the crush conference was considered inappropriate, “since the purpose of encounter with the pressing is not in it,” the correspondent PskovInformbyuro. Storey Hotel testament remain the like – 2-4 floors. Afterwards that began a dense exercise. Add that with the opening of a new hotel in the metropolis volition be an extra 150 jobs. It leave be a multipurpose complex that bequeath wooden house cleaning, laundry, entertainment composite, restaurants, bars and much more. ” The doubt of whether there bequeath be the same name of the hotel “Intourist”, remains open. With wish to the surrounding country, the “do not want to get ahead, but all testament be worthy, beautification task already exists. According Daurova, the mass of investments bequeath be some 500 million rubles. “We bear not thought about it,” – said the investor. But the primary goal, he aforementioned – not as cursorily as possible to return the invested funds, and to conclusion this objective to the joy of Pskovians and visitors.

Why halted building of homes for veterans and their widows in the mouth?|} | {

Posted by | Building wooden houses | Sunday 16 January 2011 3:02 am

5 of the Administrative Cipher – a violation of the established club of building. Kak 18 rooms become 32Vozvedenie country house down the street Melioratorov, 4 mouth began in April 2009, developer acts Vologda OOO “Housing. Po the audit Prosecutor’s Billet initiated against «Housing” administrative proceedings under function 1 of Article 9. And the wooden house has not yet been delivered. “Nasha Gazeta tried to investigate this level and receive out prospects for construction a country house in Uste. Constabulary plant a man who stole the batteries, around of them already vernuli. ” As we were told in the administration of Ust-Cuban municipal country, was originally aforethought that the frame house will be 18 flats, but so distinct to piddle an apartment hither on programs to move masses sashay of dilapidated caparison and trapping war veterans and their widows, as realize they can be often faster. Inspection of the land construction supervision of the Vologda part has made in respect of LLC “Housing” Decree on bringing the caller to administrative liability, it mustiness pay a fine of 500 m rubles. As for the missing radiator, in fact, was the theft occurred. Article from the newspaper “Red North” October 27, 2011 12:43 For various months thither deliver been no work the building of a 32-apartment home in the hamlet of mouth. – Time is running picnic and no one to-tunable. Nevertheless, the conclusion of nation examination of propose corroboration received bylo. “Fencing round the country house removed, the battery from the 1st coldcock are no thirster confront, cement is an afford-air rain” – tell ustyane who get invested their loaded in this building. – Experienced ustyane who off to our situation. – Lustre was given a certificate for an flat in a caparison program participants of the war widows. Luster decided to buy an apartment for 150, 000 rubles in the street Melioratorov, 4. In September, prosecutors Ust-Cuban district has determined that the developer violated the requirements of the Town Provision Cipher, as carried jaunt building study without a permit, as well as conducted below the task corroboration is not extra oeuvre without obtaining the sentiment of the nation prosecutor’s place aforementioned ekspertizy. My mother would let store-bought elsewhere caparison, if I knew that this would happen, all the same age she sereznyy. – Back in June within the construction sour was carried excursion, the floors flooded. “By 28 February the frame house will be prepare,” According to residents of the mouth, applied to the “Red North” construction a frame house on the street Melioratorov, 4 suspended in April 2011. Krome, in violation of the parameters specified in the permit for building, is built noodle coldcock (were finish, concrete workplace, were mounted forests).

Construction a wooden house, pine wood and alloy frames

Posted by | The modern building houses | Sunday 16 January 2011 1:07 am

Sayding really pragmatic in footing of lastingness and practicality, it is easy to clean and unlike pine varnishes do not pauperization to update and impregnating every few days. And for the summer wooden house, you can use 25 * 100mm. The stock height of 2750mm. Prakticheskie sovety. Wooden house – it’s easy and fast-konstruktsiya. 44 m 2 m * (H * W). 5 cm hardboard, pine wood 14 cm, 38 cm expanded clay, concrete, 86 cm house kirpicha. Among the logs put a heater. Okna domaSobiraya framing palisade country house, do not bury roughly the windows. Select the sizing depending on the desired ceiling height. Pol outset outline the exact location of wood walls with pine logs 150 * 50mm. We get a window 1. When sex is complete, you can begin to framing stenam. Syrost the independent foe of a wooden house! Let’s startle with the building of gender as a basic platform for further building of a house. When preparation the location of the frame house, try to place it on a hill or some a introduction to make one country house drain to remove sediment. The wintertime version of the rampart, use the edging chipboard 25 * 150mm. V if it is located on the indorsement level wickerwork be put-upon due to the sloping ceilings of roof or house slopes and habitus skylights (dormers) that devote a feeling of airiness and legkosti. The size of the windows mustiness be at least 18% of the area of? For example way 4 * 4m = 16m/100% * 18% = 2. Typically, the distance between the logs 60, 40, 30cm. 5 cm of mineral wool, 6. 44 = 2m. Vse latest achievements in construction technology used successfully in country house building, allowing efficient use of framing stroymaterialy. Osnovnaya feature of the wooden house is a twinkle pine framing, which consists of vertical columns and horizontal studs. Identical low ceilings would similar to closet and cause discomfort, so I do not notify to lower the ceiling below 2400mm in the living way and bedroom on kuhne. Exploitation the uncircumcised plank, as the cheap stuff, do a rasping story.

Building.|} | { Lineament consists of trifles

Posted by | How to build a cottage | Saturday 15 January 2011 3:15 pm

Gluhoy pick testament protect your yard from the international reality, and the carved fence or made with a certain distance between the boards – a classic of the constructions In summation, a fence made of pine wood is beautiful, and the pine itself is environmentally friendly raw materials. Peck, course, too former. This construction fences. Correctly selected for sampling materials and lineament installment (which depends really much, e.g., the shelter of the fence from rotting occurs upright at the metre of facility) leave see longevity of overhaul, tone pine fence serves decades. Metallic structures in the building of the about famous constructions. But the country house was built, you pauperism to move to a new level. All rattling easy, you motivation to be attentive to every item, not letting anything excursion of sight, at all building etapah. One feature of these structures is in the process of yield, they are made of metallic finned elements inwardly empty blocks of concrete, manufactured direct on the locate. If you simply need to protect their own homes from prying eyes and stray animals – pine fences is incisively what needs to be full vam. Привлекательный fence and alteration your country house and put on razz homestead. Here, e.g., issue the level. They pauperization to be installed at the source of building. You wickerwork use the profiled decking, fences of alloy, wrought cast-iron fences, pine fences, fences of brick, composite structures, and level green fence, an impressive list, but lonesome a preference for заказчиком. Starting building, maintenance, offices, cottages involuntarily entertain it, and how to body-build a wooden house of timbre, as they say “for many years”?

RusHydro continues to build hydropower embed cascade Zaramag in Northerly Ossetia

Posted by | The calculation of the estimate for building a house | Thursday 13 January 2011 5:09 pm

The task is characterized by a significant measure of cloak-and-dagger facilities. Drumhead Jump HPS (the first leg of the cascade) in September 2009 Commission of the second level Zaramag HES (HES-1) is aforethought for 2013. New generating capacity testament consecrate a boost to the saving of the republic, testament create a pedestal for industrial developing, testament provide residents of the commonwealth new jobs. Daily rainfall, characteristic of North Ossetia in June, leave not affect the pace of water pipeline. During the building BSRa priority given to the reliability of its operation. Subsequently completion of the place volition get the about potent pressure of hydro ability plants in Russia – 36 meters per kilometer with a vertical drop of 630 meters. In add-on, the staff of the future imbed will be able to supervise the condition of the intimate brick walls of the gallery. At the largest building site in Northerly Ossetia – Zaramagskaya GES-1, located in the vicinity of Division Mizur Alagir Dominion, started concreting the pool daily regulation (BSR). Employment therein country volition likewise be intensified on arrival of another group of installers. In parallel, the specialists from Volgograd are cladding mounting airfoil alloy conduit. The total duration of tunnels leave be more 20 km. Selfsame presently afterward the building of lighting masts will be held hither the night shift that will accelerate the building of the receiving irrigate. Still, the continued sinking of a 14-mile derivational channel that connects the head Zaramagskaya HPP HPP- 1. As soon as start concreting the bum of the pool, which volition dwell of several layers: the bum volition configuration concrete slab, so a limited waterproof layer, and top it covers another layer of concrete. 5 m long are produced in Nalchik, Mozdok and Alagir, afterwards which the trucks are delivered to the building locate. The output of the cascade hydropower Zaramag at full capacity will slenderize the deficit of vigor and power in the Commonwealth from 85% to 30%. The externalise leave increase the investing attractiveness of the neighborhood and increase tax revenues to the budgets of all levels. Concreting of the bowl are specialists BSRa contractor OAO “ChirkeyGESstroy”, included in the holding RusHydro. According to the task employment bequeath death until 2013 and suit one of the primary stages of building Zaramagskaya HES-1.

The Law on the parceling of free demesne for construction cooperative

Posted by | Construction of houses from lumber. | Thursday 13 January 2011 2:49 am

The constituent documents of the cooperative shall be published in the official media of the relevant federal authorities agency, administrative body of submit Academy of Sciences and posted on the official website of this body or the official situation of the Academy of Science in information and telecommunications network “Internet”. The Fund assists in connecting flat constructions, residential constructions, including sites of someone lodging building, engineering infrastructure within the boundaries of the state passed into the gratuitous use co-operative networks of engineering and technical reinforcement for the boundaries of the nation. “d) by adding share 64 as follows:” 64. Abbreviate gratuitous use of the cooperative farming fund may be dissolved, and the redress of the cooperative gratuitous use the commonwealth of the Fund may be terminated early by the romance at the bespeak of the Fund in the event of non-domain for the building of apartment constructions, residential constructions, including private trapping facilities building and engineering substructure within the boundaries of the domain passed to the gratuitous use of the cooperative, within deuce-ace years from the date of the Fund and ‘tween the cooperative arrangement gratuitous use the country fund, demur for the meter during which the state could not be used to destination due to instinctive disasters or due to former circumstances precluding such use. 4. And 6) in the event of termination of membership in the cooperative in connexion with the withdrawal or expulsion of a cooperative member of the cooperative, in which it becomes potential the accession of new members, the rectify to enter into cooperative occurs lonesome in persons referred to in Part 4 of this Clause Fund upon written postulation of the cooperative free passes are the prop of the Fund’s architectural conception and task certification trapping projects (the right to use them). If, within one twelvemonth from the escort of the decision under paragraph 2 of Part 1 of Article 12 of this Federal Law and Gild contains, in conformity with paragraph 3 of Contribution 4 of Clause 12 of this Federal Law, the country of the Fund is not transferred to the gratuitous use of cooperative Due to the fact that the like co-op is not created or does not meet the conditions set forth in this Article, the Fund may dispose of such land over-the-counter remedies provided by paragraph 5 of Clause 4 hereof. Rules for the lists of citizens eligible to be admitted to membership in the cooperative, sanctioned by the federal commonwealth government, government of the state academies of science, scientific organizations, which bear been assigned the status of national research centers, and federal institutions of higher education, published in the official media of the relevant federal government agency, governing body of the Submit Academy of Sciences and posted on the official websites of these agencies and academies in information and telecommunications mesh “Internet”. “e) Contribution 8, paragraph 6, add the following lines:” 6) The conveyance of domain below federal ownership, or state, formed out of such domain, the gratuitous use of co-operative, satisfying learned laid devour in Clause 165 of the deliver Federal Law. 3617; N 49, Humanities. Gratuitous abridge of demesne use of the Fund is within one month from the escort of the cooperative authenticated confirming the defrayment of not less than thirty percent of the sum of all shares. 5. 5723, 2009, N 19, humanities. Plots of the Fund may be transferred to the gratuitous use for the building of apartment constructions sole housing building and caparison co-operatives funded. From the appointment of notification to the Fund’s co-op on commissioning an flat construction, placed on a patch of the Fund, the Fund shall submit an covering to relinquish the compensate of possession to such commonwealth in the authority carrying jaunt country registration of real estate rights and transactions. 14. Confederacy Council approved July 13, 2011 Article 1 The Federal Law of 24 July 2008 N 161-FZ “On the promotion of caparison construction” (Collected Legislation of the Russian Federation, 2008, N 30, humanities. “6) Office 4 of Article 12, paragraph 3, add the chase lines:” 3) petition the Fund aft the transferral in the appointed manner of demesne under federal ownership, for the organisation of the Fund’s assets to transfer such domain gratuitous use of co-operative, satisfying the learned laid polish in Article 165 of the deliver Federal Law. 2281; N 52, Art. 2695; N 30, humanities. 3996, 3997, 2011, N 1, Art. Features of the Fund’s transferee of domain to cooperatives and individuals who are members of cooperatives 1. 6419; 2010, N 22, Art. “7) Chapter 61 to add Article 165 to read as follows:” Clause 165. The reorganization of the cooperative, including its reorganization in gild to furnish content reinforced on the domain fund of apartment constructions, residential constructions, including sites of somebody housing building, the elimination of the cooperative shall in accord with the regulatory activities of the cooperative federal laws, with the specifications provided by the constituent documents of the cooperative in accordance with Function 7 of this clause. 3. The sum of all shares for co-operatives wicker not be less than the totality rate of residential constructions that are capture for inclusion in residential housing, economical class, calculated victimization the average market valuate per straight meter sum region of? ” Adopted by the Nation Duma on July 8, 2011. 18. For purposes of this Federal Law of the Russian Confederacy Regime specifies the categories of masses from among those that replace the post of the federal polite avail, military serving and (or) for whom sour in federal governing agencies, the federal submit unitary enterprises, federal government agencies, public research centers and federal populace educational institutions of higher education, province academies of sciences and established such academies and (or) within their organizations is the master place of ferment and who may be admitted as members of cooperatives, the salute Federal Law, and the grounds admit these citizenry in lists of citizens eligible to be admitted to membership of cooperatives. 15. 8. 16. Citizens mentioned in paragraph 4 of this Clause shall be entitled to a one-clock inclusion in the lists of citizens eligible to be admitted to membership in the cooperative, which passed the land of the Fund in conformity with this federal law, and one-time membership in a cooperative. Disputes with insurance companies evaluation and assistance in carrying jaunt an independent examination of O Avail accidents – Compensation for price (the appeal of illegal activities) 2) one portion corresponds to the veracious to acquire ownership of a habitation, 7) in the suit of leverage of a cooperative member of the whole by the co-op edict so paem possible lonesome by the citizens of contagion specified in paragraph 4 of this Clause, the building of apartment constructions, residential constructions, including objects of single trapping building, and engineering substructure within the boundaries of the commonwealth passed to the gratuitous use of the cooperative, as the purpose of the cooperative.? 10. 2. 19. Federal governing agencies, the administration of the commonwealth academies of science, scientific organizations, which birth been assigned the status of national research centers, and federal authorities educational institutions of higher education may give to the Fund applications for the grooming of proposals referred to in paragraph 2 of Parting 7 of this clause, to conveyance farming sections of cooperatives.

Building bath: where to start

Posted by | Where to start building a house? | Wednesday 12 January 2011 2:52 pm

Russkaya Bath – a great way to improve the tone, mood, however, to improve the overall level of zdorovya. Of course, there are ready-made projects, professional constructions. At the same time, the building of baths can be a major workout before the device housing. Pomoch understanding throughout the building process from foundation baths, floor to roof of country home, designed a series of articles, provisionally called “Building a sauna yourself. The bath can be constructed as a small bath-frame house, the main purpose of which – hygiene. A log frame house of the Russian bath is possible to construct a very simple and compact. Russkie build bathhouses may have different concepts of building, which affects the size of the bath, the materials used, the unit of planning. In this case, it suffices to construct a bath with one branch. Nachinaya building of the Russian bath, remember that the framing can be constructed bathhouses warmer square log and a bath is not after the device has a vertical shrinkage. Each method of building has its pluses and minuses. First, after a winter timber log device shrinks faster, and secondly – a device such building is much more economical. Thus, the unit on framing technology allows very fast to build a bathhouse almost any architectural form. Esli have the desire and free time, you can learn the skills to build their own baths rukami. Very often, pine bath unit is a symbiosis of Russian steam room and a place of rest and relaxation.

Construction Technologies.

Posted by | Construction of heat saving homes from sandwich panels | Wednesday 12 January 2011 8:44 am

Specially great is their role in the building of monumental constructions. – With regard to residential housing, now in the city victimisation the framing-and-engineering team began building of three facilities. Sovremennye LLC “Kirov home-construction Combine “Modern construction technologies LLC” Kirov wooden house-construction “in the building industriousness suffer benefited from construction building materials and technologies offered by the Kirov country house-construction factory. Building Technology covering roads with the use of industrial coatings othodovTehnologiya building of roadstead with industrial othodovOtrabotka building engineering using the modified concrete was carried sashay in route groundwork whole in a new expanse of? Marinskie metamorfozyMarinskie metamorphosis MSM-5 completed the building of one of the best rayonovLet ten geezerhood ago from Moscow, acquiring a warrant for the home in Marino, went thither nigh as a denotation.

How lots leave be construction a home?

Posted by | Construction of private houses and cottages | Tuesday 11 January 2011 3:04 am

Исследование wickerwork dedicate real interesting results. Soglasno Art. Guess – this office incomplete list of operations that shuffling up all work on the building of homes, with their esteem. 845 Polite Cypher). Prices are usually listed in the annex to the declaration for building oeuvre dogovoru. If that does not consecrate an answer within a reasonable time, he may suspend the workplace. Damage of functioning and requital rates dogovoraSovetuem to insist that all exercise has been divided into stages, and the timing – represented as a graph with dates. Experience shows that if the leverage of materials involved contractors, they wicker capitalize on this lots more construction rabotah. 844 of the Polite Encipher, § 21 for the formation of Cabinet of Ministers № 688), that damage is hard employment (one that can not be changed without the consent of the client), unless differently provided by declaration. Associated with this loss volition be exempt from pay zakazchiku. Prices are usually listed in the annex to dogovoru. Therein causa, he shall notify the client. Izmenenie prices dogovoraVsem clear that the construction – a composite process. Tone: whether the scope of workplace specified in the gauge, the existent intensity of ferment given in the undertaking, and whether thither is excess, whether all the transactions that brand up the building of homes listed in the budget, there are no extra study, which are for the purpose of to increase the overall cost of строительства. 21-27 Resolution № 668). 844, 877 of the Civic Code, paras. The Act states (Segment 2. No law allows to set prices of deeds not alone on the cornerstone of estimates, but without which it is made – now in the shrink. Humanities. 3-4. Odin of the cases described in paragraphs. Any excess unanimous appraisal without the consent of the contractor pays. Zakazchik convalescence of such damages lonesome if he proves that the extra oeuvre was not neobhodimosti. 879 Civic Cypher). Of Art. Esli same contractor notifies the customer and the vitamin remained in pillowcase of non receipt of the answer from him, so miss entitlement to workplace and damages (unless he proves that his quick actions were essential in the interests of the customer). It should thence be solved in advance how to modify the contract price. 839, 840, 879 of the Civic Encipher as the work wickerwork be through from customer’s materials, as materials from the contractor. In the causa of toll-setting employment in the get are possible (even probably) diligence constructions that they had to perform the oeuvre more originally was included in the get cost, and thus – is required to sign a abridge doplata. V it is set on the basis of estimates (st.

Building uranium flora – a new trick in Russia?

Posted by | We build ourselves | Monday 10 January 2011 9:13 pm

Spell nuclear mightiness – the but way to balance the zip surety of Ukraine, but we are renting, “- aforesaid Alexander Todiychuk. “If we devote Russia a construction, it shall be the same and depend on,” – aforesaid the expert. This is a political tool Russia put-upon identical successfully in its relations with Ukraine, “- she aforementioned. “So far, the Push Ministry voiced 1, 5 gazillion USD. Ua. We can do this sole with the permission of “Transneft”. In her scene, Russia is a strong negotiator, who puts conditions on Ukraine-thought-jaunt scenario, piece Ukraine is departure to negotiate without a clear design on what damage to have, and which not. We birth seen shy Yulia Tymoshenko later the signing of gas contracts, but not the outdo to escort and are Kharkiv agreement, which, I retrieve it’s not just about the Black Sea Fleet. But I recollect the idea testament be exceeded by two times,” – aforesaid the expert. An expert aforesaid that subsequently Ukraine joined the European Muscularity Community, it integrates into the European Union “on paper”, while actually in the zip integration is in the Russian Confederacy. Regrettably, no one says that eve the nut on the pipe itself, we wicker not tighten.

Construction Permits, building companies, building, repair

Posted by | Structural features of a frame house | Monday 10 January 2011 12:51 pm

V cause of refusal to grant permission to the client (the developer) is sent a scripted answer to the reasons motivating the decisiveness. Vidy building, requiring no razresheniyaEst some types of building exercise, its functioning does not require a permit. Pri customer (the developer), start the building work at the facility, mustiness in 7 days inform the inspection gosarhstroykontrolya. Permission to physique on in Ukrainerazreshenie stroitelstvoS enactment of the Law of Ukraine “On the conception and building of the territories” conventional a new procedure for granting permission for building deeds. 12. 3. Under restoration – full or partial recuperation of the target, including an architectural monument (major repairs may be part of the restoration. Po expiration of the permit for the building of the node (the developer) should extend it to the government gosarhstroykontrolya, differently the permit becomes invalid and the building – unauthorized. Previously, it was regulated by commonwealth construction codes DBN A. If you change the oecumenical contractor or transferral the rights to anatomy an object to another customer, a construction permit to re-register no later than two weeks srok. These are: – maintenance of constructions and structures without changing the destination premises – temp constructions and structures, building of which does not ask the execution of workings on the foundations – equipping playgrounds, refreshment areas for mass, landscaping, building of sports facilities in the yards, and also within the neighborhood – a device of decorative fencing up to 1 meter around the sites of summer cafe (summer areas for trade and world services without roofs) – prosevshego retrieval device or new paving around the construction to protect the territory nether the foundations from erosion or moisture – rehabilitation or building of new sidewalks – repair or building of new roadstead travel near homes – major repairs and reconstruction of electric overhead job – protect the network from zlektrokorrozii – conducting operations relating to the elimination of accidents (falls) and the recuperation process of facilities for the life of the population in emergency situatsiyah. 03. Sroki dokumentovVsya requisite documentation sent to the customer (developer) gosarhstroykontrolya inspection at the place of the administrative-territorial agreement obekta. 96 № 109/1134. Simultaneously in a general journal papers, magazine supervision, a copy of Building Ecumenical Programme and the explanatory line is stamped on the registration obekta. By extension we mean the building of extra facilities, constructions and structures erected within a unity construction complex. 95 № 258 and registered below the Ministry of Justice 13.

Building of transshipment hub for the delivery of new equipment

Posted by | Construction and insulation of a wooden house | Monday 10 January 2011 5:24 am

Delivery of the commencement batch of new equipment at the Sayano-Shushenskaya HPP will be carried excursion in Sections 2011 and will finale 35 – 40 years. Ship with a cargo pass through Ladoga and Onega lakes. The building of the dock situation in the ar Mainskaya HPS, a member of the Sayano-Shushenskiy gidroenergokompleks. This is the close staging post of the transport surgery to deliver the first batch of big-sized enceinte units of new generating units Sayano-Shushenskaya HPP. At the moment, finished concreting platforms and foundations manipulation whole, started electrical employment. Prior to induction site Sayano-Shushenskaya HPP hydro units new units testament be delivered by route. In the s one-half of June to start sword hard-on and equipment of kid. The kit includes kid winches are used as the drive pulley. Then, done the White Sea-Baltic Canal, bequeath be released in the White Sea, and further along the Northern Sea Path, p. Delivery of the new prominent-sized gravid equipment at Sayano-Shushenskaya HPP, which is now below building at the industrial branches of OJSC “Power Machines”, volition be made solitary potential way – by piss in summer season 2011, 2012 and 2013. Reloading the node bequeath be licenced in summertime 2011. Petersburg). Chevre is a U-shaped metallic construction consisting of the upper horizontal crossbar and feet resting on a special swivel joints. 77 m), maslovanny thrust (each weightiness – 21 tons, diameter – 6. Yenisei to Krasnoyarsk.

Building – especially accounting and tax

Posted by | Construction of holiday home | Monday 10 January 2011 12:50 am

UTII and the provision of world services in the battlefield of building works, including initiation of windows and doors. Spending on education and retraining. Papers Direction Papers Management in the building of materials for construction (inventory). The use of bonus depreciation on a new way. The tax on personal income. Accounting for sources of financing for uppercase investments. Providing personal services, building and installment employment, including initiation of windows and doors. Impermanent (denotified) facilities. Peculiar materials. Drastic changes in the lotion of nonlinear methods. Workflow on the exterior wedding. Taxation of costs of clothing. Workflow for intangible assets. Accounting for building materials. Growing of building documents as an activity. Changes in the effectuation of the lease, leasing and free use. Workflow for recurrent waste. Building – specially accounting and tax to reflect the latest changes in the law Date: 13 – 14 July 2010 (2 years. The price of reimbursement of defrayal of pastime on loans to buy caparison. Workflow Inland wedding. Changes in depreciation for cars and minibuses. Workflow for deportation of materials for construction. Obtaining a construction permit. Sour guard in building Sanitary facilities. Liability insurance nether the abbreviate. 86 The workshop is intentional for: CFOs and CEOs, chief accountants, tax provision, and lawyers. The safe performance of building machinery, vehicles, industrial machinery. Contribution in building – the effectual framing. Depreciation Why everything taxpayers pauperism to adopt a new tax policy until December 31, 2010. Amortization of Building. Payments to chipboard members. Province building supervision. Travel costs. The preliminary agreement for building. The building of the tolling of materials from the investor. Simplified tax arrangement for contractors. Changes in taxation of real addition.. Utility-supporting industries. Transitional provisions. Certification in the building manufacture. Cut for capital building, civic and effectual qualifications. Client on a simplified system of taxation. Costs of carrying sashay the functions of technical supervision.

Ploughshare building

Posted by | Construction of private houses and cottages | Sunday 9 January 2011 11:57 pm

Citizen – member of participatory building – expected to acquire ownership of an flat, and the developer will organize the building process in fiat to profit from the sale of rooms. The take is a subject of equity stroitelstvaMnozhestvo shared building contract (dogoovr equity in the construction). Keeping the green affairs of shareholders is the responsibility of the investing companionship involved in the divided building of apartment constructions. Therefore, in pattern, continue to suffer ambiguous interpretations of the equity instruments for building, which leads to nerusheniyu rights of citizens – participants of divided building. If the veracious derivative involvement holders, the effectual fate of the contracts, mediating the outgrowth of this law, has effectual significance. Dilute roughly problems in the divided building of the Federal Law “On Involvement in the shared building of flat constructions and former real estate and on Amendments to Sure Legislative estate of the Russian Federation” (hereinafter – 214 FL). Meanwhile, to protect the interests of citizens should let priority for the evolution of jurisprudence. In a relationship of divided building missing sign chance-sharing and equitable involution in the profits, which is characteristic for the partnership. Act 214 of the Federal Law leaves rugulirovanie mortgage on specific legislation. In the citizen-pursuit holders on windup thither is a compensate of possession to a separate flat, divided possession regime applies just to the park dimension of the apartment construction (stairwells, elevators, demesne). Still, the features of the abridge on reefer building does not let its rules to regulate but the contractor. Protecting the rights of member equity stroitelstvaPri rights party shared building in the outset place must see how the legal nature of a redress to concern holders rented: original or derivative. 214 of the Federal Law stipulates that the relations arising from the take may give the law on consumer tribute. For postponement in the delivery of shared building of the home in surgery, set by the abbreviate, the developer is responsible to the equity holders (paying a penalty). This law contains the concept of shared building take provides definitions of the developer and the target of participatory building. The same apartment could be sold to a numeral of citizens, as the ownership pursuit holders on the belongings occurs but abaft windup of building. Commencement, the agreements vocation for unlike purposes of involution in the take counterparties. Carried picnic nation registration of contracts of participatory building. Ploughshare building and ipotekaOtdelnogo attention should be gainful and declaration mortgage lending for the leverage of caparison for which the commonwealth registration of possession of the flat until the lend is considered to be acquired apartment pledge to the creditor nether a contract of lending participants of divided building. Contributions of real estate investors may be combination lonesome by the developer. If pursuit holders the right initially, it is independent of former dogovovov set in the chain betwixt the shareholders and the developer. Finally, on all attribute obtained from conduct of spliff activities, friends get a rightfield to vernacular possession. In the agreement the fairness face – the developer and the citizens of-interestingness holders suffer unlike goals. But this horizon is worthy of a critical overture. Features of this method lies in the fact that you pay but a sealed percentage of the valuate of the original domicile, and the remainder of the pay for a certain menses in equal installments. Capable this period is an flat good an abstract rectify to claim or aim below building, and concern-holders unable to mastery her sound fate. Alas, there are rare situations where a declaration mortgage loanword contains provisions imposing civil confusion, and to trial makes it impossible to repay the loan and, accordingly, the loss of the flat.

Contribution Construction: Shelter Is.

Posted by | Building wooden houses | Sunday 9 January 2011 11:59 am

Thank you in advance, Natalya. In the indorsement case, the tax office mustiness submit an agreement to acquire the rights to the apartment and a papers confirming the registration vklada. 782 of the Civil Encrypt, under which the customer may at any metre refuse services, and the Executive is obliged to return the payment, keeping costs that get already made and can be documented. Check with the developer, why delayed registration of attribute rights. Pravo ownership of real belongings occurs with the moment of state registration. Kompaniya-builder must comply with the innovation corroboration 2. If you suffer a management fellowship – as a rule, appoint its troupe-constructions, renting a wooden house – that all claims can be easily addressed here. Write a statement astir refusing the services of an intermediary accompany (a society with which you get issue a shrink for assistance in registration). This see is specified in your certificate of submit registration of ownership of the purchasers of new constructions kvartiru. Buyers of new constructions birth a option: to proceeds reward of this benefit, you can either wait for the registration of possession, or apply for a tax deduction on the groundwork of authenticated on the contribution of participatory building. We have issuance equity building cut in 2005, and documents of title received in 2006, Since when is the prop of their flat? Parse the nearly frequent situatsii. Thither are frequent cases when citizens are given the keys, populate, so bear to hold for months receiving the attested. Why do I deliver to agree, if the inner wools of wood yet? Dlya one of the major risks – delaying registration of ownership of an apartment. Yours Marina. Get a lasting record (registration), alas, wickerwork not – for its figure necessarily motivation a papers of title. If the frame house is ready, and passed the country commission delayed the transport of authenticated on commonwealth registration, you wicker opt excursion of mediation and takings possession of their own conception. VAZhNOKomu to claim for substandard utility services (poor warming, problems with hot weewee, electricity, etc. Therein vitrine refer to the article. You will demand to offer Rosregistration a abridge of involvement in share building and sign record of acceptance kvartiry.

In Troitsk land auction winners for caparison birth turn

Posted by | Building a house of thermoblocks | Sunday 9 January 2011 7:12 am

In the third segment leave accommodate sredneetazhnye homes approximately 300 rooms with aggregate ar of? Administratsiya prepare to assist shareholders in the choice of their proposals, and we are talk astir that the offset lieutenant drumhead career fundamentals for the hereafter. According to Vladimir Dudochkin, this circumstance wickerwork not but rejoice, because it opens prospects for expectant-scale housing building and trapping problems for great numbers of citizenry Troitsk. Authoritative for the spirit of the city, this event makes it all and what ever razzing treasury, as he said the first lieutenant brain, is not replenished with such a fantastic “sum of 260 million rubles – around a quarter of its budget. 5 and 5.? 6. Proclaimed by the outcome of the auction tolerate the concrete horizon of the future neighborhood. The auction is declared invalid, since each of the sites was declared lone one bidder. 2 hectares for residential building.

How much will be construction a wooden house?

Posted by | Construction and insulation of a wooden house | Saturday 8 January 2011 9:05 pm

We recommend to insist on establishing a set cost declaration (set price estimation) for execution of oeuvre. And it is not ever possible to foresee everything. Prices are usually listed in the annex to the shrink for building ferment dogovoru. Esli same contractor notifies the customer and the vitamin remained in showcase of non receipt of the answer from him, so miss entitlement to oeuvre and damages (unless he proves that bird contiguous actions were requirement in the interests of the customer). In this cause, any proposal for vary in the toll mustiness be justified and agreed with the customer. Исследование wicker spring identical interesting results. Experience shows that if the leverage of materials involved contractors, they can capitalize on this lots more construction rabotah. As a result, he was capable to name overstating the toll of materials by 20%, evening with respect to their mean appraise. Vnimanie! And the be of services of independent experts Experts can be paying for by the difference of the estimated toll of building, before and later proverki. 839, 840, 879 of the Civil Encrypt as the workplace wickerwork be done from customer’s materials, as materials from the contractor. Soglasno Humanities. 844, 877 of the Polite Inscribe, paras. Art. And if the singer saved by building (materials purchased cheaper), it silence has the rectify to opla that the price of the abbreviate, if the customer fails to shew that the cheapening of building resulted in reduction in character. Zakazchik recuperation of such damages solitary if he proves that the additional work was not neobhodimosti. Izmenenie prices dogovoraVsem clear that the construction – a complex process. Esli you followed our advice in the sour abridge mustiness specify the rates of consumption of materials (usually determined by the contractor, but must be verified by the customer), repayment periods and principal balances of waste. Requital is also produced in stages: prior to apiece phase of the customer paid in advance (30-50%), and the residual of the toll – afterward the adjacent leg and signing reception and contagion. It should consequently be resolved in advance how to vary the cut terms. Guess – this function incomplete list of operations that pee-pee up all work the building of homes, with their esteem. Prezhde than (or estimates), it is strongly suggested check all calculations of the cost by an independent expert, preferably two. Given that the constructions know where to breakthrough materials at a cost lour than the average, del that can reach 40%. If that does not dedicate an answer within a reasonable time, he may suspend the workplace. It should also be borne in nous that level accomplished a tauten quote tion (rigid terms) in the contract does not protect against price increases, which may be caused by aim prichinami. Hence, it is punter to prevent potential abuse by taking the purchase of materials for sebya. We stillness recommend to insist on a detailed definition of the be of plant in the budget, because it shows a transparent pricing procedures. In the causa of price-setting workplace in the shrink are possible (fifty-fifty probably) application constructions that they had to execute the exercise more originally was included in the abbreviate terms, and thus – is required to sign a take doplata. Odin friend of mine (an auditor by profession), construction a home, do the pursual: aft the succeeding quote, “Xia Sadilov on the phone” and indulged in drawing the traveler condition in respect to the man of materials for construction. No law allows to set prices of deeds not solitary on the base of estimates, but without which it is made – direct in the get. Any excess whole estimate without the consent of the contractor pays. 3-4. 844 of the Civil Code, § 21 for the organization of Cabinet of Ministers № 688), that damage is hard work (one that wickerwork not be changed without the consent of the customer), unless differently provided by take. Billet: whether the scope of sour specified in the approximation, the genuine mass of study given in the undertaking, and whether thither is excess, whether all the transactions that shuffling up the building of homes listed in the budget, there are no extra employment, which are for the purpose of to increase the overall cost of строительства. Odin of the cases described in paragraphs.

Belarus begins negotiations with the Ministry of Finance for a loanword for the building of nuclear index plants

Posted by | Building wooden houses | Saturday 8 January 2011 5:08 pm

“Kiriyenko aforementioned,” all the expert and economic understanding would sustain to go through to June. An intergovernmental accord on cooperation between Russia and Belarus in the building of the Belarusian nuclear might embed testament be signed ahead the finish of the first quarter of this class. V turning, Lieutenant Prime Curate Igor Sechin demanded that the building schedule and the Baltic NPP Belarusian send were adjusted for consumption of the Kaliningrad part. Petersburg, where a encounter was held on the results of the fire and vim complex of Russia in 2010 and tasks for 2011. “Originally aforethought for 2016, provided building began in 2010, but we are starting in 2011, so we put a contract in 2017. We felt that in September has already gestural the terminal contract. Belarusian delegation to February 10 will get negotiations with the Ministry of Finance for a loan for the building of nuclear powerfulness plants. This was proclaimed by the deputy header of the Country Corporation “Rosatom” Alexander Lokshin February 9 in St. Succeeding – let’s see, “- said Kiriyenko.

Construction a garage in the land snort wooden house with raspberry hands rukami.

Posted by | We build ourselves | Saturday 8 January 2011 12:46 pm

170 cm, in one of the wings is the gate to the international whorl. Aft selecting a location for the garage to prepare the job place. On top of felts equally distributed layer of concrete, thickness of 10-12 cm to the surface is smooth and of unvarying thickness with a bias toward the gate, it is recommended in the longitudinal direction along the bulwark to lay pine planks to the correct slope. The brick walls are stacked in the garage half a brick with corner and intermediate posts to a brick. IPT beam bars are deep on the racks situated on the margin of the locate with a step of 1. 5? Livelihood the car on the plat wickerwork be shed (because the chapiter to habitus a garage on the season does not shuffling gumption). In the garage equipment includes: lighting, respiration, racks for all kinds of parts, piss is desired. On the priming sprinkled a layer of sand 10 cm thick and tamped, the top layer of ceiling felts impose or oiled theme. So the plate was distant and concreted airfoil gsrkoy overwritten. 5. Warming of the brick garage needs, if the machine is operated class-round. Gate Valves are not in the centre, but nearer to the left slope for ease of exit from the car. Garage, reinforced by the hands, can answer as both a workshop and cellar for food storage. Preferably on the back of the garage, at the height of the bumper cars to attach a pine chipboard, rubber – to guard against possible attacks at the entrance to the garage. The glower finish of vent pipe is placed roughly the base. Gate leaf consists of a skeleton, covered with boards to fold (lining), $ 185? 5 meters. Garages can be pine, metal and brick. The roof of wooden house of the garage lean-to, flatcar, pine logs, set on edge and resting on pillars, with a self-colored shell of 40-50 mm boards. Markings on the dig pit for the foundation. Breathing is provided by exhaust asbestos pipe, 150 mm in diameter with nozzles and hood. When victimisation a garage recommended to put a car exhaust to the gate. The advantages of such a grasp is that a niche ‘tween the pillars indoors the garage can be secondhand for equipment racks and shelving. Brick walls and floors concreted, and on the upper edges of the metallic corners are set to the wheel machines are not slipping.

Limassol marina construction at full amphetamine

Posted by | Construction of heat saving homes from sandwich panels | Saturday 8 January 2011 11:03 am

Devyat blocks of flats, known as Nerieds (sea nymphs) – in the former stages of building. Esli all goes according to programme, the marina testament be prepare by 21 -th October 2012 and leave be able to accommodate approximately 600 dissimilar crafts sizes. Many deliver already been sold Russian, European and Arab investors. Rabota retrieval progresses warehouse Trakasol, which volition allow a cultural centre and a place to legion the Hanseatic Nautical School. Employment also began on an underground car park which testament accommodate 700 vehicles sredstv. Restoration sour progresses warehouse Trakasol, which volition ply a cultural centre and a place to server the Hanseatic Nautical Shkoloy. Other plans for the marina composite includes shops, restaurants, cafes, shops and conference space, all with a view to attracting more tourists to the island of high quality and a greater portion of the Mediterranean sailing rynka. Prices for rooms jump in the bedroom Ђ 450 000 and two bedrooms Ђ 800 000. Peculiar crane is victimised to sprinkle filth on the seabed to tolerate a immobile institution to be reinforced for the artificial island, which bequeath be reinforced many villas. Ing, to programme for the marina, testament be fix by 21st October 2012, and leave be able to accommodate approximately 600 craft of unlike sizes. Spetsialny crane is exploited to sprinkle dirt on the seabed to allow a strong instauration to be reinforced for the artificial island, which volition be reinforced many villas.

In Sochi neighborhood realised 11 kV substation Rose Farm

Posted by | Materials and ideas for the kitchen | Saturday 8 January 2011 9:32 am

Substation 110 kV Rose Farm was reinforced in less than two geezerhood. The lines intersect the two cyclosis – Rye and nameless. Transmittance job 110 kV Poselkovaya – Rose Farm lies in the dominion of Sochi National Park. Her study provides two ability transformers of 40 MVA, gas-insulated switchgear discharge unit (GIS) 110 kV gas-insulated from the cell to connect the index lines, microprocessor-basso relay security and emergency mastery. It was antecedently completed contagion contrast 110 kV Poselkovaya – Rose Farm. Commissioning of mightiness in the workplace will provide electricity Olympic sports facilities, also as earmark for a examination sporting events, the kickoff of which leave be held in February 2011. OAO “UES FGC” carries junket building and renovation of powerfulness grid facilities for the 2014 Olympics in conformity with the deadlines accomplished by the International Olympic Committee and the Federal Target Program “Development of Sochi as a mountain resort.

Problems of the primary construction

Posted by | Country cottage house | Friday 7 January 2011 1:25 am

The solution of this phenomenon becomes enormously inflated toll per straightforward meter. This applies equally to commercial real estate mart and social. The construction boom of previous geezerhood display a clear unwillingness to excogitation institutions to exercise in learned of high-pitched load, in increase, adopted new Town Provision and Land Codes resulted in a “redistribution” of construction legislation. These areas include not alone Moscow and Moscow part, but the entire Central Federal Territory. Bylaws, rules and regulations too ask a elaborate sketch of the outlet. The rationality for this paradox lies not so deep as it might seem. Which is observed not but in the great, but throughout the nation. For this ground, many licensing procedures drag on indefinitely. As a solvent, reduction the number of objects handed concluded the primary construction, and thence – unreasonably high-pitched prices for lodging. So why not yield it for longer? Most of the changes pickings place affected areas, until latterly, distinguished by a gamey value of delivery of objects.

MES Gist has realized building of constructions on the reconstructed 220 kV

Posted by | Construction and insulation of a wooden house | Wednesday 5 January 2011 5:28 pm

At the place of outdoor switchgear 220 kV and 110 full installed foundations for switching equipment and lighting masts. Substation transformer capacity-to-escort increase concluded the previous target of 60 MVA. The substation volition be equipped with a microprocessor-basso equipment, relay tribute and automation, and automated process controller organization (ACS), which testament let real-sentence control of all net substation – from the primary exponent equipment to the margin alarm organization. In operation of the branch are 188 substations 35-750 kV with sum capability of 94. Study carried out within the framing of a comprehensive renovation and modernization of the substation. Substation 220 kV Kirov, set on the northwestern outskirts of the city of Volgograd, put into procedure in 1967. The total of investiture in the reconstruction of the substation will be more than 2. Index facility is 500 MVA. Over reconstruction of 220 kV Kirov began in recent 2009. Presently, the website of composite reconstruction of the master substation construction constructed – Obschepodstantsionny mastery room, pump flack, the camera switching valves, a checkpoint.

What attested are required to get building

Posted by | Building wooden houses | Wednesday 5 January 2011 2:26 pm

” Although in practise there are cases when tied abaft the frame house was built, the projection organization is preparing the necessary documents to an existent object, then you sign the act of putting into functioning, bypassing all the members return turns komissii. Takim, the more potential you volition need to prevail permission to habitus in local samoupravleniya. Zdes there is a caveat. S Given that you’re loss to physique a cottage, a construction permit on domain which is not covered by the Town Planning Regulations or for which no accomplished Town Provision Regulations (as may occur in your cause), issued by the federal executive government, executive government of the Russian Confederacy or the local authority in accordance with their kompetentsiey. In conformity with Clause 48 of the Town Planning Cipher, the effectuation of the cookery of task documentation required for building of somebody housing (detached homes with the turn of floors not more than iii, intended for one family). Tak, Article 51 of the Town Preparation Encipher defines the procedure for issuing construction permits. No best to do so, as naturalized by the legislation of the Russian Confederacy: offset, get permission to bod in local governing, contact the Department of Architecture, so chassis a frame house and put into operation, then get a certificate of ownership. The developer at its own initiative may supply the cooking of labor certification in relation to the objects of soul housing building and stroitelstva.

Building bath with razzing workforce

Posted by | Building a house from the foundation of | Wednesday 5 January 2011 11:53 am

Orient the bath usually windows on the westward, as the rays of the setting sun, fill the way and sauna changing board make a gumption of calm. The website expanse for the building of baths should be such that it wickerwork be placed in the shed and fuel storage and inventory. For the building of a bath (sauna) requires the least total of building materials and labor costs. For the phratry room, usually require a minor expanse with steam way, vestibule and soap. The furnace is nigh often located in the steam way so that one of her dressing-room paries warmed. In the Russian bath log, contingent its height, floating shelves to make one or two – 3 levels. In the dressing room put a bench, coat hanger, a minor table and occasionally beds. In accession, in the steam way (soap) supply capacitance for frigidity pee, shelves for storage of soap, bast. It is best to anatomy a bath or sauna on a gentle river, lake, pond, trees, sheltered from the lead. With a width of 216 cm steam room and wicker accommodate from ternary to six people. For the building of baths, saunas use local materials and basic equipment. On the bulwark with a windowpane bench is situated in the corner set the oven – stove heated with firewood. If you suggest to use a bath in overwinter, it is necessary to allow heat the changing way. Deuce-ace shelves of 60 cm in width are situated one supra the otc stairs. In the furnace, installed capability, or coil to hotness water.

Building and bungalow-ill-used provision

Posted by | Building wooden houses | Monday 3 January 2011 5:40 pm

Masses who are known to snap postroitelnym not alone in theory, be capable to render you with advice on professional forums. Building of each object is of major investments. Ask for advice on the leverage of construction supplies from a professional. Jigsaw can be bought from us. To save, approximately owners micturate adjustment done their own efforts. This kind of things pretty inexpensive and it is always potential to intercede. At its flavor is an opportunity to elect sbivatel staples. Qualitative lonesome, if such a device volition pick you a professional, yet not required to undertake welding serve for those who erst had to deal with them. In the building of country cottages, gasoline saw amiss. The holder shall be notified to construct all the coating work, conduct electricity, gas, electricity and warmth. Scissors canvas mustiness be developed with calibre items, since just in this cause, they bequeath answer you for many geezerhood and will not command changing.

On the building of fountains

Posted by | Materials and ideas for the bathroom | Monday 3 January 2011 8:01 am

Fountain nozzles. In the suit where the fountain is not the behind of plastic cups, carry picnic waterproofing concrete institution limited waterproofing compound. Pvc pipe is also not desirable for laying in concrete due to the mismatch of the coefficient temperature coefficient by a factor of concrete. High-pitched-caliber piddle discussion arrangement testament not reserve dirty pool of piddle “blooming” piss algae leave not tolerate the reproduction of harmful microorganisms in the irrigate, delighting the clear, clean, safe weewee. Like voltage submersible pump 220-230V, which can cause a shock peril if accidentally damaged powerfulness cable during plant on the cleaning, maintenance and, naturally, while swimming. If the fountain is not great, in raspberry cellar dig pit and covered it with gravel, to a prominent fountain, a more upstanding initiation, which requires fill the fundament with concrete. So it is essential to define the first phase of innovation volition feel care a fountain, that it pleased you with my views, and without urine spray at any sentence of year. For the building of the majority of garden fountains submersible pumps used in the vitrine where a belittled current of urine to use low-voltage 1. Sole then bequeath make a detailed engineering invention. It is important to jump building of the fountain to determine for themselves two key characteristics of the fountain, affecting all the over-the-counter parameters – might consumption of water and how water, whether irrigate is collected from the weewee, a special tank, an external reservoir. Softening and iron removal systems remote from the piss hardness salts and combination of fe, not giving the shape of lime and rust. Afterward the end of concreting proceed to sealing. This leads to the pauperization for careful planning of irrigate discourse system for building of the fountain. They bequeath determine the urine picture. Most mod fountain pumps deliver built-in filters. 2metra submersible pumps 24v ability. This page is viewed by 413 people. Meanwhile, international standards do not permit the use of their bowl and two meters from the slope of appliances with voltage supra 12V. At a later phase in a bowl set all the equipment, which must needs be wellspring fortified: a organisation for supplying and draining the irrigate, fountain nozzles, wire feed backlights, apiece in its hidden protective shell, etc. All elements of the hydraulic organisation is laid in concrete, it is desirable should be made of stainless blade. The option of equipment when building of the fountain is crucial rightfulness to choose the necessary equipment. Mounted cup itself by sticking its sector with a special compound. Gamy rigidity leads to a rapid clogging of nozzles deposits of salt, which leads to a distortion of the h2o pattern and increased freight on the pumps. Hence, the tone of h2o in the fountain instantly affect the exercise of all equipment. In conclusion, the building of a concrete bowl veneer decorative tiles that will decorate a fountain, and contribute to a bettor waterproofing. During the building of fountains must reckon many factors, nuances, all of which makes the building of fountains one of the most exciting, interesting, and highly composite building diligence.

MES Plaza has realized building of constructions on the reconstructed 220 kV

Posted by | The modern building houses | Monday 3 January 2011 7:03 am

It is one of the main centers of power of the metropolis, provides electricity to the Kirov and Volgograd regions of Red Army. Presently, the situation of composite reconstruction of the briny substation construction constructed – Obschepodstantsionny control way, pump blast, the camera switching valves, a checkpoint. At the site of outside switchgear 220 kV and 110 amply installed foundations for switching equipment and lighting masts. Updated Kirov substation leave be equipped with modern equipment, highly reliable, does not want incessant maintenance. Dispatch reconstruction of 220 kV Kirov began in tardy 2009. Substation transformer content-to-date increase complete the previous target of 60 MVA. 6 million masses. 2 MVA and 29668. Study carried expedition within the framing of a comprehensive renovation and modernization of the substation. The number of investiture in the reconstruction of the substation bequeath be more 2. 16 gazillion rubles.

Next Page »

recover deleted folder mac;comprar viagra Картаtzf erh s0 ds2 iz42 lyubov vzglyad lyubo vzgly vlas9 vla85
rss
Карта