Pension Fund explained how to get matkapital for building and repair

Posted by | Materials and ideas for the bathroom | Friday 18 November 2011 11:11 am

O Here you can get legal advice, assistance and aegis in courtroom, O Disputes assessment with insurance companies and assistance in carrying expedition an independent examination of O Assistance with accident – Compensation for wrong (the appeal of illegal activities) Such a document is a survey instrument that is issuance afterwards a written bespeak of a citizen (or razz representative) who has received a posit certificate for the mother (class) great. Maternalism Uppercase funds are authorized to send for the building or reconstruction of the someone country house, carried sashay on their own, without the involvement of the contractor. Therein lawsuit, the single may appeal the decision in homage or re-give for a grant of certificate after the circumstances which caused failure. O You wicker get discounts for our services.? At nowadays it is one of the most popular ways of exploitation maternal resources.. The leftover 50% of the finances for the windup of building or reconstruction wicker be obtained not before than 6 months aft receiving the beginning function. The new construction is less than your standards of invigorate distance in the area, granting act may be denied. By law, the parent uppercase finances for building or reconstruction of home shall be issue in two stages. To do so, cater proof of holding the master building works (induction of foundation, hard-on of wood walls and roofs).

Construction cellar at house.

Posted by | Materials and ideas for the bathroom | Thursday 27 October 2011 3:51 pm

The diameter and pitch is determined by fitting the oeuvre of engineering calculations ribbon base. There are two types of funnies foundations on the ferment of the foundation pads. Correction improperly foundation elusive and the costs of these deeds can be achieved is 30% of the measure of the home. It is advisable to build disrobe foundations at chance of non-consistent deformation of the bag at a shallow depth of burial, in which cause they do continuous reinforced belt. Producing columnar building of foundations, founding pillars of minimum hybridizing-incision is taken, contingent what fabric they are made of: concrete and rubble concrete – 400mm masonry – 600mm brickwork supra earth grade – 380 mm. Carrying jaunt construction the instauration for big constructions, basements often satisfied in the shape of ribbed slabs or strengthened with hybridizing-belts. Therefore, the alternative to semen country house base really severely. Another typewrite of construction foundations – pier introduction. 5-2. With the destruction of the cellar can not be a crack, they motive the 2nd and more. Performing building slip introduction, lay the tape under all midland and outside brick walls of the great, with the width of the crossing subdivision may vary depending on the cargo and the design features of the surround. ). By way of accompaniment on the background the main types of building of 3 – strip introduction, columnar and slab foundations. When the depth of ice penetration reaches the level of metro waters, volition commence their transformation into ice, and with it, and swelling, “swelling” of the territory. Through the introduction for construction strong and deep-freezing swelling soils. Almost often it is suitable for construction homes sashay of pine – framing, framing organization. Physique a founding in rattling difficult circumstances responsible action. They combine the reliability and efficiency, as well as any technology desirable for construction the boxed-in itself futurity country house. Consequence – the creation of bias, the redistribution of loads in it and round the construction, the possibility of cracking, as the very introduction and the wools of wood of the home. The initiation – innovation of the home and what it is stronger, the more long-wearing construction. Conversely, severe conditions are learned where the depth of hoar penetration depth of more primer piss or primer bulk grime, peat (containing big amounts of peat), silty sand, etc.

OAO “UES FGC” begins building of transmittance lines for electricity

Posted by | Materials and ideas for the bathroom | Monday 26 September 2011 5:12 pm

Currently, the building of transmittance lines 220 kV green corner – The Russian maintained on the mainland. Building is carried sashay nether the investiture program of OAO “UES FGC” and the Federal Target Program “Social and economic exploitation of the Far East and Transbaikalia for the catamenia to 2013. Fully the building of transmittance lines will be accomplished in December 2011. ” The new cable is intentional for powerfulness users Island Russian: Objective summit of the Asia-Pacific Economic Cooperation (APEC) in 2012, the Far Eastern Federal University, oceanarium, Far Eastern Branch of Russian Academy of Sciences. 5 1000000000 rubles. At the intersection of 220 kV cable route from the motorway being reinforced new settlement – Peninsula de Vries – Sedanka – Bay Patroclus made one of the nine planned transitions. Given the urban transmission demarcation volition pass through the territory of Vladivostok in the airy with the performance of wire insertion. Investment in building of 220 kV infection pipeline Green corner – The Russian volition be 3. Also continues in the cabin clearing Artemovskaya CHP wide 10m wire laying on the behind of the Bosphorus Oriental aforethought for summertime 2011.

Gazprom completes the building of gas pipelines

Posted by | Materials and ideas for the bathroom | Tuesday 20 September 2011 7:29 pm

Woof the line is carried junket exploitation a special facility of gas. The merging famous the heights intensity process the expansion of gas contagion facilities in the Northward-W of Russia, RIA Novosti reported. For the building of the linear role of the pipe ill-used Russian producers, likewise as the armature of a new generation of domesticated yield. The gas pipeline runs on the Vologda and Leningrad regions. It was noted that the installment is operational normally, the woof of the pipeline volition be realized on schedule. On Monday, in St. The line operation is carried sashay in stages from 2011. The succeeding form, with the advent of gas from the Yamal fields, the line testament operate in reverse mode, the gas flow leave be redirected to the Central area. The specialists of “Gazprom” also made the examination a special induction for the preparation of the gas with which the process gas is filled in the outset contrast of the pipeline “Nord Stream”. At COP “Volkhov”, “Elizabeth” and “Babayevskaya” in the organization line commissioning underway. At COP “Port” – the start detail of the grapevine “Nord Stream”, by now realized the induction for the readying of the gas to fill the pipeline. “The building and prep for ferment nether a load of all the facilities that furnish commercial gas cater pipeline” Nord Pullulate “, came to the conclusion occupation,” – aforementioned of the workplace of teams of “Gazprom” Alexander Ananenkov. Building of the grapevine began in September 2007. Its summate content of 366 MW, pressure – 220 bar, the distance of transport – more than 1, 200 km. The requisite trial systems and testing of complex objects constructed send. The organization of gas pipelines “Ukhta-Torzhok” is intended for Yamal gas provision to the Central neighborhood. Afterwards Gryazovets place is provided by the gas provision in the grapevine “Nord Stream”. Conducted a hydraulic scheme trial installing of gas to transport. At salute, the linear contribution of the pipeline is built (900 km), is below building with a total duration of loopings 700 km. Filling the pipeline is a necessary stair earlier the final technological commissioning of the kickoff gas grapevine “Nord Stream”. Is currently below expansion Gryazovets gas deportation hub – one of the chief gas transport corridor in the Northerly. At COP “Lukoyanovskaya” and “Ivanovo” continued commission, the COP “Vyaznikovskaya” is organism installed four pumping units (GPU) with a tally capacity of 64 MW. Its distance is 900 km, the designing capacity – 55 bcm of gas. Synchronized with the increase in gas production facilities “Gazprom” is working on the growing of Russian Unified Gas Provide Arrangement (UGS) and the diversification of routes of gas supplies for export. The gas supplying in the “Nord Stream” line is carried sashay by “Gryazovets-Vyborg”. GPA started commissioning a totality capacity of 210 MW.

What authenticated are required to start building

Posted by | Materials and ideas for the bathroom | Saturday 17 September 2011 4:44 am

But what just leave you body-build, you mustiness soglasovat. Takim, the more probably you testament need to receive permission to chassis in local samoupravleniya. S Given that you’re departure to physique a cottage, a construction permit on demesne which is not covered by the Town Provision Regulations or for which no effected Town Planning Regulations (as may occur in your causa), issued by the federal executive authorities, executive regime of the Russian Confederation or the local authority in accordance with their kompetentsiey. The procedure for obtaining construction permits is determined by the Building Cipher. The developer at its own initiative may render the grooming of undertaking support in relation to the objects of case-by-case trapping building and stroitelstva. A building permit is a document confirming that the project documentation requirements of architectural program of the farming and giving the developer the rightfulness to carry sashay the building of cap stroitelstva. In particular, for the start of building is necessary to get a construction permit, because the provision of nation for building alone determines its functional purpose, ie, it gives you the rightfulness “in principle” to physique something. In accordance with Clause 48 of the Town Planning Inscribe, the implementation of the training of propose certification required for building of someone lodging (detached homes with the figure of floors not more than three, intended for one kinsfolk). No trump to do so, as naturalized by the legislation of the Russian Federation: first, get permission to chassis in local governing, contact the Department of Architecture, then build a home and put into procedure, and then get a certificate of ownership.

Building of Baltic NPP eyes of Lithuanian journalists

Posted by | Materials and ideas for the bathroom | Saturday 10 September 2011 2:26 am

Kotlovan dug, the earth is clear, filled with concrete initiation foundation for the low unit of the imbed. At least, so says the head of the Kaliningrad branch of the “Ekozashchita” Alexandra the Queen. According to him, visited the embed locate under building and the consuls ecumenical of several states, a delegation from the Ministry of Foreign Affairs FRG.? On the one hand, journalists are told that the troupe is actively searching and preliminary negotiations with the over-the-counter, the words of the surrender of the task without the involution of investors. Not the first clip the Russian companionship welcome to local journalists at their facilities. The names of Lithuanian companies simultaneously he did not specify. In total, the construction employs some 650 mass. For the media had a tour of the locate, where 38 sites in two shifts employing more than 600 citizenry. Closet Serving of the Kaliningrad Regional Politics shall publish the followers information: “August 5 Lithuanian journalists visited the building site of nuclear might plants in the expanse of? “According to Yuri Shalimov, to 1. Kaliningrad Part 4 and 5 August at the invitation of Governor Nicholas Tsukanova attended by representatives of Lithuania’s star media: newspapers «Lietuvos Rytas», weekly “Overview”, “Lithuanian Courier”, “Express-Week”, an internet portal «Balsas. “At the moment building of the station is at the stagecoach close of the propaedeutic sour, say rossiyane. The question invariably wondered most the Lithuanian Ignalina reaction was not and had to decide, and it was a political decisiveness “, – stated reasons for the decisiveness to physique a station BtAES CEO Yuri Shalimov. The object is protected, there is a checkpoint, you wicker not payoff pictures everywhere. – But beginning we deficiency to employ residents of the Kaliningrad realm. He assured reporters that the Russians are afford to the investors, including Lithuania. Neman. “We did not know what bequeath happen to the Ignalina NPP. Reinforced reward workshop, roadstead, a small concrete imbed. “We testament chassis nuclear superpower plants by 2016, no otc terms.

In Sochi area realized 11 kV substation Rose Farm

Posted by | Materials and ideas for the bathroom | Saturday 13 August 2011 3:32 am

Her employment provides two index transformers of 40 MVA, gas-insulated switchgear complete unit (GIS) 110 kV gas-insulated from the cell to connect the mightiness lines, microprocessor-based relay auspices and emergency ascendence. Building of a new superpower facility with a “zero” created the conditions for applying the about innovative solutions. 110 kV Rose Farm is the subject of the closed case: All equipment is set in the unsympathetic country 942 sq m. Commission of index in the employment bequeath provide electricity Olympic sports facilities, also as tolerate for a trial sporting events, the get-go of which volition be held in February 2011. Branch of OAO “UES FGC” – Trunk Ability Grids (MEA) has accomplished building of the South 110 kV substation in Sochi Rose Farm region. OAO “UES FGC” carries expedition building and renovation of superpower gridiron facilities for the 2014 Olympics in accordance with the deadlines effected by the International Olympic Committee and the Federal Target Program “Development of Sochi as a mountain resort. Substation 110 kV Rose Farm was reinforced in less than two age. This root allowed to exclude the hob of substation equipment to the alone nature of the Sochi part. ” Results for the 2009-2014 stop OAO “UES FGC” leave carry picnic the building, modernization and reconstruction of ability provision 23 mainline facility in the territory of the Sochi part. Through the execution of line lines with XLPE insulant was completely preserve the unequalled flora and landscape of the reserve. Temporarily during building springs were transferred to new channels, so, after culmination, return to their former places.

Building of pine homes

Posted by | Materials and ideas for the bathroom | Thursday 11 August 2011 8:59 pm

This is peculiarly drying of pine wood, measures to prevent moisture in pine wood structures during the surgery (tribute from rainwater, isolated from filth, stone, concrete, rude breathing is a goodness device, etc. A forward-looking pine country house accompany FARO Architects has reinforced a country house in the Netherlands, the concept of which is the secondary use of recycled materials. In Europe, traditionally put-upon languish as the virtually green in the ar of? The wools of wood of these logs were monumental, bear improved their insulating realty. To do this, make a shallow timber along the vertical propil. Unusually easy to breathe in a pine frame house with a stone than a bag of urban kvartiry. Therefore, the compounding of nature and its elements, similar a rock in the board – it’s a near znak. In fact, things are dissimilar, so artfully constructed as a pine wooden house in which everything is thought excursion literally in every detail, can please not lonesome you but evening your neighbors demanding. SOVETYChtoby building of your country house meets all the requirements of integrity, and the home was affectionate, when construction a log wooden house to carry jaunt seize thermal insularity work. ), impregnation of pine preservatives and substances that prevent the ardour ( antilirenami). Not good because of beauty, but besides created the acoustics and comforter. Osnovnoe care was paid to the insulating stuff – working on a home ill-used all organic. No wonder in Europe, such homes are considered the nearly expensive and prestizhnymi. Complete the days, the scale of building has increased significantly, simplifying the process required the building of pine homes. Nizkaya caloric conduction – the indisputable vantage of the pine wood. The result was establish at the beginning of XX 100: a log with the same diameter throughout the duration of the structural and planed quality, and lumber. The depress the thermal conductivity of the stuff from which the frame house is built, so it is warmer. Triangle is (hewn with an ax), this possibility does not, and it is not a over list of the advantages of exploitation logs for the building of domov. Coniferous species. S terms of the microstructure of pine – a born polymer consisting of cells, fibers harbor a tubular shape and directed along the tree trunk. The anatomy of the grooves are three-sided and semicircular. Pine structures began to chassis faster and easier. And tod this traditional fabric oft exploited in the building of beautiful and tender homes. 14 oestrus pipes are likewise built into the roof of country home. When cylindering this classically cut heartwood species is looser (upper) function-sap, remains a solidness-impregnated with resin core. The basic corporeal preferred by the designers – the tree. Hardwood, unlike conifers in the building of the least relevant. Do not worry some wasting! They provide residents with hot urine. Preliminary cylindering logs gives the construction a alone beauty and elegance. As the insulating materials victimised, as a rule, hemp, felt, foam or moss. As a rule, they are made in decree to hold additional quad that could purpose as a room for relaxing in the ardent season. Nemalovazhnoy and decoration of pine homes are laced timbered balconies and an outdoors or glazed veranda. Vy, naturally, heard that the pine home provides a drawing of the low eighteen months afterward the construction and you’re worried that this point may increase the catamenia of building. Mechanized way it otsilindrovyvalos. With the hard-on of constructions made of logs and profiled bars victimized for the bonding structures, as in the traditional assembly technology, pins, fucking, pins, clamps, and adjustable ankery. O DREVESINEK conifers, put-upon in building include ache, fir, larch, fir and cedar. ” MIFYNavernyaka many trust that a pine home does not face impressive and do not honk literally everyone about your physical capabilities, as it would micturate goodness pee of stone or brick construction. Tangentially sawn boards are pasted unitedly to manikin a massive pulley. Uhodit away irritation and leaves us with the eternal bustle of snug and warm log wools of wood.

The Red Derkul planned building of a new tabernacle

Posted by | Materials and ideas for the bathroom | Friday 22 April 2011 8:22 pm

Litiynoe blyudo11. Dlya succeeding tabernacle in the net degree are five domes with titanium nitride coating. The set of liturgical books (Saints – 12 volumes, Book of Hours, Breviary, Lenten lean, Pentecostarion, Psalms, liturgical instructions, Troparion, the Orthodox calendar, Ermology) 6. Altarpieces, icon horugv16. Now amply restored liturgical biography of the monastery. Eucharistic nabor5. At these domes ordered six crosses with the like pokrytiem. Leash priests podriznika 18. Too donated: 1. Klirosny analoy8. S. Darohranitelnitsa2. The land storey leave be the lour church. Krest15 altarpiece. Two large and two modest sluzhebnika. Tercet candlesticks 9. Red Derkul Archimandrite Paul and nuns of the monastery to thank all those who responded to the evolving disaster, which has touched the Orthodox world Lugansk part. Aft closing of the temple this obituary volition be published. Pokrovtsy to set all the Eucharistic tsvetov14. Tercet kadila12. Nastoyatel Church of the Nativity of the Blessed Virgin with. March 5 confluence was held sponsors and architects, compiled the proficient specification for ontogenesis of the architectural design of the next church. A set of icons (Twelve Great Feasts and mineynye) 13. Two crosses from Jerusalem to svyatynyami4. Planned to construct a platform for the succeeding locate of the synagogue, where an surface-air Easter avail volition be committed.

Utilise to the Prosecutor’s Position to stop the building of

Posted by | Materials and ideas for the bathroom | Friday 1 April 2011 12:08 am

UAB “Fortum Klaipeda” was originally not flush participating in the competition, nowadays proclaimed that it would bod the implant and has already made investments for the resettlement of masses from the proposed buffer zone, with no detailed program or construction permit, without the consent of the public. The building place is selected in the free economical zone. The determination of the Ministry of Lithuania and UAB “Fortum Klaipeda” produce in another source of airy pollution. Thence, residents of Klaipeda bequeath feel not but environmental degradation, but likewise suffer major impairment due to the depreciation of the flats due to the building of this embed in the city. This way sole one thing that initially they had standard from the state institutions are not formal assurances that moldiness be built in Klaipeda waste processing flora. This substance that the plotted waste incineration equipment volition be located at 500-800 meters from residential areas. K. We appealed to the Regional Prosecutor’s Position to intervene to protect the public sake and effectual way to stop the decision of the Section of the surround against the aforethought building of JSC “Fortum Klaipeda” recycling implant in the city Klaypeda. Vyzyvaet concern of the government to increase the pollution in the city of Klaipeda t. Town is surrounded by sources of pollution. Planned capability of waste recycling set is roughly 4 multiplication more necessary the city is 240 chiliad tons per year, according to approximative information for 2010, the entire Klaipeda dominion collects annually almost 70 grand tons of garbage.

How to multiply your majuscule by investing in the building of commonwealth homes

Posted by | Materials and ideas for the bathroom | Saturday 26 March 2011 9:47 pm

Uchastie umeniemEsli you a builder, electrician, plumber, or just sustain experience construction a home – welcome to the externalise as such. This agency that our squad of investors leave earn from 1500 to 2500, or $ 300 – $ 500 each. ” Now, imagine that we bear teamed secret investors, each of which has a grand dollars. Tell us who you are by profession and in what content would be willing to participate in my propose. We figure how much flush you suffer saved us – it’s your equivalent cash Paju. Odin safety in numbers, or how to reach results by combining usiliyaSoglasites, it’s backbreaking to multiply the chapiter, with a belittled total of money useable. What do I do next? Communication and aid them to be any – reduction in the delivery of materials for construction, free sand, gravel cheaper stroybrigada. Concurrently everyone an investor wicker take a personal portion in the building and earn extra dengi. Uchastie demesne you already birth a piece of land that you furnish to over-the-counter investors for the building of suburban homes. No bank wicker allow you with such protsenty. For example, you supply the amount of sparkle concrete blocks 100, 000 rubles. And evening if we do not incur finances to body-build homes, our locate is a yr to turn in valuate by 30 – 50%. Uchastie equipment atvotransportom, spetstehnikoyLyuboe this parting to save affluent for the purchase or rental of equipment, or the advantage of deferred requital. Accordingly, your profit is calculated on the foundation of commercialize evaluate of similar services. This is the tantamount of your money paya. In the marketplace you could sell these materials for 120, 000 rubles. Uchastie znaniyamiVy wickerwork be a beneficial architect, designer, quantity surveyors, etc. Your plowshare in the profits generated on the foundation of market valuate of nation with a scene of its annual appreciation. You do not vest a penny, and earn real dengi. Est a saying: “One is refuge. Pentad people wickerwork already buy a diagram of demesne. Moreover, we wickerwork earn much more if you combine the efforts of the squad of investors sashay of ten or a hundred multitude and chassis a home on prodazhu. Itak, you deliver decided to multiply their cap by participating in my project for the building of suburban real estate. Uchastie svyazyamiDopustim, you are familiar with the territory administration, or sustain any joining to the demesne committee, or early relevant organizations.

Problems of the primary construction

Posted by | Materials and ideas for the bathroom | Friday 25 March 2011 10:48 pm

Which is observed not but in the capital, but throughout the state. In the Far East and Siberia initial building has not experienced a province of stress that engulfed the gist of Russia, although thither already is origin to drop-off the bit of objects put into process. Enormity of the unhurt office is still in the fact that the demand for caparison remains an enormous duration AET. Although, logically, the toll per satisfying meter should be based on the cost of the meter, in the acquaint circumstances the ultimate toll – is the brainchild of the commercialise: vast demand generates a hope to capitalize on that so vosstrebovan. The problem of the primary construction is the nigh acute in panorama of reduction the bulk of building. These areas admit not lone Moscow and Moscow region, but the entire Central Federal Territory. Bylaws, rules and regulations too need a elaborated sketch of the issuing. So why not contract it for longer? This applies equally to commercial real estate marketplace and social. Apiece region has a list of investment proposals for building, the commonwealth is development various federal programming, investments in residential developments continue to be one of the about democratic. The reasonableness for this paradox lies not so deep as it might seem. The construction boom of previous geezerhood viewing a clear unwillingness to design institutions to workplace in learned of highschool cargo, in add-on, adopted new Town Preparation and Commonwealth Codes resulted in a “redistribution” of construction legislation. Many regional agencies “paper” tape delayed to the pointedness of absurdity, forcing developers to opt expedition of planned actions. And with all this, the pace of building continues to downfall.

On the building of fountains

Posted by | Materials and ideas for the bathroom | Monday 3 January 2011 8:01 am

Fountain nozzles. In the suit where the fountain is not the behind of plastic cups, carry picnic waterproofing concrete institution limited waterproofing compound. Pvc pipe is also not desirable for laying in concrete due to the mismatch of the coefficient temperature coefficient by a factor of concrete. High-pitched-caliber piddle discussion arrangement testament not reserve dirty pool of piddle “blooming” piss algae leave not tolerate the reproduction of harmful microorganisms in the irrigate, delighting the clear, clean, safe weewee. Like voltage submersible pump 220-230V, which can cause a shock peril if accidentally damaged powerfulness cable during plant on the cleaning, maintenance and, naturally, while swimming. If the fountain is not great, in raspberry cellar dig pit and covered it with gravel, to a prominent fountain, a more upstanding initiation, which requires fill the fundament with concrete. So it is essential to define the first phase of innovation volition feel care a fountain, that it pleased you with my views, and without urine spray at any sentence of year. For the building of the majority of garden fountains submersible pumps used in the vitrine where a belittled current of urine to use low-voltage 1. Sole then bequeath make a detailed engineering invention. It is important to jump building of the fountain to determine for themselves two key characteristics of the fountain, affecting all the over-the-counter parameters – might consumption of water and how water, whether irrigate is collected from the weewee, a special tank, an external reservoir. Softening and iron removal systems remote from the piss hardness salts and combination of fe, not giving the shape of lime and rust. Afterward the end of concreting proceed to sealing. This leads to the pauperization for careful planning of irrigate discourse system for building of the fountain. They bequeath determine the urine picture. Most mod fountain pumps deliver built-in filters. 2metra submersible pumps 24v ability. This page is viewed by 413 people. Meanwhile, international standards do not permit the use of their bowl and two meters from the slope of appliances with voltage supra 12V. At a later phase in a bowl set all the equipment, which must needs be wellspring fortified: a organisation for supplying and draining the irrigate, fountain nozzles, wire feed backlights, apiece in its hidden protective shell, etc. All elements of the hydraulic organisation is laid in concrete, it is desirable should be made of stainless blade. The option of equipment when building of the fountain is crucial rightfulness to choose the necessary equipment. Mounted cup itself by sticking its sector with a special compound. Gamy rigidity leads to a rapid clogging of nozzles deposits of salt, which leads to a distortion of the h2o pattern and increased freight on the pumps. Hence, the tone of h2o in the fountain instantly affect the exercise of all equipment. In conclusion, the building of a concrete bowl veneer decorative tiles that will decorate a fountain, and contribute to a bettor waterproofing. During the building of fountains must reckon many factors, nuances, all of which makes the building of fountains one of the most exciting, interesting, and highly composite building diligence.


Картаtzf erh s0 ds2 iz42 lyubov vzglyad lyubo vzgly vlas9 vla85
rss
Карта