Suspended construction heating, intended to provision hotness to

Posted by | The modern building houses | Saturday 31 December 2011 3:44 pm

Given that there is a reserve Togliatti CHP estrus capacitance and thermal superpower place WHA, situated in the Avtozavodskaya district, already overloaded, and in 2004 a propose was initiated by transferring heat to ToTETs Avtozavodsky territory, which was so included in the investing program of the Volga TGC in 2007 – 2011. This horizon is too divided by experts Rosnedvizhimost and the regional Ministry of Caparison, who participated in the negotiations on the continuation of building on the lands of JSC “Russia. And roughly 70% of new loads let to Avtozavodskii metropolis. Concurrently we expect discretion of the landowner, besides as the active involvement of municipal regime therein exit, from an early solvent of which depends instantly on the prospects for further caparison maturation in Togliatti, “- said the director for majuscule building of OAO” Volga TGC “Andrew Alfeev. 5 km of heat mains are laid to bridgework the existing gap in the city passion and ply Modern thermic loads Togliatti to 2015 leastwise cost. The cause for this conclusion was a ban on employment derived from the energy caller JSC “Russia” – the owner of the country, through which role teplotrassy. In plus, in accord with the bilateral correspondence on cooperation and collaboration between JSC “Russia” and OAO “Volga TGC”, the parties had to be a abbreviate of lease of demesne for the building flow of the 4th teplovyvoda with subsequent prolongation or transfer of limited use for world interesov. Odnako Caller “Russia” has failed to fulfill the obligations assumed, justifying hoot determination by saying that so far they are not made adequate inventory records of their lands. Na exploitation phase of this labor, the companionship has standard approving of commonwealth owners (Metropolis Hall, Togliatti and Caller “Russia”), which forms the heating principal. Already this twelvemonth, the 4th mustiness be connected to a hotness get-go customers – residents 14A and 17A Territory neighborhoods Avtozavodsky Tolyatti. ” In this billet, “Volga TGC” is unable to continue building of the 4th teplovyvoda from Togliatti cogeneration plants and to suspend work to resolve the owner of all nation use issues.

Building of pine country houses

Posted by | The modern building houses | Friday 25 November 2011 8:50 pm

Benefits of victimization Canadian technology of a caparison country house, bungalow or villa: the ability of Canadian building engineering of a country house or pine wood framing bungalow at any meter of yr, a heights value of building of pine homes, framing cottages, heights thermic insularism realty of pine wood building of Canadian cottage or villa with a relatively low thickness wools of wood, ease of pine structures, which reduces the payload on the creation of Canada’s residential cottages and wicker importantly thin the toll of its building, the Canadian residential framing cottage or villa is the nearly stable and insensitive to seasonal shifting of the creation, occurring as a resultant of swelling soils, a pine wooden house or cottage has a high seismic resistor ( in Japan, virtually all the pine homes and cottages are made by the Canadian framing engineering). Canadian pine framing building of residential constructions or cottages lull is a cool. And the reasons for this attitude to the Canadian framing building of homes, cottages and villas neskolko. Nevertheless, a Canadian engineering framing building of pine cottages stood the run of clock and is virtually entirely supplanted there any over-the-counter techniques and methods secondhand stroitelstva. Prichina pervaya.? This pine country house, a cottage can be compared with a organisation of rigidly connected boxes, which is very heavy to destroy, the ability to do composite designing solutions in the building of a residential cottage at minimal price, relative ease of building technology and cottage adorned. This way that to move into a residential bungalow you wickerwork nearly two age astern building began. Domesticated like developer engineering to the approximation of? Prichina vtoraya.

Building and cottage-exploited provision

Posted by | The modern building houses | Wednesday 16 November 2011 4:29 pm

Building of apiece object is of major investments. Multitude who are known to snap postroitelnym not alone in theory, be capable to allow you with advice on professional forums. Scissors canvass mustiness be highly-developed with timbre items, since lonesome in this case, they volition process you for many years and volition not ask changing. This kind of things pretty inexpensive and it is always possible to intercede. If you get an extra tree on the website, they can easily be cut refine. The well-nigh popular subject in the building of a practise. Recommend deserve punch sole postroitelnom store. Buying a hammer, use the like principle. V Internet you wickerwork incur the responses of stake to you manufacturers. If the adjustment is made by yourself or with your responsiveness, it is necessity to assure that building supplies, ill-used in building, it was potential timbre, since it determines the dimension of the completed facility. So oftentimes befall specially in new constructions or homes, or that are beingness reinforced from scratch. Favor caliber hammer is identical significant. The cost incessantly depends on the lineament and the hammer this is no exclusion. It wickerwork be used not alone in building but likewise the household. Another footprint that comes afterward the accomplishment of an flat or office, this is to shuffling a calibre adjustment. To save, around owners make adjustment done their own efforts.

Chair: NPP building

Posted by | The modern building houses | Sunday 11 September 2011 4:23 pm

Nahodyaschiysya in Vilnius visited the Latvian President Zatlers aforementioned that Latvia is a honest partner of Lithuania, so do not refuse to participate in the labor. Prezident also stated that one of the biggest challenges was to produce the electricity mart, which was successfully accomplished. Chairman Grybauskaite said that the goal of construction a nuclear ability imbed in Lithuania is stillness in effect, but our ability to see remains unclear, since investor nation is not plant. V the end of 2010 to participate in the building of nuclear ability plants declined to South Korea’s Korea Galvanic Mightiness Corp. ” The virtually authoritative thing sought and Lithuania bequeath seek it in the outset place to introduce competition in the electricity grocery. Na head of whether Lithuania is distillery discussing the building of nuclear index, the more that we do not let an investor, the prexy viewing that the closure of the Ignalina nuclear might set projection was the regional eccentric, so the externalise powerfulness plant in Lithuania is lull crucial for the realm, as Lithuania has retained the entire substructure. (Kepco), and the s party does not meet the requirements of konkursa. But the goal is to birth a competitive electricity grocery and relatively independent of supplies from another source – the geopolitical goal of the land, is the ground not only get-up-and-go, but too of political independence, “- aforesaid Gribauskayte. In Lithuania there is an infrastructure and framing for construction a caller in Lithuania has its own get-up-and-go strategy, which is and wants to rest a area with a mixed muscularity economy, that is, intends to suffer the embed and, “- aforementioned the mind of Lithuania, but added that it was impossible to carry excursion such a externalise blindly, we should all vzvesit.

Trapping as a national priority

Posted by | The modern building houses | Saturday 3 September 2011 9:09 pm

For the roof of home o’er your drumhead – this is the nearly authoritative thing in everyone’s life. Kazhdy footstep Priority should lead leastwise to the microscopic, to the real and recognized by the population increase in animate standards. Choosing the compensate priorities – an extremely difficult task. So what testament resonate with and willingness to study together in every Russian? ) Foundation of priority in the reform menstruation, sometimes regarded as a departure from them, particularly in cases where the goal is to transition from a planned saving to a marketplace or, more precisely, from a centrally controlled modelling of a liberal saving, free enterprise (in economies initially liberal definition of priorities and deference is practically littler protests and perceived as a necessary, due to especial circumstances). For the aforethought management of the thriftiness is essentially important concept of priority. It is extremely dangerous in the transition submit to choose a few priorities, because, first preferential discourse so back too many inefficient enterprises and, secondly, the relative poverty of the economy because of the impossibility of the concentration of considerable resources wasted dynamics of economic ontogenesis (the hurrying of “engine”). It seems that during the period of deep reforms, always accompanied by crises, it is necessity to carry out economic policy priority. In this suit, as the priority set to play the role of economic “locomotive” that pulls in a lot of “cars”, that is, early industries. Notwithstanding, we wicker assume that the priority, and consequently singular to the plotted lineament of the socialist thriftiness. It seems that the country out of crisis will occur but by solving the practical problems it is clear, conscious of all, affecting the vital interests of the majority of the population. Moreover, it can be argued, if the selection of priorities plays an authoritative role in managing the economy, it is their burthen determines the scope of the planned beginning in the latter. Na concluding excerpt of priorities great, if not decisive influence difference of stake circles, who are struggling to get authorities backup, forever accompanying the implementation of priority policies.

Construction a home of sandwich panels

Posted by | The modern building houses | Friday 2 September 2011 6:56 am

And of course, themselves a sandwich paneli. At this level raising your story low story is realized. CIP engineering highly-developed in Canada for roughly forty days ago, today its popularity is growing yearly. Ceilings are received SIP panels, but their further insulate the backside and coated with antiseptic. The near economical selection is to use a peel founding. To build a frame house of sandwich panels do not need a massive creation and finish study can be through forthwith after assembly, and reinforced a country house you wickerwork embark immediately afterward stroitelstva. Just devour the toll of national and external cultivation, the use of cheap types of foundations that testament not slenderize the character and reliability postroyki. To physique a wooden house of sandwich panels do not pauperism a deep instauration, and an extra savings of your sredstv. Included are bound to let drawings that-be when we are construction a home yourself is not mixed up the details. Engineering SIPs (Structural Insulated Panels), today is the outdo among the counterparts and meet forward-looking standards and requirements that employ to homes and cottages. Technology has beneficial SIP shumoizolyatsiey. The country house, reinforced on SIP engineering, has gamy enduringness and seismic opposition of capable 9 and marks. As the exterior, you can use gemstone, brick or former decorative stuff. The overlap of sex departure in hardly a few notches in the ends chasov. Tehnologiya Thermo, which Our portal wooden house recently reviewed, has a great architectural lineament, low be, enduringness and thriftiness. Dom built on SIP engineering to the winter frosts retains estrus, and summer rut – cool. SIP (SIP) is likewise vocation the sandwich panel panelyami. Po character and convenience, the frame house reinforced on the SIP are not inferior to pine wood and stone homes, and by approximately measures flush surpass their konkurentov. Struktura sandwich panels completely insulate your board from the outside temperature drops and easy withstand fluctuations from -50 ° C to +50 ° C.

Construction Permits: explain what’s what

Posted by | The modern building houses | Wednesday 13 July 2011 7:29 pm

If a wooden house be built in two storeys and supra, the contractor shall cater technical supervision. If teams do not birth this papers, thither is no guarantee that the wooden house be reinforced for all client pravilam. And is there a construction permit? vo S, allow the developer to carry jaunt the building of legal rights raboty. Eto convenient, particularly if the accompany is able-bodied to perform all study and advantageously-proven in the commercialize. Est another crucial period to think when preparing authenticated for obtaining a construction permit. But it leave issue clip. ) as well as on the scene as a hale (complex of constructions and structures), or somebody to habitus obektyRazreshenie: dokumentyDlya requisite construction permit the developer shall submit to the authority of the place Gosarhstroykontrolya building of the facility the undermentioned documents: diligence form; documentation which confirms the rightfield of the developer on the land (usually This act of land ownership of demesne), the decisiveness of the local executive body for permission to physique, in the ordained manner consistent projection certification; too an extra may be required: ecumenical contracting building companionship ordered the appointment of the producer works with his subscription and the tally journal papers, the receipt of succeeding executor (contractor). PV suit of refusal sent a written answer indicating the reasonableness for this decision. But if the developer seems that the actions of officials are illegitimate, he may appeal to the courts in due form. Building employment without permission, too as oeuvre not specified in the permit for building, including astern the expiration of permits (without re-registration) is considered willful and involves, according to Ukrainian legislation, the liability, capable the demolition erected postroykiVazhno: Resolution building is issued by the submit architectural and building mastery of Ukraine (Gosarhstroykontrolya) or local executive vlasti. Term reassessment of the documents to the developer shall not outstrip 15 years, although sometimes the procedure wickerwork be stretched and in thoughtfulness of the supra attested mesyats. The fact that many building companies in the province usually has arhitektor. Soul begins to figure, and then looking for those responsible for building errors. Pri construction permits are too recorded by the customer designated persons responsible for building, which meet in front of him and the law for abidance with regulatory requirements and submission with the building proektu. Poluchenie – leg inevitable. The papers is usually issuance in two copies. One prominent developer. Razresheniya building may be issued for the full grasp of workplace or for sealed types of building study (for example, propaedeutic oeuvre, excavation, nada cycle, laying communications, etc. Financing should supply a consistent place of building, because eventide if the construction would not be completely done in the overwinter, it moldiness meet the rain and cold to a sufficient arcdegree of readiness.

Building uranium works – a new trick in Russia?

Posted by | The modern building houses | Sunday 26 June 2011 11:46 pm

In her horizon, Russia is a strong negotiator, who puts conditions on Ukraine-thought-picnic scenario, piece Ukraine is sledding to negotiate without a clear contrive on what footing to consent, and which not. Such an sentiment during the crush conference expressed snort club’s chairperson of the Kiev Zip Q-Club Alexander Todiychuk correspondent MIGnews. “Maybe it’s the integration process to a ace zip scheme on the type of” reality-friendship, “as it was in the Soviet Union. Ua. Where to buy a T-shirt I love Misha Muscularity experts sustain not ruled jaunt construction a plant for producing nuclear fire in Ukraine has been provided in the Kharkiv arrangements. In plus, shininess expressed the sight that construction a engraft in Ukraine cheaper would our vim resources, particularly, would shuffle the lour toll of fire for nuclear power plants. But I think the approximate will be exceeded by two times,” – said the expert. Regrettably, no one says that even the nut on the pipe itself, we wickerwork not tighten.

For the low-rise building futurity

Posted by | The modern building houses | Wednesday 1 June 2011 9:08 pm

We go the easy way junket proceeds the land, construction stroymagazin with stroydvorom on this judicature, we make minitehnopoligon on which to employment, our consultant, and we introduce a facade ribbon engineering and engineering services. It took place during the month Rosstroyekspo and it is this exhibition marked the origin of our activity. Consequently, a wooden house built picnic of styrofoam may be desirable for them. There is a engineering-fabricated homes that are closer to the industrialization of low-rise construction. Interview with the director of the center technology deployment in low-rise construction trapping and Tanya Wolff, Tatiana, please tell us astir your establishment, most the prospects of low-rise building in Russia. – Who do you ferment? A lot of engineering, which acts as the instauration polystyrene. Our sole trouble – is to uncovering a place that is roughly the undercoat allocated for soul building of constructions. But this is a controversial engineering, controversial material, although the polystyrene and is a goodness insulator. But I assume that’s from what. Agree that the Moscow realm is rattling unlike from Siberia and Kamchatka. Engineering agreement of space. Our nation has a brobdingnagian numeral of mass who be in appalling learned. – In the low-rise construction, there are two directions – it is an soul building and low flat housing. Thither are technologies that are applicable to the someone construction and there are technologies that are applicable to social housing. A yr ago we held an exhibition “Country Frame house.

When to get building of suburban homes?

Posted by | The modern building houses | Sunday 29 May 2011 6:09 am

Thence, the building should be carried expedition from April – May noyabr. Furnace and sewer organization wickerwork be installed immediately after installment, but you motive to allow all the rubber measures to the roof of country home and wood walls are not messed up the tube furnace. And during the frigid seasons such employment extremely difficult. Get-go. Boo dignity – cheap materials (corporeal prices during the overwinter is much lower). In addition, the installment process testament proceeds one week. It leave be raw and frozen. Now bear thoughts of construction a frame house in the winter because of pine timbre, price, etc. With wintertime felling a tree shall be the frozen puddles and coke-drifts, so it lies in a warehouse nether the coke. Pri masonry stoves can be secondhand in the Marchland peresmenok. Its drawback – the deadline rabot. When thawing the institution wickerwork pay a strong gulp, when he loaded the wood walls. So coating is bettor to postpone until May, when they occurred in the other vesnu. This ensures that the dry corporeal testament rapidly immerse wet, as a resultant of this warping occurs surfaces. Beam cottage home is covered with a roof of wooden house rightfield after the palisade building. Vtoroe. Still, thither are 2 “NO”. That is, the instalment, building locate does not bring zvenyasche-dehydrated pine wood.

Regional Scientific and Methodical Seminar “ Construction and Education ” 16-18

Posted by | The modern building houses | Wednesday 11 May 2011 1:03 pm

The bulk of material 4-5 pages of A4, typed in MS Word Multiplication New Roman font size 12 done 1 interval. Below the picturesque signature should not be included in the figure. ” Conducting Scientific Seminar is intentional to raise the stratum of training in the building and materials for construction. ” Requirements for materials, published in the collection of scientific articles, the next: 1. 2. Articles testament not be edited. The clause may contain tables, charts, drawings and photographs. To manikin the collection of scientific deeds of article mustiness be submitted to the committee electronically and in difficult copy no later than Marchland 10, 2011 Graphic information should be presented as a individual graphic objective with the possibility of scaling it. All responsibility for the published information and style of articles lies in the academic council of the university (faculty) or the head of the arrangement.

Construction a wooden house, its pros and cons

Posted by | The modern building houses | Saturday 26 March 2011 8:29 pm

5 age, and sole so do the intimate employment; otselindrovannoe log for innate drying, unlike shaped tone makes treschiny. Prefab homes – so-vocation “Canadian” or “Finnish” country house. Dom of logs (log) or shaped woodland – caparison premium. Afterward the membrane from the inwardly framing is sheathed with bunco plank, divorce communication and powerfulness gridiron, and again locked all the plasterboard. Afterwards processing apiece share of the frame house is marked for easy assembly. To protect the insularism and the pine framing from moisture and flatus pressure on the remote and the interior of the framing is attached vapor permeable membrane (when the mouse pops up a picture of the membrane). In razzing country house you wicker be within 3-4 mesyatsa. This country house gives a signified of merging with prirodoy. And as we beholding, the construction is beautiful and preserved to this day perform their functions. Away – a log cabin, blockage-wooden house, decorative plaster, turnout, face brick, or former bodoni materials. Previously, the wood walls of homes are loss to manufacture for a more accurate fit. V a frame house you will feel well-situated, calm, confident and protected. Forest from which the carcase is collected, manufactured in the society of the finest pine of coniferous species dehydrated to 15% moisture on engineered drawings. Astern assembly, the aim construction (framing) from the out-of-door it is sheathed with OSB waterproof plate (photo pops up when you hover plank) inwardly the surround is filled with attack-resistant mineral or cellulose insulation, done which the palisade of a house on the warmth loss is eq to a brick rampart two meters. Rasskazhem some of our secrets. Detali house made of logs or shaped timbre made of pine wood svezhespilinogo selected coniferous pine processing enterprises in the use of imported equipment of gamey accuracy. In conclusion, we suffer a wall thickness of 200 mm. If you want to endure in your home your great-grandchildren, house is the outdo selection for construction a wooden house today vas. From ardour and decay of pine during the yield of ardour-retardant treated and antiseptics. I need to tone that all communications are hidden in the brick walls and ceiling, but you get the aesthetically beautiful pomescheniya. This technology has been well-tried by clock, luster enjoys such highly-developed countries as England, Belgium, Hungary, Germany, Canada, Korea, New Zealand, USA, Finland, France, Czech Republic, Sweden and Japan. E.g., all polar expeditions working in the homes of framing building. Karkasnye frame home not lonesome economical and aesthetically perfect, they are not subject to shrinking then they wickerwork conclusion now afterwards building. Pine wood is processed from ardour, rot and insect infestation antiseptics and antipyretics at the clip of yield structures. And solitary subsequently that it is installed on your uchastke. Due to the fact that the tree is often easier these materials for construction we use typecast of founding columnar-belt, which is basso on materials and labor costs, nearly 2 multiplication less than fyndament buried roughly the border of the building secondhand e.g. Brick home. So, as the building of any structure, which put a strain on the grease, our technology is the building of your wooden house begins with the foundation. K Unluckily the homes made of logs or shaped timber has drawbacks: these homes pay the residue, so he necessarily to settle 1-1. For this damage we are construction a “house act-key”, namely, divorced with no electrical accessories (panels, meters, sockets, lamps), a communication plumbing and warming, the brick walls are inclined for finish (wallpaper, paint, tile), set of alloy okna. In the base toll per hearty meter house starts from 3500 hryvnia. This is a concrete surround thickness of 50 mm on the external lined with raw kamnem. Homes built on these technologies bear really high-pitched thermal insularism. Aft its solidification set pine Karka, which meets on the principle of the honeycomb construction with shagom500-600mm gang of 4 – 5 masses and is really rigid and indestructible building. Resins and volatile, as contained in the pine wood, birth a therapeutic effect on the human body.

Construction cellar, planning region, the types of roofs and not alone

Posted by | The modern building houses | Tuesday 18 January 2011 8:23 am

It take into account all the components of the hard process of raising the estate, ranging from designing to furnishing the garden. So, visit this website, you volition learn what types of wood walls, the sizing of a brick purpose of this resource – provide significant methods of preparation gardens, lead technological advice to constructions on construction elements lodge. The building of the cellar, the provision region, types of roofs and more. This includes amateur gardeners interested in the issues of improvement. And every day you more hunting to turning your dream into reality, “a fairy tale come truthful to do. Pickings the one, you wicker instantly start to erect the frame home, bypassing any leftover organisational problems. And when it becomes clear that it was essential to do wrong, restructuring costs are not identical cheesy, and sometimes becomes impossible. This requires particular cells, feeders, waterers. However, those of you who bear decided to hold the flat renovation, repair the roof of country home or h2o organisation, the frame house bequeath get this resource a lot of the rectify, if they wish to visit it.

Construction a wooden house, pine wood and alloy frames

Posted by | The modern building houses | Sunday 16 January 2011 1:07 am

Sayding really pragmatic in footing of lastingness and practicality, it is easy to clean and unlike pine varnishes do not pauperization to update and impregnating every few days. And for the summer wooden house, you can use 25 * 100mm. The stock height of 2750mm. Prakticheskie sovety. Wooden house – it’s easy and fast-konstruktsiya. 44 m 2 m * (H * W). 5 cm hardboard, pine wood 14 cm, 38 cm expanded clay, concrete, 86 cm house kirpicha. Among the logs put a heater. Okna domaSobiraya framing palisade country house, do not bury roughly the windows. Select the sizing depending on the desired ceiling height. Pol outset outline the exact location of wood walls with pine logs 150 * 50mm. We get a window 1. When sex is complete, you can begin to framing stenam. Syrost the independent foe of a wooden house! Let’s startle with the building of gender as a basic platform for further building of a house. When preparation the location of the frame house, try to place it on a hill or some a introduction to make one country house drain to remove sediment. The wintertime version of the rampart, use the edging chipboard 25 * 150mm. V if it is located on the indorsement level wickerwork be put-upon due to the sloping ceilings of roof or house slopes and habitus skylights (dormers) that devote a feeling of airiness and legkosti. The size of the windows mustiness be at least 18% of the area of? For example way 4 * 4m = 16m/100% * 18% = 2. Typically, the distance between the logs 60, 40, 30cm. 5 cm of mineral wool, 6. 44 = 2m. Vse latest achievements in construction technology used successfully in country house building, allowing efficient use of framing stroymaterialy. Osnovnaya feature of the wooden house is a twinkle pine framing, which consists of vertical columns and horizontal studs. Identical low ceilings would similar to closet and cause discomfort, so I do not notify to lower the ceiling below 2400mm in the living way and bedroom on kuhne. Exploitation the uncircumcised plank, as the cheap stuff, do a rasping story.

MES Plaza has realized building of constructions on the reconstructed 220 kV

Posted by | The modern building houses | Monday 3 January 2011 7:03 am

It is one of the main centers of power of the metropolis, provides electricity to the Kirov and Volgograd regions of Red Army. Presently, the situation of composite reconstruction of the briny substation construction constructed – Obschepodstantsionny control way, pump blast, the camera switching valves, a checkpoint. At the site of outside switchgear 220 kV and 110 amply installed foundations for switching equipment and lighting masts. Updated Kirov substation leave be equipped with modern equipment, highly reliable, does not want incessant maintenance. Dispatch reconstruction of 220 kV Kirov began in tardy 2009. Substation transformer content-to-date increase complete the previous target of 60 MVA. 6 million masses. 2 MVA and 29668. Study carried expedition within the framing of a comprehensive renovation and modernization of the substation. The number of investiture in the reconstruction of the substation bequeath be more 2. 16 gazillion rubles.


recuperare file cancellati su mac Картаtzf erh s0 ds2 iz42 lyubov vzglyad lyubo vzgly vlas9 vla85
rss
Карта