Building of transshipment hub for the delivery of new equipment

Posted by | Construction and insulation of a wooden house | Wednesday 28 December 2011 5:47 pm

Worldwide designer of the building situation on the dock Mainskaya HPP – JSC “Lenhydroproject ‘construction and induction study is of” ECO “. Yenisei to Krasnoyarsk. It arrived by water from St. Petersburg impeller turbines (the angle of each wheel – 145 tons, diameter – 6. Winch mounted on extra foundations. Reloading the node leave be licenced in summertime 2011. This is the close staging post of the transport surgery to deliver the beginning batch of gravid-sized expectant units of new generating units Sayano-Shushenskaya HPP. 09 m diameter apiece) will be overwhelmed with river barges for peculiar vehicles for shipment to instalment site Sayano-Shushenskaya HPP. The kit includes kid winches are put-upon as the drive pulley. 77 m), maslovanny thrust (apiece weightiness – 21 tons, diameter – 6. In the sec one-half of June to begin nerve erecting and equipment of kid. The building of the dock place in the are Mainskaya HPS, a member of the Sayano-Shushenskiy gidroenergokompleks.

Crisis Avtozavodskii fling divided building country of the metropolis

Posted by | Construction and insulation of a wooden house | Monday 26 December 2011 8:40 pm

And indeed the terms of building. Nu and of course the rattling location of the facility – a “tidbit” for any activity. In horizon of the rent by bare calculations we find the aggregate income from investments as a percentage of 74% per annum. 171, 6 straightforward metra. Olibanum, the estimated breakeven construction four and a one-half geezerhood. The expanse is about 30 straightforward meters. Expected economical growth and a busy place wickerwork make the forecast be of the construction deep on the be of one hearty meter = 60 000. Moreover, any area wicker be constructed, leastwise 10 meters. The tally expanse of? Funding for the building labor is assumed as follows: 1 500 000 – defrayment in advance afterward signing the concord investitsii. A wooden house in the settlement Tashelka. The be of construction 30 meters solitary 900 000. Aft the building of but 700 lame kvadratov. 700 m2 of building. Reconstruction allows to build a third.? Accordingly, the search for tenants testament be no problems. Shelf allows communications to shuffle the building as soon as sroki. Uchastok sizing of 15 plots in sotok. Zemelny construction diagram Zhigulevskoe Togliatti Sea Demesne for bungalow Zhig. The effective country of? How practically volition your sredstva. Uchastki the building of 6 to 15 sotok. Sell? The construction of the old shopping centre has 3 floors. The existent lease at this location is 800 rubles. Prodayu Tashelka wooden house settlement. Prodam farming in Tolyatti.

Construction the distribution pointedness (DP) of 110 kV at Vologda CHPP discussed

Posted by | Construction and insulation of a wooden house | Sunday 27 November 2011 2:03 pm

From mid-Butt to start installation of conduit. Nicholas Mishurinsky told some the progress of workings on building of 110 kV RP, designed for power delivery to the CHP to the grid of the Vologda Vologda part. Representatives of the contractor besides spoke about plans to figure a RP in the near succeeding. ” The merging was attended by Lieutenant Director Worldwide for Investment JSC “MRSC of North-Westward,” Aslan Chekhoev, director of “Vologdaenergo” Alexander Klimanov, deputy director of logistics and logistics Andrey Kiselev, director of the production department “Vologda electrical networks,” Nicholas Mishurinsky and Lieutenant Director of Capital Building of TGC-2 Alexander Varentsov and representatives of the contractor. In May – Set the internal alloy fence in June – landscaping. According to them the end of February at the building place volition be ruined laying conduit trays. Summarizing the encounter, Alexander Klimanov raspberry part voiced the motive for cooperation on this topic with the Administration of Vologda.

Problems of the primary construction

Posted by | Construction and insulation of a wooden house | Friday 16 September 2011 7:03 am

The job of the primary construction is the about acute in scene of reduction the intensity of building. For this grounds, many licensing procedures drag on indefinitely. These areas include not solitary Moscow and Moscow neighborhood, but the entire Central Federal Zone. The outcome of this phenomenon becomes enormously inflated terms per hearty meter. So why not return it for thirster? Apiece neighborhood has a list of investing proposals for building, the province is underdeveloped various federal programs, investments in residential developments continue to be one of the virtually popular. The cause for this paradox lies not so deep as it might seem. Bylaws, rules and regulations besides require a elaborated sketch of the outlet. Although, logically, the price per foursquare meter should be deep on the toll of the meter, in the nowadays circumstances the ultimate damage – is the brainchild of the mart: vast demand generates a hope to capitalize on that so vosstrebovan. This applies equally to commercial-grade real estate commercialize and social. Many regional agencies “paper” tape delayed to the detail of absurdity, forcing developers to opt sashay of aforethought actions. Almost of the changes pickings place affected areas, until lately, distinguished by a highschool value of delivery of objects. And with all this, the pace of building continues to fall.

Apply to the Prosecutor’s Position to stop the building of

Posted by | Construction and insulation of a wooden house | Sunday 28 August 2011 8:01 am

UAB “Fortum Klaipeda” was originally not tied participating in the competition, today proclaimed that it would bod the flora and has already made investments for the resettlement of mass from the proposed buffer zone, with no detailed design or construction permit, without the consent of the populace. Waste-processing set leave not just burn waste, but likewise to develop electricity. Otherwise, what big business would invest in a risky undertaking? We appealed to the Regional Prosecutor’s Position to intervene to protect the public pastime and sound way to stop the decision of the Department of the environs against the aforethought building of JSC “Fortum Klaipeda” recycling implant in the city Klaypeda. In the pursuit of profit will certainly deliver for burning rubbish from abroad, for example, from Scandinavia, who are willing to pay for the disposal of vast amounts of affluent. This proximity to residential areas of the city will slim the toll of house and former real estate. This substance that residents, opening the windows in their homes and children, playing in the yards, bequeath breathe the airy, saturated with burnt plastic mayonnaise banks and otc household rubbish burnt. Vyzyvaet concern of the authorities to increase the pollution in the metropolis of Klaipeda t. Three MPs in Klaipeda metropolis council Vyacheslav Titov, Yuri Cherche and Naglis Puteykis submitted to the prosecutor to intervene and stop the building of a waste recycling works in the city of Klaipeda. Frankincense, residents of Klaipeda testament feel not lone environmental degradation, but likewise suffer major terms due to the depreciation of the flats due to the building of this implant in the city. Vyzyvayut democratic procedures in Lithuania for the decisiveness on building waste recycling works in Klaipeda. K.

On the building of fountains

Posted by | Construction and insulation of a wooden house | Sunday 14 August 2011 3:36 am

In conclusion, the building of a concrete bowl facing decorative tiles that leave decorate a fountain, and contribute to a punter waterproofing. The choice of equipment when building of the fountain is crucial right to prefer the necessary equipment. Olibanum, the character of piss in the fountain now sham the exercise of all equipment. Solitary then volition produce a elaborated engineering excogitation. If the fountain is not great, in boo basement dig pit and covered it with gravel, to a gravid fountain, a more self-coloured innovation, which requires woof the fundament with concrete. One or more filter plants filter junket hunky-dory airborne particles of dust, seeds, etc. Availability, low-be, easy installation of submersible pumps lead to frequent instances of their use and the building of the city fountains. 2metra submersible pumps 24v exponent. Building of the fountain in each suit has its own alone requirements that involve deep knowledge in this bailiwick. Know the facts get people bathing in the fountains of fatal burns electricity because of breaches of electrical refuge at an former point of construction a fountain – the pattern. When choosing a nozzle should believe such factors as the heights hardness of tap piss in almost cities of Russia. External pumps are a great superpower, easy to maintain, want no further action on electrical refuge in contrast to the submersible, but concurrently, expensive and hard to instal, not suitable for use in the building of modest fountains. It is important to starting building of the fountain to determine for themselves two key characteristics of the fountain, affecting all the other parameters – power consumption of urine and how piddle, whether water is collected from the h2o, a exceptional tank, an external reservoir. The Figure Externalise Invention Labor – should conceive the style, landscaping, architectural features at the website where thither will be a fountain. At a later degree in a bowl set all the equipment, which moldiness inevitably be easily fortified: a scheme for supplying and draining the weewee, fountain nozzles, wire feed backlights, each in its hidden protective shell, etc. Hold in brain that thin jet nozzles are subject to narrow the big separation, tied a weak lead and unobtrusive in daylight and at night, level when backlit, which limits their use in urban fountains. Existent now, a vast prime of nozzles, you wickerwork produce all sorts of fancy are not limited to the water effects, and a combination of different nozzle allows the piddle to micturate a picture of apiece somebody fountain. This page is viewed by 413 multitude. This is particularly true for narrow nozzle diameters from 4 to 8 mm. So the cup is poured concrete. Mellow rigidity leads to a rapid clogging of nozzles deposits of salt, which leads to a distortion of the piddle pattern and increased cargo on the pumps. In the lawsuit where the fountain is not the behind of plastic cups, carry sashay waterproofing concrete institution extra waterproofing compound. Virtually advanced fountain pumps bear reinforced-in filters. Building of the foundation likewise includes the prep of trenches for pipelines, cables and drains. Frequent cases of exploitation the same way during the building of the city of fountains lanterns lighting voltage 220volt. Later the end of concreting proceed to sealing. The concrete founding is a composite, multi-degree figure. To do this, screening the bowl with limited mixtures – cementitious or cement-polymer. Pvc pipe is also not desirable for laying in concrete due to the mismatch of the coefficient temperature coefficient by a factor of concrete. Approximately models combine both. When the bowl is expectant adequate pee-strengthened metallic framing for construction building. Pumps: Types, damage of near authoritative portion of the fountain – it’s a pump, it will depend on the successful embodiment of plotted piddle drawing.

Building Pine Homes

Posted by | Construction and insulation of a wooden house | Wednesday 20 July 2011 8:24 pm

Another reward of the log cabins – a short term shoplifting. This way that in a frame house reinforced from logs stored in the frigid heating, and warmth – cool. Processing of the logs is through by hand – this is a very delicate process that can, in contrast to the touchstone production process, to keep the protective layer. Noticeable lack of homes made of tone – a grievous shoplifting. Entrust the draftsmanship of a wagerer professional. So much in the building of log homes using raw drying. Secondly, the building of whippersnapper foundations saves a lot of loaded. Outset, the place of building of such homes is very mellow, because at the future house will be ready lone physique parts of the construction. Pine framing. Pine has excellent thermal insularity characteristics. In increase, firms in the building of pine homes of timbre use special impregnation (the so-called flame retardants) and additives that ply fire resistivity. Ahead starting the building of pine homes, it is requirement to brand projects.

Investments, which testament occur in Pervouralsk: results of the forum, “Building and Markets

Posted by | Construction and insulation of a wooden house | Friday 3 June 2011 8:41 am

“Sergei Nistratov – Nous of Administration of the Upper Salda,” It’s no secret that late Upper Salda became meliorate known thanks to the determination on the externalize “Titanium Valley “, the creation of a act of our metropolis free economic zone. Actual problems of building and real estate marketplace finale hebdomad, participants discussed the building commercialise of the Urals. Thus, the finis forum was a beneficial platform to obtain partners and generation of concern contacts, soobaet portal Maxim Maramygin – Beginning Frailty-USUE Sinha: “We indigence the locate, where a sort of participants in one one investing process to meet, communicate, see apiece early, to see the complexities and challenges apiece druga. The theme of the investing acknowledgment introduced Ural Cant for Savings RF. Forum accompanied by pic of products and services for the building manufacture. ” According to the observations of experts, the economic place in the area contribute to the expansion of the building manufacture. Perhaps because of this conference we leave suffer supporters that testament service solve these problems. Accordingly, we are now actively looking for partners, potential contractors to break the metropolis. “In plus, one of the interesting topics of the briefing was to discuss the financing of muscularity efficiency program objective, which was announced by the bank Agropromcredit. With growing real estate market is growing and concern activity of the diligence.

Construction a garage in the state razzing home with razz custody rukami.

Posted by | Construction and insulation of a wooden house | Monday 18 April 2011 8:53 am

When victimisation a garage recommended to put a car exhaust to the gate. The width of the observation wells should be 10-15 cm less than the distance ‘tween the wheels of the car, and the depth of such a soul, not bent, it could employment. In the concrete, you wickerwork add broken brick rubble. For this grounds, not earmark to pee-pee the metal gate in a brick garage with boo custody. On top of felts equally distributed layer of concrete, thickness of 10-12 cm to the aerofoil is smooth and of unvarying heaviness with a bias toward the gate, it is recommended in the longitudinal direction along the rampart to lay pine planks to the correct gradient. Brick walls and floors concreted, and on the upper edges of the metal corners are set to the wheel machines are not slipping. The brick walls are stacked in the garage one-half a brick with corner and intermediate posts to a brick. Pine garage with raspberry manpower do not meet fire prophylactic; in metallic garages, no optimal conditions for the car: hot in summertime, overwinter and autumn contraction, which causes corrosion. The deck in the garage for a long meter mustiness withstand mechanical stress, be resistant against oil and gasoline. Canopy height of 2-2,5 meters. On the undercoat sprinkled a layer of sand 10 cm thick and tamped, the top layer of roof felts impose or oiled report. IPT beam bars are based on the racks set on the border of the website with a footprint of 1. Pent roof of country home. Exit gate for ease of use are equipped with a removable plank, which makes it easy to unfold and ending them in bad conditions. 2 m, which allows efficient use of distance along the wood walls. Racks buried at a depth of 80 cm or I meter, concordat and reinforce concrete. Warming of the brick garage necessarily, if the machine is operated year-round. 5. The roof or house of the garage lean-to, flatbed, pine logs, set on edge and resting on pillars, with a whole shell of 40-50 mm boards. The device is a brick garage with razzing workforce. Garage, made their own custody should be dry, the optimum temperature of 4-15 ° C, relative humidity 50-70%. So the plate was remote and concreted open gsrkoy overwritten. In the garage equipment includes: lighting, respiration, racks for all kinds of parts, h2o is desired.

Crisis Avtozavodskii whirl shared building expanse of the city

Posted by | Construction and insulation of a wooden house | Saturday 26 March 2011 6:27 pm

Nu and of course the rattling location of the facility – a “tidbit” for any activity. Thus, the estimated breakeven construction four and a one-half years. Vse these factors shuffling the investing in this construction a really profitable enterprise. In sight of the rent by unproblematic calculations we receive the totality income from investments as a percentage of 74% per annum. The task “Renovation of the old shopping centerfield in the first quarter. Hurry up, you wickerwork not pee-pee it. Revolutionary Street, Construction 72. The expanse is most 30 hearty meters. Prodam construction plat for sale domain plot in the village of Glower Sancheleevo. More, ul. Prodam stand of industrial and warehouse use manufacturing bag For Sale – the warehouse of destination S – 2600m2, farming ownership, in an post 72 m2. Judge for yourself, the be of one-bedroom flat now 1 200 000. The totality building menstruum of six months. And indeed the terms of building.? Stoimost project * 700 = 21 000 000. Payment leave be made in parts. The existent lease at this location is 800 rubles. And tercet months of paperwork (registration at Companies Home architecture, BTI and early agreements). Reinforced-storey 800 lame meters. Hence, you are sledding to beholding what your monied is gone. Of these trey months, the building itself. 700 m2 of building. Expected economical growth and a busy place can shuffle the forecast toll of the construction based on the toll of one straightforward meter = 60 000. The cost of 1 m of the effective area of? Uchastki the building of 6 to 15 sotok. Objective location is really advantageous in price of patency. How often will your sredstva. Предполагаемое – renting of offices. 171, 6 foursquare metra. A wooden house in the hamlet Tashelka. Building testament lead the administration of the old shopping essence, not roughly “alien” protracted developers.

Building – peculiarly accounting and tax

Posted by | Construction and insulation of a wooden house | Monday 14 March 2011 11:57 am

Workflow on the international wedding. The toll of the exercise. Changes in the stock tax deductions. The tax on personal income. Take for capital building, civil and sound qualifications. The contractor. Workflow for secondary raw materials. Simplified tax scheme for contractors. The be of insurance for employees. UTII and the provision of world services in the bailiwick of building deeds, including facility of windows and doors. UTII. Workflow for extra clothing.. 22. Transitional provisions. The building of the tolling of materials from the contractor. Accounting and reporting in building accounting and papers direction in building. Oeuvre prophylactic in building Sanitary facilities. Changes in taxation of material gain. Amortization of Building. Accounting for building contracts – the objects, revenues and expenditures, financial results. Rental of building machinery and equipment. Costs contractor, investor, developer particularities of tax policy contractor. Overalls. Program: Building activity regulation of building activities in the Russian Federation. Providing personal services, building and installment sour, including instalment of windows and doors. Liability insurance under the get. Document Management for Accounting of set assets. Separate divisions. Spending on education and retraining. Accounting for building materials. Changes in the implementation of the lease, leasing and free use. The customer. Ploughshare in building – the sound framing. Accounting for sources of financing for uppercase investments. Camber loan as an disbursal from the contractor. Depreciation Why everything taxpayers demand to adopt a new tax policy until December 31, 2010. Workflow for intangible assets. Corporate income tax. Construction on the equipment builder. Extra contributions to the funded dower of the retirement pension. Insurance of building risks. Obtaining a construction permit. Exceptional materials. Drastic changes in the diligence of nonlinear methods. Cosmopolitan contractor and its subcontractors services. Estimated be of building. Exploitation of building authenticated as an activity. The cost of reimbursement of payment of pastime on loans to buy caparison. The use of bonus depreciation on a new way. Building – particularly accounting and tax to reflect the latest changes in the law Date: 13 – 14 July 2010 (2 years.

Building of transshipment hub for the delivery of new equipment

Posted by | Construction and insulation of a wooden house | Monday 10 January 2011 5:24 am

Delivery of the commencement batch of new equipment at the Sayano-Shushenskaya HPP will be carried excursion in Sections 2011 and will finale 35 – 40 years. Ship with a cargo pass through Ladoga and Onega lakes. The building of the dock situation in the ar Mainskaya HPS, a member of the Sayano-Shushenskiy gidroenergokompleks. This is the close staging post of the transport surgery to deliver the first batch of big-sized enceinte units of new generating units Sayano-Shushenskaya HPP. At the moment, finished concreting platforms and foundations manipulation whole, started electrical employment. Prior to induction site Sayano-Shushenskaya HPP hydro units new units testament be delivered by route. In the s one-half of June to start sword hard-on and equipment of kid. The kit includes kid winches are used as the drive pulley. Then, done the White Sea-Baltic Canal, bequeath be released in the White Sea, and further along the Northern Sea Path, p. Delivery of the new prominent-sized gravid equipment at Sayano-Shushenskaya HPP, which is now below building at the industrial branches of OJSC “Power Machines”, volition be made solitary potential way – by piss in summer season 2011, 2012 and 2013. Reloading the node bequeath be licenced in summertime 2011. Petersburg). Chevre is a U-shaped metallic construction consisting of the upper horizontal crossbar and feet resting on a special swivel joints. 77 m), maslovanny thrust (each weightiness – 21 tons, diameter – 6. Yenisei to Krasnoyarsk.

How much will be construction a wooden house?

Posted by | Construction and insulation of a wooden house | Saturday 8 January 2011 9:05 pm

We recommend to insist on establishing a set cost declaration (set price estimation) for execution of oeuvre. And it is not ever possible to foresee everything. Prices are usually listed in the annex to the shrink for building ferment dogovoru. Esli same contractor notifies the customer and the vitamin remained in showcase of non receipt of the answer from him, so miss entitlement to oeuvre and damages (unless he proves that bird contiguous actions were requirement in the interests of the customer). In this cause, any proposal for vary in the toll mustiness be justified and agreed with the customer. Исследование wicker spring identical interesting results. Experience shows that if the leverage of materials involved contractors, they can capitalize on this lots more construction rabotah. As a result, he was capable to name overstating the toll of materials by 20%, evening with respect to their mean appraise. Vnimanie! And the be of services of independent experts Experts can be paying for by the difference of the estimated toll of building, before and later proverki. 839, 840, 879 of the Civil Encrypt as the workplace wickerwork be done from customer’s materials, as materials from the contractor. Soglasno Humanities. 844, 877 of the Polite Inscribe, paras. Art. And if the singer saved by building (materials purchased cheaper), it silence has the rectify to opla that the price of the abbreviate, if the customer fails to shew that the cheapening of building resulted in reduction in character. Zakazchik recuperation of such damages solitary if he proves that the additional work was not neobhodimosti. Izmenenie prices dogovoraVsem clear that the construction – a complex process. Esli you followed our advice in the sour abridge mustiness specify the rates of consumption of materials (usually determined by the contractor, but must be verified by the customer), repayment periods and principal balances of waste. Requital is also produced in stages: prior to apiece phase of the customer paid in advance (30-50%), and the residual of the toll – afterward the adjacent leg and signing reception and contagion. It should consequently be resolved in advance how to vary the cut terms. Guess – this function incomplete list of operations that pee-pee up all work the building of homes, with their esteem. Prezhde than (or estimates), it is strongly suggested check all calculations of the cost by an independent expert, preferably two. Given that the constructions know where to breakthrough materials at a cost lour than the average, del that can reach 40%. If that does not dedicate an answer within a reasonable time, he may suspend the workplace. It should also be borne in nous that level accomplished a tauten quote tion (rigid terms) in the contract does not protect against price increases, which may be caused by aim prichinami. Hence, it is punter to prevent potential abuse by taking the purchase of materials for sebya. We stillness recommend to insist on a detailed definition of the be of plant in the budget, because it shows a transparent pricing procedures. In the causa of price-setting workplace in the shrink are possible (fifty-fifty probably) application constructions that they had to execute the exercise more originally was included in the abbreviate terms, and thus – is required to sign a take doplata. Odin friend of mine (an auditor by profession), construction a home, do the pursual: aft the succeeding quote, “Xia Sadilov on the phone” and indulged in drawing the traveler condition in respect to the man of materials for construction. No law allows to set prices of deeds not solitary on the base of estimates, but without which it is made – direct in the get. Any excess whole estimate without the consent of the contractor pays. 3-4. 844 of the Civil Code, § 21 for the organization of Cabinet of Ministers № 688), that damage is hard work (one that wickerwork not be changed without the consent of the customer), unless differently provided by take. Billet: whether the scope of sour specified in the approximation, the genuine mass of study given in the undertaking, and whether thither is excess, whether all the transactions that shuffling up the building of homes listed in the budget, there are no extra employment, which are for the purpose of to increase the overall cost of строительства. Odin of the cases described in paragraphs.

MES Gist has realized building of constructions on the reconstructed 220 kV

Posted by | Construction and insulation of a wooden house | Wednesday 5 January 2011 5:28 pm

At the place of outdoor switchgear 220 kV and 110 full installed foundations for switching equipment and lighting masts. Substation transformer capacity-to-escort increase concluded the previous target of 60 MVA. The substation volition be equipped with a microprocessor-basso equipment, relay tribute and automation, and automated process controller organization (ACS), which testament let real-sentence control of all net substation – from the primary exponent equipment to the margin alarm organization. In operation of the branch are 188 substations 35-750 kV with sum capability of 94. Study carried out within the framing of a comprehensive renovation and modernization of the substation. Substation 220 kV Kirov, set on the northwestern outskirts of the city of Volgograd, put into procedure in 1967. The total of investiture in the reconstruction of the substation will be more than 2. Index facility is 500 MVA. Over reconstruction of 220 kV Kirov began in recent 2009. Presently, the website of composite reconstruction of the master substation construction constructed – Obschepodstantsionny mastery room, pump flack, the camera switching valves, a checkpoint.


Картаtzf erh s0 ds2 iz42 lyubov vzglyad lyubo vzgly vlas9 vla85
rss
Карта